LOOKING AHEAD YIOT EXPANSION NOV 3, 2018 , AGENDA Introduction SNS Presentation Sanctuary Seating & Growth Beit Medrash Social Hall Youth Programming Lobby Design & Function Capital Campaign Road


  1. LOOKING AHEAD YIOT EXPANSION NOV 3, 2018 • ט״עשת , ןושׂח ו״כ

  2. AGENDA Introduction SNS Presentation Sanctuary Seating & Growth Beit Medrash Social Hall Youth Programming Lobby Design & Function Capital Campaign Road Map & Planning Q&A

  3. RABBI BINYOMIN KROHN INTRODUCTION

  4. JOHN LIGNOS & JOHN FOTIADIS SNS ARCHITECTS & ENGINEERS

  5. GARY STEINMETZ, YAACOV WEINSTOCK SANCTUARY SEATING & GROWTH

  6. SHELDON LIEBB BEIT MEDRASH

  7. EXISTING BEIT NEW BEIT MEDRASH MEDRASH + 1,000 SQ FT 1,730 SQ FT 730 SQ FT

  8. BENA SCHWARTZ SOCIAL HALL

  9. EXISTING SOCIAL HALL 1,334 SQ FT NEW SOCIAL HALL 2,490 SQ FT + 1,156 SQ FT

  10. DEENA ROSENBERG, HEZZY JESIN YOUTH PROGRAMMING

  11. CURRENT YOUTH NEEDS • 400 children within the community • On average, 100-125 attend groups each Shabbat: • 15-25 in each of Nursery, PreK, Grade 1-2 Boys and 1-2 Girls • 10-30 in Junior Congregation • Currently use six youth spaces • Three on main floor • Two upstairs • Beit Medrash

  12. BENEFITS OF PLANNED EXPANSION • 8 classrooms • From 1,250 sq ft to 2,595 sq ft • Rooms can combine or divide • Locked storage • Kitchen and bathroom access • Appropriate emergency exits • All on one floor for noise and flow control • Potential source of rental income

  13. STEVE HORWITZ, ISSAR KIEFFER & JEREMY FRANK LOBBY DESIGN 
 AND FUNCTION

  14. LOBBY • New entrance to the building • Congregation and socialization • Central access to coat room, bathrooms, stair and elevator • Combination of form and functionality • Coat room out of view

  15. GALLERIA • Bridge between old and new • Separation between main sanctuary and social hall • Reception area • Double volume and glass allows light into building • Wide, open space • Wide airlock access to sanctuary mitigates noise • Centrally located washing station • Bookcases and cubbies • Three exits prevent congestion

  16. RUVEN ELLBERGER CAPITAL

  17. $4M $3.75M $3M PLEDGES BUILDING FUND SISTERHOOD $2M $1.20M $1M EXPANSION 
 CAMPAIGN $0M TARGET CURRENT

  18. THE PROCESS CAPITAL SUB-COMMITTEE • Ruven Ellberger • Estimate costs and collections • Gamy Frankel • Fundraising campaign and dedications • Michelle Jaffe • YOU! • Hezzy Jesin • Esta Luber • Michael Wimpfheimer • Shlomo Yaros

  19. YAAKOV PULTMAN ROAD MAP 
 & PLANNING

  20. Q&A