COX HIGH SCHOOL AMPHITHEATER/SITE IMPROVEMENTS
NEW SITE PLAN NEW POWER PEDESTAL NEW SITE LIGHT RAMP UP EXISTING CONCESSIONS STAND PLATFORM NEW 8-FT SIDEWALK TO NEW 8-FT GATE RAMP UP NEW CONCRETE PAVING NEW PAVERS AT PICNIC AREAS NEW RAISED PLANTER BED WITH INTEGRATED SEAT WALL NEW PAVERS AT PICNIC AREA / AMPHITHEATER SEATING IMPROVEMENTS SUMMARY SEAT WALL 900-LF NEW AMPHITHEATER STAGE WITH EXISTING SCHOOL RAMPS AND TRANSLUCENT CANOPY PAVERS 3,800-SF CONCRETE 6,100-SF PLANTERS 4,800-SF TREES 9 FENCING 92-LF GATES (1) 10-FT NEW CONCRETE PAVING (2) 8-FT NEW PAVERS AT PICNIC AREAS POWER PEDESTALS 18 NEW 8-FT GATE SITE LIGHTS 12 NEW RAISED PLANTER BED WITH STAGE 620-SF INTEGRATED SEAT WALL CANOPY NEW 6-FT BLACK FENCE WITH FURNITURE 10-FT GATE
VIEW OF NEW ENTRY GATE
VIEW TOWARDS AMPHITHEATER STAGE
VIEW FROM AMPHITHEATER STAGE