srts i mplementation n on i nfrastructure p rograms
play

SRTS I MPLEMENTATION & N ON -I NFRASTRUCTURE P ROGRAMS M A R C H - PowerPoint PPT Presentation

SRTS I MPLEMENTATION & N ON -I NFRASTRUCTURE P ROGRAMS M A R C H 2 4 , 2 0 1 4 AT P G R A N T WO R K S H O P L EA H S T E N D E R , L E E D A P, C N U - A WA L K SA N D I EG O ( C I R C U L AT E SA N D I EG O ) C OMPREHENSIVE P


  1. SRTS I MPLEMENTATION & N ON -I NFRASTRUCTURE P ROGRAMS M A R C H 2 4 , 2 0 1 4 AT P G R A N T WO R K S H O P L EA H S T E N D E R , L E E D A P, C N U - A WA L K SA N D I EG O ( C I R C U L AT E SA N D I EG O )

  2. C OMPREHENSIVE P ROGRAM = T HE 5 “E’ S ” 6 1. Education 2. Encouragement 3. Enforcement 4. Engineering 5. Evaluation 6. Empowerment

  3. E DUCATE W HO ?  Students  Parents  Community

  4. E DUCATE S TUDENTS  Morning  School Assemblies Announcements  Bike Rodeos  Walk This Way

  5. E DUCATE P ARENTS  Workshops Walkability Workshop  Walkability with San Ysidro Walks N Rolls Walk/Bike Audits to School Willow Elementary (Engineering)  SRTS Training (Encouragement, Enforcement)  Advocacy (Empowerment)

  6. E DUCATE N EIGHBORS /C OMMUNITY  Banners  Campaigns Chula Vista SRTS Project  Yard Signs Lakeside I Drive 25 mph Campaign Gets Moving Promotora Training 2011 Chula Vista SRTS CPPW Project, 2011

  7. E NCOURAGEMENT A CTIVITIES  Logo Contest La Mesa Kids Walk & Roll To School Project

  8. E NCOURAGEMENT A CTIVITIES  Naitonal Walk to School Day

  9. E NCOURAGEMENT A CTIVITIES  Weekly Walks  Walking School Buses or Bike Trains  Park & Walk Sites

  10. E NCOURAGE O LDER A DULTS !  Eyes on the Street (Castle Park Elementary CV)  Ojos en la Calle  Older Adult Volunteer Training (LM SRTS)

  11. E NCOURAGEMENT A CTIVITIES  Incentives Walk N Roll Bracelets Walkers and Bikers write their name!

  12. E NFORCEMENT  Mobile feedback trailers Police participation in workshops and other education events La Mesa Walk N Roll to School Rolando Elementary

  13. E NGINEERING  Infrastructure Improvement Plan

  14. E VALUATION Always done Pre- & Post-project  SRTS National Center  Mode Split Data  Student Tally  Active4Me  Parent Survey  Count!  Local Resources  SD SRTS Coalition created supplements to parent survey  Additional student surveys  Focus groups

  15. 5 E’s have a role beyond program activities

  16. B RIDGING THE G AP B ETWEEN NI & I  Case Study: Encinitas Cardiff Elementary

  17. B RIDGING THE G AP B ETWEEN NI & I  Community Initiated Process

  18. B RIDGING THE G AP B ETWEEN NI & I  Installed in Spring 2011

  19. B RIDGING THE G AP B ETWEEN NI & I  Community Education followed  Parent Workshops  Walk/Bike to School day Celebration

  20. Can SRTS be achieved in other ways? YES

  21. G OAL : SRTS  Community Based Transportation Plan  Imperial Beach SRTS Plan  Santee SRTS Plan  Encinitas Pedestrian Travel and SRTS Plan

  22. G OAL : A CTIVE T RANSPORTATION  Bike/Pedestrian Plan (CV)  Safe Routes to Transit (LM)  Comprehensive Active Transportation Strategy (Vista/SB)  Urban Trails Mobility Plan (LM)

  23. Questions? LEAH STENDER WALKSANDIEGO (CIRCULATE SAN DIEGO) 619.544.9255 LSTENDER@WALKSANDIEGO.ORG

Recommend


More recommend