Th The Re Republi ublic of Su Sudan an Su Sudan an Read adiness iness Prepara aration tion Proposal posal (R-PP) PP) 17 th th Presen sentation tation to 17 PC Me Meeting ng of the FCPF 1
Sudan dan RED EDD+Team +Team Som ome e 34 34 Sudanese danese ex experts erts, 60% 60%-40 40% % Male/Fe le/Female male Tw Two o International ernational Con onsultants sultants
Republi lic c of Su Sudan an: The Count ntry ry Si Situ tuat atio ion Sud udan n po post Jul uly 2011 Parameter ameter 1900 1900 2012 2012 www.world worldofm ofmaps.net Land Area 2.7 Mkm² 1.9 Mkm² Arable le land n.a. 84 Mha Forests rests 60 Mha 22.6 Mha Range gela lands nds 100 Mha 96 Mha Populati ulation on 2.0 M 33.4. M Animal als 10 M 120 M
Sudan dan REDD+ DD+ Ul Ultima timate te Objec jective tive: “ Conserving the country’s renewable na natural ral re reso source urces s pa part rticu icularly larly for orests ests, , wo wood odlands, lands, ra rang nge e re reso source urces s an and d wi wildl dlife ife ha habit itats, ats, as asse sessment ssment of of the heir ir pr pres esent ent con ondi dition tion an and d su subseque sequently ntly su subje ject ct the hem m to o su sust stainab ainable le man anagement agement an and d max aximizin imizing g the heir r di dire rect ct an and d ind ndir irect ect ben enef efits its in n a pa a part rticipati icipative, ve, tra ransp nspare arent nt an and d eq equitabl table e man anner ner .”
TA TAP Rep P Report ort Ma May y 2014 Component TAP Synthesis TAP Synthesis Review Review for PC16 PC17 2014 1 a. National Readiness Management Arrangements Partially met Met 1 b Information Sharing and Stakeholder Dialogue Met Met 1 c Consultation and Participation Process Met Met 2 a Land Use, Forest Law, Policy and Governance Largely met Met 2 b REDD+ Strategy Options Met Met 2 c Implementation Framework Largely met Met 2 d Social & Environmental Impacts during Preparation Met Met and Implementation 3 Reference Level Partially met Largely Met 4 a Monitoring Emissions and Removals Largely met Met 4 b Other Multiple Benefits, Impacts and Governance Met Met 5 Schedule and Budget Met Met 6 Program Monitoring & Evaluation Framework Largely met Met
1a. Nat atio ional nal Read adiness iness Man anag agemen ment t Arran angeme gement nts s Mea eans s & S Step eps s Towards ards Rea ealizati ation on of a National al REDD+ Programm gramme • Anal alys ysis is of of the he cur urrent nt situa uatio ion • Setting ng up up neces essar sary y instituti tutional nal struc uctures ures and d sup uppo port rting ing arran angem gements ents to o mana nage ge and d co-or ordina dinate e the he REDD+ + Readine iness s pr proc ocess ss to r o resul ult in de develop elopment ment and d impl plem emen entatio ation n of of a co cohe heren ent and d suc ucce cessfu sful REDD+ D+ Strategy egy and d a MRV system em, , tog ogether ther wi with h ot othe her attend ndant ant com omponent ponents • Ensure e tha hat the he National nal REDD+ + Prog ogram amme e ha has the he neces essar sary y enab abling ing de decision-maki making ng aut uthor hority ity, , expe pert rtise, ise, and d wi wide de-ran anging ging stake keholder der pa participat ipatio ion • Ensure e tha hat the he REDD+ + pr prog ogra ramme me is sup uppo port rted ed by tech chnical ical ca capa paci city ty & & effecti ective ve com ommunicati munication • Mainst nstrea reaming ng REDD+ + into o broade oader cros oss-sec ectoral oral pl plans s and pr prog ogramm rammes, es, including uding goa oals s of of natio ional nal de developmen lopment, t, CC and REDD+
