assessment update 2012 2013 preliminary results
play

Assessment Update: 2012-2013 Preliminary Results Department of - PowerPoint PPT Presentation

Assessment Update: 2012-2013 Preliminary Results Department of Accountability School Board Meeting August 22, 2013 Department of Accountability: Anyone can measure the rain; we build arks. Federal Annual Measurable Objectives (AMO)


  1. Assessment Update: 2012-2013 Preliminary Results Department of Accountability School Board Meeting August 22, 2013 Department of Accountability: “Anyone can measure the rain; we build arks.”

  2. Federal Annual Measurable Objectives (AMO)  Replaced Annual Yearly Progress (AYP)  Measures participation and achievement levels in reading and mathematics  Reports the percent of students passing across nine subgroups at the state, division, and school levels 2 Department of Accountability: “Anyone can measure the rain; we build arks.”

  3. Federal Annual Measurable Objectives (AMO) 3 Department of Accountability: “Anyone can measure the rain; we build arks.”

  4. Federal Annual Measurable Objectives (AMO) Federal AMO’s can be met by:  Exceeding the AMO based on current year’s performance  Exceeding the AMO based on a 3 year average  Reducing the previous year’s failure rate by 10%  Having less than 30 students in a subgroup 4 Department of Accountability: “Anyone can measure the rain; we build arks.”

  5. Preliminary AMO Division Reading Performance 5 Department of Accountability: “Anyone can measure the rain; we build arks.”

  6. Preliminary AMO Division Mathematics Performance 6 Department of Accountability: “Anyone can measure the rain; we build arks.”

  7. Example of AMOs Accounting for Improvement: Patrick Henry Math 7 Department of Accountability: “Anyone can measure the rain; we build arks.”

  8. State Accreditation  Measures achievement levels in English (Reading and Writing SOLs combined), mathematics, history, and science.  Only accounts for the “All Student” pass rates in each of the four academic areas.  Accreditation benchmarks were elevated this year in grades 6-12 English (+5%), grade 3 History (+20%), and grade 3 Science (+20%) 8 Department of Accountability: “Anyone can measure the rain; we build arks.”

  9. Preliminary Accreditation Results 2013-2014 9 Department of Accountability: “Anyone can measure the rain; we build arks.”

  10. Historical Accreditation Status 10 Department of Accountability: “Anyone can measure the rain; we build arks.”

  11. Preliminary Advanced Placement (AP) Results 11 Department of Accountability: “Anyone can measure the rain; we build arks.”

  12. Scholastic Reading Inventory (SRI) Data 12 Department of Accountability: “Anyone can measure the rain; we build arks.”

  13. Phonological Awareness Literacy Screening (PALS) Cohort Report 13 Department of Accountability: “Anyone can measure the rain; we build arks.”

  14. Phonological Awareness Literacy Screening (PALS) Growth Report 14 Department of Accountability: “Anyone can measure the rain; we build arks.”

  15. Coming Soon…  SAT  ACT  WIDA ACCESS for ELLs  VA On-Time Graduation and Dropout Statistics  Additional SOL and AP analyses as data become available 15 Department of Accountability: “Anyone can measure the rain; we build arks.”

  16. Questions? Contact: Department of Accountability (703) 824-6638 or Email: clinton.page@acps.k12.va.us Department of Accountability: “Anyone can measure the rain; we build arks.” 16

Recommend


More recommend