Caltrain EMU Update Citizens Advisory Committee May 20, 2020 Agenda Item #8
Caltrain is procuring 19, 7-Car Trainsets 2
Emergency Exits 9
Vehicle Features and Passenger Amenities
Amenities and Features Passenger emergency intercom • Emergency brake lever • • Emergency exit windows – both levels Automatic passenger counter • Accessible toilet (“C” Car) • • Bike storage in bike cars Passenger Information Display (Destinations) • • Passenger Brochures Public Announcement System • Under-seat electrical outlets • • Interior LED lighting and temperature control Passenger WiFi provisions • 12
Accessible Toilet 13
Bike Car 14
Bike Car 15
Passenger Information Display (PIS) and CCTV Camera CCTV PIS 16
Passenger Information Display and Brochures 17
Emergency Exit Window – Upper Level 18
Emergency Brake Lever 19
Passenger Emergency Intercom 20
Underseat Charging Outlets 21
Add slide of Console Layout Drawing 22
23
24
25
Automatic Passenger Counter 26
Interior LED Lighting and Temperature 27
Production Activities
Car Shells in Switzerland Ready for Painting 29
Painted Car Shell in Switzerland 30
Car Shell Painted Interior 31
Car Shell Arriving In Salt Lake City 32
Cars Being Moved in Salt Lake City Facility 33
Trainset No. 1 in Salt Lake City Undergoing Testing 34
Trucks (bogies) Assembled in Salt Lake City Ready for Installation Under a Car 35
Upper Level 36
Cab Console Under Construction in Salt Lake City 37
Front Destination Sign 38
Side Destination Sign 39
Destination Announcements 40
Schedule - Trainset No. 1 Assembly Nearing Completion and Being Prepared for Testing in Salt Lake City - Trainset No. 2 – 4 in various stages of completion in Salt Lake City - Trainset No. 1 to commence testing in Railcar Testing facility in Pueblo, Colorado – Fall of ‘2020. Testing Duration 7 months - First Trainset to be delivered to Caltrain – Spring of ‘2021. 41
Questions? 42