a bridge home 26 a bridge home projects
play

A Bridge Home 26 A Bridge Home Projects Completed: 7 - PowerPoint PPT Presentation

A Bridge Home 26 A Bridge Home Projects Completed: 7 Construction Phase: 10 Final Design Phase: 3 Construction Funds Allocated: 1 Feasibility/CEQA Phase: 5 ** The data includes City-led and non-City-led projects .


  1. A Bridge Home

  2. 26 A Bridge Home Projects Completed: 7 ● Construction Phase: 10 ● Final Design Phase: 3 ● Construction Funds Allocated: 1 ● Feasibility/CEQA Phase: 5 ● ** The data includes City-led and non-City-led projects .

  3. Completed

  4. 711 N. Alameda (El Puente) CD 14 45 beds ● Serves 30 men and 15 women ● of the El Pueblo Community Service Provider: The People ● Concern Status: Opened ●

  5. 1215 Lodi Place (YWCA) CD 13 64 beds ● The YWCA houses 64 ● unsheltered women in the Hollywood community Service Provider: PATH ● Status: Opened ●

  6. 1533 Schrader Blvd CD 13 72 beds ● Provides shelter for men and ● women of the Hollywood community Service Provider: PATH ● Status: Opened ●

  7. 1920 W. 3rd ST. CD 1 41 occupancy ● Single females and women- ● led families Service Provider: PATH ● Status: Opened ●

  8. Downtown Women’s Center CD 14 25 beds ● Services unsheltered women ● and women in SKid Row Service Provider: DWC ● Status: Opened ●

  9. 5965 S. St Andrews Place CD 8 100 beds ● Serves 63 men and 37 ● women of the South Los Angeles Community Service Provider: ● SSG/HOPICS Status: Opened ●

  10. 1403 Gardner Street CD 4 30 beds ● Serving unsheltered female ● residents of Hollywood Service Provider: Weingart ● Status: Opened ●

  11. Construction Phase

  12. Aviva CD 4 15 TAY families ● Serving unsheltered TAY ● females residents of Hollywood Service Provider: PATH ● Status: Ending construction; ● Opening mid-October 2019

  13. Sylmar Armory CD 7 (12860 Arroyo St.) 85 beds ● Serves as a shelter for women ● experiencing homelessness in the San Fernando Valley Service Provider: LA Family ● Housing Status: Construction ●

  14. 625 La Fayette Place CD 10 70 beds ● Will serve the men and women ● of the Wilshire Center and Koreatown neighborhoods Service Provider: Salvation ● Army Status: Construction ●

  15. 1819 S. Western Ave CD 10 15 beds ● Women-led families and single ● women Serves unsheltered community ● members of the 10th Council District Service provider: 1736 Family ● Crisis Center Status: Construction ●

  16. 100 Sunset Ave CD 11 154 beds ● Provides shelter for 63 men, ● 47 women, and 54 youth in the Venice community Service Provider: PATH ● Status: Construction ●

  17. VA Campus CD 11 (11303 Wilshire Blvd) 100 beds ● Serving male veterans in West ● LA area Service provider- TBD ● Status: Construction ●

  18. 1426 Paloma St. CD 14 119 beds ● Services unsheltered men and ● women in the Downtown area Service Provider: Home at Last ● Status: Construction ●

  19. 2316 E Imperial Hwy CD 15 100 beds ● 70 male beds and 30 female ● beds providing shelter for the Watts neighborhood Service Provider: Salvation ● Army Status: Construction ●

  20. 2817 S Hope Street CD 9 100 beds ● Serves 64 men and 36 ● women Service Provider: Volunteers ● of America Los Angeles Sub with St. John’s Status: Construction ●

  21. Salvation Army Zahn Center CD 14 (832 James Wood Blvd) 60 Beds ● Currently examining the ● possibility of a new address for this site

  22. Final Design Phase

  23. 7251 Canoga Avenue CD 3 85 beds ● Shelters male and female ● Canoga Park residents Service Provider: LA Family ● Housing. Status: Final design phase ●

  24. 828 Eubank Ave CD 15 100 beds ● Serves both men and women ● in the Wilmington Community Service Provider: U.S. Vets ● Status: Final design phase ●

  25. 515 N Beacon Street CD 15 100 beds ● Provides service for ● unsheltered men and women in the San Pedro Community. Service Provider: PATH ● Status: Final design phase ●

  26. Construction Funds Allocated Phase

  27. 13160 Raymer Blvd CD 2 85 beds ● Provides beds to unsheltered ● women and men in the Valley area. Service Provider: Hope of the ● Valley Status: Construction Funds ● Allocated

  28. Feasibility/CEQA Phase

  29. DWP Storage Maintenance Yard CD 2 100 beds ● (7600 Tyrone Ave.) Provides housing for men ● and women in the Van Nuys Community Service Provider: TBD ● Status: Feasibility/CEQA ● phase

  30. 3248 Riverside Drive CD 4 100 beds ● Serves 64 men and 36 women ● of the Los Feliz community Service Provider: TBD ● Status: Feasibility/CEQA phase ●

  31. Orange Line Station CD 6 (14333 Aetna Street) 70 beds ● Single adult males/females in ● the Van Nuys community Service Provider: TBD ● Status: Feasibility/CEQA ● phase

  32. 5215 Figueroa CD 9 45 beds ● Serves 30 men and 15 ● women in the Flower/Grand corridor Service provider: TBD ● Status: Feasibility/CEQA ● phase.

  33. Civic Center CD 14 (310 N. Main Street) 100 Beds ● 66 beds for men and 34 beds ● for women in Downtown Los Angeles Service Provider: TBD ● Status: Feasibility/CEQA ● phase

Recommend


More recommend