Sudan National REDD+ Programme Implementation Body Structure Federal level: National REDD+ steering Committee (NRSC) State level : Includes Line (Policy making level (chaired by Minister EFPD in his capacity as President, Includes all state of HCENR) Ministries focal points, local academia, CC focal community points, NGOs, groups (CBOs, CSOs, Media, and NGOs, Technical Advisory Committees (TAC) Research. Associations), climate change UN- agencies : focal point in UNEP, UNDP & States (6) Technical Working Groups : Strategy & Policies and strategy, FAO MRV, Safeguards System, Grievance Mechanism, Monitoring System, Governance REDD+ forum Programme management/ and or coordination unit 4 outcomes of Sudan R-PP
Grievan ances es Ma Manag agem ement ent & Conf nflicts cts Resol oluti ution on • Sudan dan has long g ex experi rience ce in conflict ct reso esoluti lution on bet etwee ween gover ernmen ment t & c commun unities es including ing from om forest rest res eser erva vation tion since e ea early y 20th cen entury ry. • Poten ential al issues: sues: Shari aring of ben enefi efits s and co-benefits benefits, , landlessn essnes ess, , eq equity ty , , sust stain ainab ability y of res esou ource rce use, , conflict ict of inter erest st bet etwe ween differe erent land users ers and gover ernmen ment authorit orities es at local, , state e or national al lev evel el • Prospecti ospective ve Grieva evance nces s Managem ement ent & C Confli flicts cts Res esolut lution on Mec echanism anism: : Compl plai aint t rec eceipt eipt, , inves estigation ation, , ruling/v /verdict erdict and monitorin ring & d databas base e formation ation • Ther ere e is a Fed ederal eral Burea eau u for r Grievances evances affiliated ated to the e National al Asse sembl mbly y (Parl rliamen ament) ) and the e en envisaged aged mec echanism anism would d build d upon on and streng engthen hen the e ex existing sys ystem em • Unreso esolved lved issues sues wo would ld be e ref eferre rred d to High gher r Just stice ce (Minist stry ry of Adel el)
1b. b. Inf nformation mation Sh Shar arin ing g an and St Stak akeholder older Dia ialo logue gue Sudan n RED EDD+ D+ process ess plannin ing g devel elop oped ed through ough a broad d based d consultati ultative ve process ess where re releva evant nt stakeh kehol olde ders rs have been en involved ved via: • Planni ning ng worksho kshops ps and meet etin ings gs at local, l, state te and nationa onal l levels ls • Group up discussi ssion n sessi sions ons local , state te & natio ional nal levels ls • Compre prehe hensi nsive e review ew of REDD+ D+ relate ted d litera erature ture & jargo gon n and transl nslation tion into o Arabi bic c language uage and dissem eminati nation on • Nationa onal l validati ation on worksh kshop ops s (key ey stakeh kehol olde ders rs at a nationa onal l level ) A. Incept ption on Stage age August ust 2009 9 – Septe tembe mber r 2011 11: : Encomp ompassed ssed in-ho house use consultati ultations, ons, meet etin ings, gs, worksho kshops ps & round-ta table ble semin inars rs to identify ntify potent ential al stakeh kehol olde der r group ups s & partne ners B. Secon ond d stage ge Feb ebruary ruary - April il 2012 : Early y consu sultation ltation & participat icipation on process cess and culminated in the development of Sudan’s First Draft REDD+ Preparedness Strate ategy C. Third d stage ge August gust 2012 2 – Novemb ember er 2013 3 : ende ndeavoure voured d to formulate mulate Sudan’s REDD+ D+ Readin iness ess Prep eparatio ration n Propo posa sal ( R-PP) P) D. Earl rly y 2014: 4: Con onsultation sultation process ess is part of Nationa onal l Prog ogramme ramme of FNC
Recommend
More recommend