3-18-2020 Rich Proszek P.E. Senior Design Engineer Mixed Use Trail - PowerPoint PPT Presentation

3-18-2020 Rich Proszek P.E. Senior Design Engineer Mixed Use Trail (Spruce to Elm & Main) Replace Water Distribution Main Storm Improvements Street Rebuild (Spruce to Elm & Main) Update Sandifur Bridge Parking Lot


  1. 3-18-2020 Rich Proszek P.E. – Senior Design Engineer

  2. � Mixed Use Trail (Spruce to Elm & Main) � Replace Water Distribution Main � Storm Improvements � Street Rebuild (Spruce to Elm & Main) � Update Sandifur Bridge Parking Lot Timeframe: July-October 2020 �

  3. Retaining Wall Gravel “Lookout Pad” 3ft - 10ft Tall Trail New curb & storm drainage structures

  4. 24’ Street, Water, Storm Wide Improvements(Spruce to Elm) Street Parking Groundwater Pullouts Collection & Piping

  5. Black Vinyl Fence or Rail for safety. Trail Continues down Elm.

  6. Art Installation Improved River Access Path Trail Connection 30+/- Parking Stall Lot

  7. � Reduce untreated storm water into the river � Storm Improvements (Clarke, Maple, Wilson) � Replace Water Distribution Main(Clarke, Maple, Wilson) � Sanitary Sewer Improvements (Wilson) � Street Rebuild (Clarke, Maple, Wilson) � Storm water treatment swales (Clarke & Elm, Water & Ash) Timeframe: July-October 2020, Possibly 2021 �

  8. Storm Sewer & Water Main Piping Groundwater Collection & Piping

  9. Storm Swale Storm Piping to Water & Ash City Owned Lots

  10. Reconfigured “turn around” and water access point. Storm Swale Storm Piping From Elm & Main Storm Lift Station

  11. Above Ground Work -New Asphalt Underground Work -Sidewalk (North Side) -Sanitary Sewer Lines & Structures -Gravel Parking Strip (South Side) -Storm Lines & Structures -Water Mains -Groundwater Collection & Piping -Communication Conduit