Tahoe Talk Residential Permitting in the Tahoe Basin December 13, - PowerPoint PPT Presentation

Tahoe Talk Residential Permitting in the Tahoe Basin December 13, 2016 Introduction Placer County Staff Heather Beckman Planning Braden Johnston Front Counter Kirk Smith Building Ed Staniforth Engineering & Surveying


  1. “Tahoe Talk” Residential Permitting in the Tahoe Basin December 13, 2016

  2. Introduction Placer County Staff Heather Beckman – Planning Braden Johnston – Front Counter Kirk Smith – Building Ed Staniforth – Engineering & Surveying TRPA Staff Tiffany Good – Current Planning Jennifer Self – Current Planning

  3. Placer County & TRPA Permitting 101  What Can I build?  Designing your Project  Submitting your Application  Getting your Permit  Inspections  Final Sign Off!!!

  4. Meeting Format 1. TRPA Presentation – 10 mins 2. Placer County Presentation – 20 mins 3. Question and Answer – 1 hour

  5. 2 states: CA, NV (183 state legislators) 5 counties/ 1 city (30 locally elected officials) Federal Government

  6. Bi-State Compact • Two states with approval of Congress and the Pres., created TRPA in 1969 • Amended in 1980 requiring environmental threshold standards and a regional plan • 15-member board. (7 CA, 7 NV, 1 presidential) • Code of Ordinances lays out rules and laws to achieve Regional Plan goals

  7. Regional Plan/Area Plan • Overarching regulatory framework • Helps to establish balance between natural and human-made environments • Jurisdictional MOUs • Updated on 12.12.12 • Emphasis: – Relocating development – Creating town centers

  8. Placer County - CDRA Building Department • Plan Check (structural, plumbing, electrical) • Building & TRPA Inspections Engineering & Surveying • Grading permits • Encroachment permits • BMP review Planning • Zoning, setbacks, coverage, height • TRPA review

  9. Working Together Placer/TRPA MOU*  Residential – Single • new construction, addition  Multi Family – up to 4 units • new construction, addition  Qualified Exempt (QE) Activities  Site Assessments • Land Capability • Coverage * No Lake Front permitting * No Commercial permitting

  10. What is Coverage? And Why do I care? Any Impervious Surface • house • deck • driveway • dirt parking Legal/Verifiable Coverage • Prior to 1972 • Permitted Lake Clarity • Infiltrate all runoff onsite • Prevent sediment in runoff

  11. What is Land Capability? Coverage % Coverage Capability Exemption Bailey / IPES Low No Class 1 / < 726 1% Class 2 / < 726 1% Low No Class 3 / < 726 5% Low No Class 4 / >726 20% High Yes Class 5 / >726 25% High Yes Class 6 / >726 30% High Yes Class 7 / >726 30% High Yes

  12. How do I know what my coverage is? 1. Previous TRPA Permit? 1. Site Assessment – if no / old permit • If no permit  Site Assessment • Application/fee ($1102) • Site plan required • 2-2.5 months to process (assumes no snow)

  13. Can I get more coverage? 1. Grandfathered Coverage 2. Coverage Transfers 3. Coverage Exemptions – 10% extra a. High Capability Land b. Install BMPs c. Excess Coverage Mitigation fee

  14. Do I need a permit? Placer Building Project Type Permit OTC Eligible No Coverage Change – TRPA Exempt Reroof, siding, windows Yes Yes Landscaping/grading <3cy No Yes/NA Interior remodel Yes Yes Fence Yes/No Yes No Coverage Change – TRPA QE Replace deck, stairs, entry Yes Yes Garage over driveway Yes Yes Landscaping/grading 3-7 cy No Yes/NA Coverage Change – TRPA Project “Full Permit” Deck expansion/reconfigure Yes No Living space addition Yes No Driveway expansion No/Yes NO • No Lake Front/Shorezone • No Commercial

  15. I want to build a…… • TRPA Site Assessment and/or TRPA Permit Research • No TRPA records  submit Site Assessment to Placer County • Ask CDRA! Design • Contact Outside Agencies (Water, Sewer, Fire) • Placer Building – Checklist • TRPA – checklist and Findings Application • Possible grading and/or encroachment

  16. • Concurrent Placer/TRPA review • Placer & TRPA permits issued together Permit Review • Simultaneous TRPA and Placer inspections Inspections Enjoy!

  17. When do I start planning? Site Assessment needed? • Site plan : 1-2 months (surveyor, designer) • SA processed: 2 to 2.5 months (no snow) Design your project: 2 to 6 months???? Building/TRPA permit review: 2 months Timeline: • 7 months to 1 year (SA needed) • 4 to 8 months (no SA needed) • Design and permit over winter! Grading Season: May1 st – October15th No Soil Disturbance / Yes Construction

  18. Bonus Features  Placer County / TRPA MOU  one stop shopping Site Assessments • Concurrent TRPA & Placer Building Permit • Review Placer and TRPA Inspections •  Over-the-Counter Tuesdays (OTC) TRPA Exempt and some QE (e.g. deck • rebuild) Interior Remodel/Repair •  Tahoe Basin Area Plan Secondary residential units on parcels <1 • acre deed restricted affordable housing • no tourist or vacation rental • Greater residential opportunities • commercial districts

  19. Question & Answer See Handouts! Websites – all your FAQs can be found here: http://placer.ca.gov/departments/communitydevelopment www.trpa.org

  20. Welcome Mat Initiative Coordinated, predictable, and streamlined permitting for the Lake Tahoe Basin.

  21. 100+ Potential Projects Identified