AFTER A TWO Focused on Restoring and Preserving our Church and Rectory YEAR STUDY: Efficient use of available funds Planning for future renovations Obtain professional guidance Durable products
THREE PHASES Seal Seal the buildings Restore Restore the interior Access for all by efficient use of Access space
THREE PHASES Seal Seal the buildings PHASE 1
Courtyard Bus loading Platform
Steps to Music Room Steps to Rectory
Sunken Curbing Flooding Stairwells
Worn Out Gutters
Open Air Vents Uncontrolled Run-off
Water Entering Our Foundations
Rotting Windows & Stairs
WHAT WILL BE DONE? Remove Regrade Seal window New gutters pavement in parking lot wells courtyard Pipe water Replace Remove away from windows unused stairs church
PHASE 2 – Remove and Remove and replace Kneelers replace RESTORE THE HISTORIC Remove and INTERIOR Remove and restore Pews restore Replace Replace all Flooring Choir Upgrade Choir Loft Railing Move Move confessional
Pews & Kneelers
Flooring
PHASE 3 Ramp and Planning Stairway to access to ahead Courtyard Cafeteria LULA Lift
Phase 3 Stairway & Lula Lift Street Level Cafeteria Level
GLORY BE TO ST. PATRICK’S, AS IT WAS IN ITS BEGINNING, IS NOW, AND WILL BE FOR GENERATIONS TO COME, AMEN.