US 12 City of Altoona Nate Ulness (WisDOT) Joshua Melby, P.E. (KL Engineering) Public Involvement Meeting Project 7080-00-05/75 Nottingham Way Intersection Eau Claire County July 31, 2020
Project Overview
Purpose & Need NOTTINGHAM WAY – LOOKING EAST • Nottingham Way Intersection Non-signalized No pedestrian crossing accommodations Crashes NOTTINGHAM WAY – LOOKING WEST • Property damage • Fatal pedestrian crash in December 2017
Purpose & Need
Proposed Improvements Shared-use Path 8 feet wide 3 inches of asphalt over 8 inches of 1 ¼-inch base Windsor Forest Drive to North Hillcrest Parkway
Proposed Improvements US 12/County A Intersection N
Proposed Improvements Signals N
Construction Staging /Traffic Impacts N • Shoulder Closures • Temporary Lane Closures Westbound Left- and Right- N Turn Lanes
Project Schedule • Environmental Document (Signed May 2020) • Preliminary Design (May 2020) • 90% Plans (August 2020) • Final Plans (November 2020) • Construction (2021) May – September
Information & Website https://wisconsindot.gov/Pages/projects/by-region/nw/us12altoona/default.aspx
Comments & Feedback Please complete and return by Aug. 20 th .
Contact Information Nate Ulness WisDOT Project Manager (715) 836-3914 nathan.ulness@dot.wi.gov Aaron Steger, P.E. Joshua Melby, P.E. Consultant Project Manager Consultant Project Engineer (608) 663-1218 (608) 663-1218 asteger@klengineering.com jmelby@klengineering.com