AHTD Job 061275 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) P.E. Public Officials Meeting February 7, 2012
Location Map
Location Map
South Side of River
North Side of River
Lane Configuration
Typical Section
Bridge Selection Study Goal of Study – Develop bridge types that accomplish two main objectives: • Minimize Bridge Closure Time • Most Cost Effective Structure Type
Bridge Selection Study
Bridge Selection Study
Bridge Selection Study
Bridge Selection Study
Bridge Selection Study
Bridge Selection Study
Bridge Selection Study
Bridge Selection Study Road User Cost The financial impact of the bridge closure on the traveling public. • Takes into consideration expense of traffic delays and additional miles traveled on alternate routes
Bridge Selection Study
Bridge Selection Study
Bridge Selection Study
Bridge Aesthetics
Pedestrian Underpass at Ballpark
Concept 1A
Concept 1A – Closed Barrier
Concept 1A – Open Rail
Concept 1B
Concept 1B – Closed Barrier
Concept 1B – Open Rail
Concept 2
Concept 2 – Closed Barrier
Concept 2 – Open Rail
Recommend
More recommend