SLFPAW Flood Protection Features St. Charles 2 3 Key 80 Miles Levees & Floodwalls MRL 33 Miles River Levees HPL 47 Miles Hurricane Levees Interior 1 67 floodgates & 35 valves Algiers Canal 2 pump stations +1 WCC 1 2 sector gates +1 Bayou Segnette 2 (+1 at Lapalco) Harvey Complex 3 SOUTHEAST LOUISIANA FLOOD PROTECTION AUTHORITY-WEST 2
WJLD Obligations- Levee Lifts Prior to Armoring 1 4 6 3 5 Construction Projected Priority Project Cost Estimate Lift Date 1 WBV-16.2, Westwego Levees $ 842,157 2017 2 WBV-14e.2, V-Line Marrero $ 4,171,059 2017 3 WBV-15a.2, Lake Cataouatche East $ 6,515,080 2017 2 4 WBV-18.2, Lake Cataouatche West $ 3,396,824 2018 5 WBV-14b.2, Orleans Village to Oak Cove $ 4,009,639 2018 6 WBV-14c.2, Westwego to Orleans Village $ 6,610,425 2019 Total $ 25,545,183 SOUTHEAST LOUISIANA FLOOD PROTECTION AUTHORITY-WEST
WJLD Obligations- Major Structures (RR&R) Major Structures: • Must be de-watered every 15 years to make major Repairs, Rehabilitation and Replacement to components. Construction Projected Priority Project Cost Estimate Lift Date 1 Dewatering Lapalco Complex $ 1,100,000 2020 2 Dewatering Bayou Segnette $ 1,100,000 2025 3 Dewatering West Closure Complex $ 4,400,000 2025 Total $ 6,600,000 SOUTHEAST LOUISIANA FLOOD PROTECTION AUTHORITY-WEST 4
WJLD Project Needs- 10 year forecast • Levee Lifts Prior to Armoring ($26 M) • Dewatering West Closure Complex (~$4.4 M) • Dewatering Bayou Segnette Complex (~$1.1 M) • Dewatering Lapalco Complex (~$1.1 M) • Additional Levee Lifts and Armoring in 2024 (~30 M) • Total Project Needs $62.6 M SOUTHEAST LOUISIANA FLOOD PROTECTION AUTHORITY-WEST 5
WJLD Funds- 10 year forecast • Capital Project: $ 6.3 M • Bond: $7.5 M • Ten year projected excess revenue $5 M • Projected Available Funds $18.8 M SOUTHEAST LOUISIANA FLOOD PROTECTION AUTHORITY-WEST 6
Additional Millage The WJLD collects roughly $1 million per mill in West Jefferson Total Project Needs: $62.6 M Projected available funds: -$18.8 M Deficiency $43.8 M A $43.8 million deficiency over ten years translates to an additional 4.38 mills per year. The Authority would like ask for 4.75 mills for a ten year period for flood protection. SOUTHEAST LOUISIANA FLOOD PROTECTION AUTHORITY-WEST 7
Summary • LA R.S. 38:101.C requires that, “ Upon completion of the construction of the hurricane protection projects, the responsibility for maintenance and operation of the hurricane protection system shall be assumed by the West Jefferson Levee District, the Orleans Levee District (Algiers Levee District) , Plaquemines Parish, and the Lafourche Basin Levee District, respectively for those portions of the system within each of the parishes .” • State of Louisiana is not responsible for Operation and Maintenance of the system. • The system needs to be maintained to provide the 100 year level of flood protection and to maintain certification required in the National Flood Insurance Program (NFIP) in order to provide Jefferson Parish affordable flood insurance rates. • Additional millage would equate to less than $4 per month for the average value of a home on the Westbank (Average home value on Westbank is $175k). SOUTHEAST LOUISIANA FLOOD PROTECTION AUTHORITY-WEST 8
Questions? John R. Monzon, P.E., Regional Director 504-340-0318 jmonzon@slfpaw.org 7001 River Road Marrero, LA 70072 Visit our website: www.slfpaw.org SOUTHEAST LOUISIANA FLOOD PROTECTION AUTHORITY-WEST 9