Use of multi wires chambers in air for profile measurements of - - PowerPoint PPT Presentation

use of multi wires chambers in air for profile
SMART_READER_LITE
LIVE PREVIEW

Use of multi wires chambers in air for profile measurements of - - PowerPoint PPT Presentation

Use of multi wires chambers in air for profile measurements of intensive beams at IHEP (Protvino) 4 th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) Neutrino beams at IHEP Years Proton Neutrino


slide-1
SLIDE 1

4th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino)

Use of multi wires chambers in air for profile measurements of intensive beams at IHEP (Protvino)

slide-2
SLIDE 2

4th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 2

Neutrino beams at IHEP

  • 1. ν (anti-ν)-inclusive scattering,

structure functions, νe-νµ universality, exclusive channels

  • 2. prompt neutrinos
  • 3. νe-oscillations with Neutrino

Calorimeter SKAT Bubble Chamber (up to 1990); JINR-IHEP Neutrino Calorimeter νµ , anti-νµ focused beam; beam-dump; short decay path Up to 1.4x1013 (booster), 29 bunches, 5µs spill duration 1985

  • 2003
  • 1. µ-pairs in ν-interactions;
  • 2. search for short-lived particles

using nuclear emulsion;

  • 3. σtot(νN), quasi-elastic scattering,

including limits on νµ-oscillation parameters, νµe-scattering, etc.

  • 4. prompt neutrinos (charm production

in pFe-interactions) ITEP Spark Neutrino Detector νµ , anti-νµ focused beam; beam-dump Up to 2x1012, 30 bunches, 5µs spill duration 1974

  • 1982

Results Detector(s) Neutrino beams Proton beam Years

slide-3
SLIDE 3

4th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 3

Construction

Mechanical construction of cham ber ( type A)

116 wires

1 2 15 16

Vbias Vbias

116 wires

Vbias

a d b c 1 2 15 16

Y profile Beam

3 mm 120mm 156mm 1 16

element b element a and d X profile

slide-4
SLIDE 4

4th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 4

Construction - 2

Main param eters of cham ber A and B 116 wires, 1mm step, beryllium-bronze alloy 116 wires, 1mm step, beryllium-bronze alloy Bias plane 16 strips, 140mm working area 14 central + 2x12 wires connected in parallel, 38mm working area Construction Signal electrode 3mm 3mm Distance between signal and bias plane 1mm 0.8mm Distance between wires/strips 40 x 8mm wire of ∅ 200 Size aluminum beryllium-bronze alloy Material Chamber B Chamber A

slide-5
SLIDE 5

4th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 5

Electronics

Schem atic draw ing

chamber 20m ADC + memory

Tim ing diagram

τ ≥ 100µs beam digitalization 5µs 5-10µs 5µs Time Signal

slide-6
SLIDE 6

4th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 6

Measurements (vacuum)

Originally the chambers were used inside of beam pipe under a pressure of ~ 10-2 torr Beam profile for focused (chamber A) and wide beam (chamber B)

Channel number Channel number

16 mm 140 mm

Beam profiles

Chamber A Chamber B

Num ber of δ-electrons

Number of -electrons per proton (measured with Vbias= 0): chamber A – 0.03, chamber B – 0.01

slide-7
SLIDE 7

4th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 7

Measurements (vacuum) - 2

Linearity

Chamber signal, relative units 1.0• 1013 Beam intensity, protons/ cm 2

Chamber A spill duration varied from 20 ns to 5s chamber signal is a sum of 14 central wires signals intensity measured by BCT Vbias= 0 the same dependency was observed for chamber B too

slide-8
SLIDE 8

4th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 8

Measurements (vacuum) - 3

Dependence of signal on pressure and bias voltage

chamber signal is a sum of all wires signals

Bias voltage, V Chamber signal, relative units

P ~ 1 Torr P ~ 2x10-1 Torr P ~ 5x10-2 Torr P ~ 5x10-3 Torr for Vbias= 0 the signal is equal for all pressures after first 1-2 years of use all chambers were operated with Vbias= 0

slide-9
SLIDE 9

4th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 9

The chambers in air

Focused neutrino beam

beam-pipe target chamber

1985 - 1994

beam ~ 5m ~ 5-7m

Short decay path beam

target absorber chamber beam-pipe ~ 10m

~ 1996

beam

slide-10
SLIDE 10

4th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 10

Measurements (air)

Proton intensity in 1012 protons per spill (5s) Proton intensity in 1012 protons per spill (5s)

Linearity

Chamber signal, relative units Chamber signal, relative units

slide-11
SLIDE 11

4th workshop on NBI, 7-11 November 2003 Valeri Falaleev(CERN) & Yuri Sviridov (IHEP, Protvino) 11

Summary

The m ulti w ires cham bers w ere usefully used during m any years in vacuum and air for profile m easurem ents of intensive proton beam s.