ttwg studies update
play

TTWG Studies Update September 11, 2019 TTWG Studies Study - PowerPoint PPT Presentation

TTWG Studies Update September 11, 2019 TTWG Studies Study Description Stage / Next steps P1 System Planning Overview of costs, drivers and Report sent on September 10 th transmission planning in Alberta Includes past and


  1. TTWG Studies Update September 11, 2019

  2. TTWG Studies Study Description Stage / Next steps • P1 – System Planning Overview of costs, drivers and Report sent on September 10 th transmission planning in Alberta • Includes past and future system project TTWG costs • F1 – Tariff Design Historical ISO tariff design overview Navigant selected • Overview Other industry pricing and tariffs Kicking off this review week • Jurisdictional review including functionalization, classification, allocation and opportunity services review. • F2 – Line Correlation Correlation analysis of line power flow Data compiled. Analsyis versus system load and regional load Analysis in • First Stage: 240kV or greater lines or progress line segments 2

  3. TTWG Studies (cont’d) Study Description Stage / next steps • A1 – Historical and Hourly historical and forecast load, Data posted on Forecast Load, historical generation by market AESO website on Historical Generation participant category, type and region September 11th • C1 – Classification – Cost classification can be achieved Deferred Average & Excess through analyzing line loading and TTWG offer to determining average and excess line lead? loading to create fixed, volumetric and variable classifications • C2 – Classification – Cost classification can be achieved Deferred Minimum System through analyzing minimum system TTWG offer to and optimum system to create fixed, lead? volumetric and variable classifications • C3 – Classification – Cost classification can be achieved Deferred Fixed and Variable through analyzing fixed and variable TTWG offer to costs to create fixed, volumetric and lead? variable classifications 3

  4. TTWG Studies (cont’d) Study Description Stage / next steps • R1 – Value of Service Review the value of electricity service Engage external to customers and their potential consultant responses • A2 – Rate Classes Alberta legislative and regulatory In progress review of barriers and hurdles for new rates or rate classes • R3 – Bonbright Review Bonbright’s criteria of rate design and Review complete and Report applicability to the transmission tariff Next steps? • R4 – Historical Review past market participant In progress Coincident Peak response to monthly coincident peak Response pricing signal – monthly MWs and monthly dollars. 4

  5. Next steps – September and October • Finalize identified studies and circulate to TTWG for discussion and next steps • TTWG homework • Meeting schedule options 5

  6. Thank you

Recommend


More recommend