The The Moor oors at at Arne Arne Pr Project Stakeholder Liaison Group Meeting From a photo: Graham 12 September 2018 Hatherley
1 Introductions 10 mins St Stak akeholder eholder 2 The Moors at Arne Project Brief introduction to the 15 mins project Liaison Liaison 2 Terms of Reference 10 mins 3 Contracting Clarify role of the Group 10 mins Group Gr oup etc 4 Update on the Project and 1) Flooding 40 mins Feedback / discussion 2) Public Access 3) Construction traffic Agenda Agenda 4) Location of main embankment 5) Siltation 6 Future topics for discussion Group and project team to 10 mins suggest topics 7 Next steps in the Project 10 mins 8 Date of next meeting 9 Close
Project Team: Environment Agency Helen Morgan, In Intr troductio tions Neil Watson, Catherine Farrugia, Kevin House, Vanessa Dare RSPB Dante Munns Natural England Ian Alexander
In Intr troductio tion to to the the Pr Project Neil Watson
SM SMP & Str Strategy gy • Shoreline Management Plan (Policy 2012) • Poole & Wareham Strategy (2015) • Poole Harbour Habitat Creation Review
SM SMP & Str Strategy gy • Shoreline Management Plan (Policy) • Poole & Wareham Strategy (Detail) • Poole Harbour Projects
SM SMP & Str Strategy gy • Shoreline Management Plan (Policy) • Poole & Wareham Strategy (Detail) • Poole Harbour Projects The Strategy approach is Managed Realignment / Minimum Maintenance
Habitat Creation Requirements
Habitat Creation Requirements
Habitat Creation Requirements
Habi Habitat Cr Crea eation tion Obj Objectiv ctives es • Working with Natural Processes • Developing a mosaic of Intertidal habitats across the site including: Saltmash Mudflat Saline Lagoons Protecting rare and irreplaceable habitats in situ – Cladium Fen •
The The Moor oors at at Arne Arne Pr Project
The The Moor oors at at Arne Arne Pr Project Site Area: Red = RSPB Blue = Natural England Yellow = Arne Road
The The Moor oors at at Arne Arne Pr Project
The Moors at Arne V i e w
Short Short Lis Listed ed Opti Options ons (1a) (1a) – L – Lagoons in in the the We West
Short Short Lis Listed ed Opti Options ons (1b) (1b) – L – Lagoons in in the the Ea East
Short Short Lis List Opti Options ons (1c) (1c) – E – Eastern Br Breaches eaches
Engagement with public and stakeholders
Project Appraisal Investigations • Fluvial • Tidal • Groundwater • Surface Water • Ground Investigations
Hydrological Modelling • Method • Catchments • Ridge inputs • Stream water storage on the Moors • Impact of proposed embankment and outfall structure
Inter ‐ tidal modelling • Flows • Salinity • Sediment movement • Interaction with R. Frome
Ridge & Arne Moors Groundwater • Responding • Monitoring • Interpretation
Ridge Surface Drainage Investigations • Responding to concerns • Survey and results shared • Impact on project understood • Liaison with Parish Council
Ground Investigations/ material suitability • Factual description of survey • Key findings • Settlement & Maintenance • Mixing on site • Importation
Project timeline • Consultation results
Te Terms of of Re Reference
• Clarify role of the Group Con Contracti acting • Behaviours
1. Flooding Upda Updates 2. Public Access 3. Construction Traffic 4. Location of main embankment 5. Siltation
Upda Update: • Tidal Fl Floodi ooding ng • Surface water • Ground water
• Surface water • Ground water • Tidal
• Surface water • Ground water • Tidal
Vi Visit sitor Access Access Pr Principles: • Dante • We do not want access to have a negative impact on wildlife • We do want to provide access that will be beneficial to people, especially within local communities RSPB Arne will be the main focus of access • We are not proposing any significant • infrastructure at Arne Moors Enable ‘non ‐ car’ access if possible • Limit access to permitted trails and viewing • points
Upda Update: • Excavate material from the site as much Cons Constructi truction on as possible Tr Traffic • Reduce size and length of embankments as much as possible • Longer, lower embankments – allows use of a wider variety of materials
Upda Update: Loc Location tion of of • Location of lagoons Ma Main em embankm bankmen ent
Em Emer erging ging opti option on
Upda Update: Silt Siltatio tion in in Ri River er Fr From ome • Analysis of historic surveys and and Upper Upper • Results expected later this year Wa Wareham Channel Channel • Plan to survey area before works start to establish the baseline conditions
Futur Future to topics fo for discussion discussion
• Groundwater Meeting 25 September Ne Next St Step eps • Public Exhibition – November
Project Stages EA Internal Audit stages Long list options Strategic Outline Case Ne Next St Step eps Short list options We are here Preferred option Outline design Outline Business Case Detailed design Planning Application Construction Full Business Case drawings Construction
Project Stages Timeline Long list options November 2016 Ne Next St Step eps Short list options Summer 2017 We are here Preferred option Outline design Spring 2019 Planning Application Detailed design Winter 2019/20 Construction Early Spring 2020 drawings Spring 2020 – Construction Autumn 2021
Ne Next Me Meet eting • 18 th October?
Thank you • TheMoorsAtArne@environment ‐ agency.gov.uk • https://www.dorsetcoast.com/groups/the ‐ moors ‐ at ‐ arne ‐ coastal ‐ change ‐ project/