6/18/2015 Biosciences eastern and central Africa – International Livestock Research Institute (BecA ‐ ILRI) Hub Mobilizing biosciences for Africa’s development LABORATORY MANA LABORA MANAGEM GEMENT NT AND AND EQ EQUIPMENT O OPERA ERATIONS TRAINI TRAINING W NG WORKS RKSHOP Venue: Rwanda Agriculture Board (RAB) – Rubona Station 15th-19th June 2015 BecA ‐ ILRI Hub Nairobi, Kenya 15 ‐ 19 June, 2015 Equi Equipment nt - - Speci pecification Prese Presentation 1 17 • Each equipment has specs e.g. Laboratory Equipment • Work environment specs • Installation specs • Power specs Specification, Installation & Certification • Utilities specs • Installer/Tech personnel specs • User specs Presentation by: Wanjawa W. B. – ILRI Engineering Department, Nairobi, Kenya Equi Equipment nt – – Speci pecification cont cont. Equipment Equi nt – – Speci pecification cont cont. • Case: • Temperature (Ambient/Operation) 1. Safety Cabinet • Level ground/Bench top 2. Centrifuge • 220V/240V or 110V/115V • 1-phase or 3-phase • Socket type – 2pin, 3pin, Square/Round • Need for water, steam • Certified Technicians, General user • Trained user, General user 1
6/18/2015 Equi Equipment nt – – Inst nstallation cont cont. Equi Equipment nt - - Inst nstallation • On site • Work environment specs • Ensure environment is ready • Packing list • Unpack • Confirmation of items • Physical inspection and checks • Installation checklist • Go ahead with installation or • Connections • Send back • Inspection/Checks • Move to site • Switch on utilities • Test run Equipment Equi nt – – Inst nstallation cont cont. Equi Equipment nt – – Cer erti tification • Case: • Equipment state 1. Safety Cabinet • Should be working 2. Centrifuge • Ensure it is repaired/maintained • Establish regulatory requirements • Confirm what should be done • Internal/External input Equi Equipment nt – – Cer erti tification cont cont. Equi Equipment nt – – Cer erti tification cont cont. • Test gears • Case: • Certification report 1. Safety Cabinet • Pass or Fail 2. Centrifuge • Usually put sticker/tag on machine status • Corrective action for Fail • Schedule for next certification 2
6/18/2015 Pract Practical / / Demo Demo End of Presentation 1 End of Prese 17 • Developing a maintenance schedule for a laboratory complex….. • 30 minutes work • 30 minutes presentation • Ready… • Q&A first Thank you Barack Wamkaya Wanjawa Engineering Maintenance Coordinator ILRI Nairobi Kenya Engineering Department b.wanjawa@cgiar.org Mobilizing biosciences for Africa’s development http://hub.africabiosciences.org 3
Recommend
More recommend