Start Year Construction Section Actual*/Estimated Cost 2010 S1 (Galloway & BOV Bridges) $ 9.8 million* 2012 Advanced ITS $ 3.4 million* 2012 Ford Ave. Bridge on I-95 $ 5.8 million* 2012 S2 (Richlieu Road Bridge) $ 7.9 million* 2012 Wetland/Stream Mitigation $ 1.1 million* 2013 B (includes ORT @ DRB) $ 61.4 million* 2014 D10 (includes I-95-E) $149.2 million* 2015 Mainline ITS (Multiple) $ 12.0 million 2015 D20 (includes I-95-F) $120.0 million
Go Goal: al: To To in incr crease ease the % o % of lane ne mil iles es to o a min inim imum um LOS ‘D’ in urban areas
Ov Overhead rhead Br Brid idges ges ne need d Repl placed aced Fir irst st
70 mph ph Bl Blue ue Mou ountain ntain Tu Tunn nnel el to o Mor organtown gantown In Int. 70 mph ph systemwide emwide Spr prin ing g 2015
CM/C /CI I Tu Tuscarora arora Tu Tunn nnel el Rehab hab Fee: $ 6,500, 00,000 000 CI I Service vices s MP. P. 319-326 326 To Total al Recon. n. Fee: : $ 20,000 000,00 ,000 CI I Service vices s MP. P. A3 A31-A44 44 TR TR (2 (2 cont ntr.) r.) Fee: $10,000 ,000,000 ,000 each CM MP. P. 149-155 155 To Total al Recon on. Fee: $8,000, 000,000 000
Op Open-End End Design sign (2 (2 cont ntra racts) cts) Fee: $ 950,00 ,000 0 each each Op Open-End End QA Ins nspe pection ction & & Te Testin ing Fee: $ 1,500, 00,000 000 Op Open-End End CI I – West st (2 (2 con ontracts) tracts) Fee: $1,500, 500,000 000 each Op Open-End End Coat ating ing Cons nsult ultant ant Fee: $1,500, 500,000 000
Gary L. Graham, am, P.E. Assistant t Chief f Enginee eer – Design gn PA Turnpike ke Commiss ssion