WELCOME TO WELCOME TO CONTRACT SELECTI ON CONTRACT SELECTI ON WORKSHOP WORKSHOP MARCH 02, 2006 MARCH 02, 2006
WORKSHOP AGENDA WORKSHOP AGENDA � FM 659 (ZARAGOZA RD) CORRIDOR FM 659 (ZARAGOZA RD) CORRIDOR � � EVERGREEN CONTRACTS EVERGREEN CONTRACTS � � TRAFFIC MODELING (EVERGREEN) TRAFFIC MODELING (EVERGREEN) � � CONSULTANT CONTRACT SECTION CONSULTANT CONTRACT SECTION � STAFF STAFF
PURPOSE AND NEED PURPOSE AND NEED � Develop alternatives in order to upgrade Develop alternatives in order to upgrade � existing level of service along FM 659 existing level of service along FM 659 (Zaragoza Rd.) including off system portion (Zaragoza Rd.) including off system portion of Zaragoza Road. of Zaragoza Road.
FM 659 (ZARAGOZA RD.) FM 659 (ZARAGOZA RD.) SI TE LOCATI ON SI TE LOCATI ON FM 659 @ LP 375 FM 659 @ LP 375 � � FM 659 @ ALAMEDA FM 659 @ ALAMEDA � � FM 659 @ UPRR FM 659 @ UPRR � � FM 659 @ FM 76 FM 659 @ FM 76 � � FM 659 @ I - FM 659 @ I -10 10 � � FM 659 @ GEORGE FM 659 @ GEORGE � � DI ETER DI ETER FM 659 @ MONTWOOD FM 659 @ MONTWOOD � �
FM 659 (ZARAGOZA RD.) FM 659 (ZARAGOZA RD.) � Project Components: Project Components: � - Intersection Improvement Intersection Improvement - - Schematic Development Schematic Development - - Environmental Environmental - - Traffic Analysis Traffic Analysis - - Transportation Management System Transportation Management System -
FM 659 (ZARAGOZA RD.) FM 659 (ZARAGOZA RD.) cont’ ’d d cont - Drainage Analysis Drainage Analysis - - Preliminary R.O.W. Needs Preliminary R.O.W. Needs - - Access Management Access Management - - Utility Conflict Utility Conflict - - Value Engineering Value Engineering - - Aesthetic Improvement Aesthetic Improvement -
DELI VERABLES DELI VERABLES FM 659 Programming Assessment � I nformation Provided on CD: � Zaragoza Rd. @ LP 375 (Cesar Chavez Border Highway) � - LP 375 Topo. Dgn FM 659 (Zaragoza Rd.) @ SH 20 (Alameda) � - Alameda – Zara-Schem. dgn - Alameda – Zara-2d. dgn (Topo) FM 659 (Zaragoza Rd.) @ UPRR � - UPRR- Zara-2d. dgn (Topo) - UPRR- Zara-Schem. dgn
DELI VERABLES cont’ ’d d DELI VERABLES cont FM 659 (Zaragoza Rd.) @ FM 76 ( FM 76 ( Northloop Northloop) ) � - FM 76 FM 76 – – Zara Zara- -2d.dgn ( 2d.dgn ( Topo Topo) ) - FM 659 (Zaragoza Rd.) @ I H I H – – 10 10 � - I H I H- -10 Zaragoza 10 Zaragoza – – orthos.dgn orthos.dgn - FM 659 (Zaragoza Rd.) @George Dieter George Dieter � - GDieter GDieter- - Zaragoza Zaragoza – – orthos orthos. . dgn dgn - FM 659 (Zaragoza Rd.) @ Montwood Montwood � - Zaragoza Zaragoza – – Mtwd Mtwd. . dgn dgn - - Zara Zara Mtwd Mtwd. . – – I ntersection.dgn I ntersection.dgn -
PURPOSE AND NEED FOR PURPOSE AND NEED FOR OUTER LOOP STUDY OUTER LOOP STUDY To provide an alternate route for far east To provide an alternate route for far east El Paso and improve mobility and roadway El Paso and improve mobility and roadway connectivity between US 62 /180 (Montana) connectivity between US 62 /180 (Montana) & the Mission Valley. & the Mission Valley.
OUTER LOOP STUDY OUTER LOOP STUDY � Project Components Project Components: : � - Corridor Study Corridor Study - - Feasibility Study Feasibility Study - - Route Study Route Study - - Intersection Improvement Intersection Improvement - - Schematic Development Schematic Development - - Environmental Environmental - - GIS GIS -
OUTER LOOP STUDY OUTER LOOP STUDY cont’ ’d d cont - Traffic Analysis Traffic Analysis - - Transportation Management System Transportation Management System - - Drainage Analysis Drainage Analysis - - Preliminary R.O.W. Needs Preliminary R.O.W. Needs - - Access Management Access Management - - Utility Conflict Utility Conflict - - Value Engineering Value Engineering - - Aesthetic Improvement Aesthetic Improvement -