theos data transfer via tein3 u d update report
play

THEOS DATA TRANSFER VIA TEIN3 : U d Update Report & - PowerPoint PPT Presentation

THEOS DATA TRANSFER VIA TEIN3 : U d Update Report & Implementation Plan R & I l i Pl Damrongrit Niammuad d.niammuad@eoc.gistda.or.th @ g THEOS Satellite Operation Center, GISTDA Outlines Outlines Background Background


  1. THEOS DATA TRANSFER VIA TEIN3 : U d Update Report & Implementation Plan R & I l i Pl Damrongrit Niammuad d.niammuad@eoc.gistda.or.th @ g THEOS Satellite Operation Center, GISTDA

  2. Outlines Outlines � Background � Background •THEOS Polar Station • Network Topology � Update Report • Open Loop Test Result � Implementation Plan � I l t ti Pl • Network Connection Plan • Close Loop Test Plan • Close Loop Test Plan 31 th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong 2

  3. Background Background � MOU between GISTDA and DANTE (June,2009) � THEOS presentation & cooperation planning (July,2009) (28 th APAN Meeting, Malaysia) ( g y ) � Domestic Network Design & Planning with UniNet (2009) � MOU between GISTTDA and UniNet (March 2010) ( ) � THEOS 1 st Year Operation session in 30 th APAN meeting & Test Planning (August, 2010) � Open Loop Test (short distance): Thailand – Malaysia (October,2010) � Open Loop Test (Long Distance): Thailand – USA (December,2010)

  4. THEOS Polar station THEOS Polar station Image Telemetry THEOS Raw Data Storage X-Band PolarStation (Kiruna) S-Band Station X-Band Station (Bangkok) (SiRacha) (SiRacha) 20 Mbps Production Programming 155 Mbps Quick Delivery Central Archiving 155 Mbps Catalogue Server Service Media/FTP Ordering/Quotation Order Tracking Order Tracking Product Delivery Consultation Invoice/Billing DANTE: Request TEIN3/GEANT2 TEIN3/GEANT2 User International User (R&D/Universities) 31 th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong 4

  5. Polar Station Data Transfer Polar Station Data Transfer Acquisition in Sweden � All Data are transferred for � All Data are transferred for further processing in Thailand. � The polar station is connected � The polar station is connected with SUNET. Network � GISTDA’s station is connected � GISTDA’s station is connected with UniNet. � The data volume is around 690 Replay Production MB to 30 GB image data per one in Thailand in Thailand orbits (~ 2 orbits/day) 31 th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong

  6. THEOS Standard Products: Level 1A: provide 2 meter resolution and 8 bits information depth. Level 2A : provide 15 meter resolution and 8 bits information depth. All 4 bands are delivered as one file (red, green blue, near IR). All 4 bands are delivered as one file (red, green blue, near IR). PAN sharpening: The fusion of image PAN &MS PAN Level 1A PAN Level 2A PAN sharpening 31 th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong

  7. Network Topology: Overall Network Topology: Overall Thai Thai SSC ThaiSarn REN SSC Network Kiruna *Kiruna-Stockholm *Own Investment *Own Investment UniNet SUNET TEIN3 GISTDA NORDUnet Geant2 7 31 th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong

  8. Existing Connection from TEIN 3 g 31 th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong

  9. Update Report Update Report � Open Loop Test: Short Distance p p Bangkok (UniNet) - Kuala Lumpur (Universiti Putra Malaysia) o No connection from GISTDA to UniNet available o Tested files (THEOS images) was uploaded via internet ( g ) p connection o 3 Image files (199 MB, 189 MB, 748MB) = 1.5 GB o Using TEIN3 Route with UniNet server o Topology: ThaiREN Node – TEIN3 – Singapore Node

  10. Update Report Update Report � Open Loop Test Report p p p Bangkok (UniNet) - Kuala Lumpur (Universiti Putra Malaysia) o Destination via TEIN3: server groupbox.upm.my / ip:202.28.194.8 g p p y / p o Time: 13.00 -14.00 Local Time o Bandwidth: 20 Mbps p o Upload Time for 1.5 GB data: 4.52 min (748 MB data using 2-3 min)

  11. Update Report Update Report � Open Loop Test Report B Bangkok (UniNet) - Kuala Lumpur (Universiti Putra Malaysia) k k K l L At At uploading period l di i d to MY server

  12. Implementation Plan: Implementation Plan: THEOS Data Transfer � Thailand Shortest distance of each site connection � Ladkrabang to KMITL (King Mongkut Institute of Technology Ladkrabang) � Siracha to KU_SRC campus (Kasetsart university Siracha campus) (Kasetsart university Siracha campus) � Changwattana t o KU (Kasetsart University main campus) � Sweden � N R � No Research and Education Network h d Ed ti N t k from Kiruna Station to the Universities in Kiruna � Solution: Contract 20 Mbps SSC Network to SSC Data Center, Stockholm SSC Data Center to SUNET

  13. GISTDA Communication Center Ministry of Interior Changwattana Changwattana Development Affair Division p 1 1G 1G Ministry of Defence 1G 1G 1 G THAILAND phase1 MONITORING CAT ThaiSarn 1 G KU CENTER (NECTEC) (NECTEC) MOST MOST MetroLAN MetroLAN G 1 Internet2 8 M Ladkrabang Project Information 1 G phase1 Technology Network APAN 1G 1G Co Connection for ect o o KMITL Education 10G 6 Uninet RENX RENX 2 2 phase1 M TEIN3 GEANT2 2.5G Sriracha BU 1G Phase 2 KU SRC Phase 1: Peer-to-Peer Fiber Optic 20 Mbps Phase 1: Fiber Optic Connection leased from CAT Telecom leased from CAT Telecom invested by GISTDS ready to be used by Mid of 2011 ready to be used by Mid of 2011 Phase 2: Fiber Optic Connection invested by GISTDS ready to be used by End of 2011 ready to be used by End of 2011

  14. Implementation Plan: Implementation Plan: � Data Acquisition Service Contract Discussion between GISTDA & SSC: signed by Feb. 2011 g y � Sweden Node Testing: March – April ,2011 In line with Network Installation Testing Procedure SSC Network to SSC Data Center, Stockholm SSC Network to SSC Data Center Stockholm SSC Data Center to SUNET Contact Person � Continental Node Testing: April – May,2011 i l d i il � Testing Procedure TEIN3 Contact Person Sweden :SUNET-GEANT2-TEIN3-UniNet:Thailand Network Availability � Thailand Node Testing: July ,2011

  15. THEOS I mage Processing Facility @ Ladkrabang : NIDA KU KMITL KMITNB KMITNB RU MU_SLY TU SWU CU MUA KMUTT

  16. THEOS Control Station Si Racha : THEOS Control Station Si-Racha :

Recommend