12/1 3 /2018 Proposed Roadway Improvements Main Street Paving & • 0.56-mile (3,000 LF) concrete roadway with curb Streetscape Reconstruction From FM 731 (Crowley Road) to Beverly Street and gutter • Curb inlets and an underground drainage system • Roundabouts at Beverly Street and Roberts Street • On-street parking improvements 1 2 Proposed Streetscape Improvements Proposed Typical Sections • Protected 6-foot wide bike lanes • 7-foot to 11-foot wide Americans with Disabilities Act (ADA) compliant sidewalks • Pedestrian light posts and landscape planting • Street furniture – benches, trash receptacles, bike racks, tree grates • Enhanced paving pattern on sidewalks and pedestrian crosswalks 3 4 Proposed Typical Sections Project Cost and Construction Schedule • Estimated Cost: $7.2 Million • Anticipated Construction Start: Mid-2019 • Anticipated Construction Duration: 1 Year 5 6 1
12/1 3 /2018 Main Street Rendering Main Street Rendering 9 10 Main Street Rendering 11 2
Recommend
More recommend