Space Coast Transportation Planning Organization 2016 Transportation Project Priorities Investing your dollars in Transportation Where do Projects Come From? State of the System analysis / Traffic Counts Citizen Input / Public


  1. Space Coast Transportation Planning Organization 2016 Transportation Project Priorities Investing your dollars in Transportation

  2. Where do Projects Come From? • State of the System analysis / Traffic Counts • Citizen Input / Public Involvement • Local Governments / Transportation Agencies

  3. Project Priorities Projects are requested from County, local municipalities and transportation providers every spring Projects reviewed by TPO Committees and adopted by TPO Board Prioritized list is sent to Florida Department of Transportation (FDOT) for funding consideration The TPO only reviews projects eligible for state and federal funding . Locally funded projects are selected by County Commission or City Council.

  4. Strategic Intermodal System SIS: Florida’s high priority transportation facilities Transportation hubs – ports and terminals moving people and goods Interregional corridors – highways, rail lines, waterways, fixed transit, connecting major destinations Intermodal connectors – highways, rail lines, waterways, linking hubs and corridors SIS

  5. I-95 Six-Laning (Under Construction) $600 M investment for multiple phases of I-95 in Brevard County SIS

  6. St. Johns Heritage Parkway I-95 North Interchange (Fully Funded) Design underway $3.5 M Right of Way funded $11 M Construction funded $44 M (FY 2017) SIS

  7. Parkway South Interchange N of Micco Rd (Fully Funded) Design underway $1.3 M Right of Way donation Construction funded $35M (FY 2016) SIS

  8. I-95 / Viera Boulevard Interchange (Fully Funded) PD&E Study underway Design $2.1M (FY 2016) Construction $7.3M (FY 2017) SIS

  9. Ellis Road Widening John Rhodes Blvd to Wickham Road Design underway $2.4 M Right of Way funded $35 M FY 2020 – 2023 Construction unfunded SIS

  10. SR 528 (Beachline) Six-Laning PD&E Study Update Design $11.2 M (FY 2016) Construction (unfunded) SIS

  11. Regionally Significant Facilities (RS) Babcock Street (SR 507) Malabar Road (SR 514) Palm Bay Road US 192 Eau Gallie Blvd (SR 518) US 1 SR A1A NASA Blvd (SR 508) Wickham Road Pineda Causeway Barnes Blvd Fiske Blvd (SR 519) King Street (SR 520) Clearlake Rd (SR 501) N. Courtenay Pkwy Challenger Pkwy Cheney Hwy (SR 50) Garden St (SR 406) SR 46

  12. Federal Transportation Management Area (TMA) Funds (FDOT fund code: SU) TPO MANAGED FUNDS FY 2018 $5.6 Million FY 2019 $5.6 Million FY 2020 $5.5 Million TMA/SU

  13. Federal TMA Funds (SU) FY 2009 – FY 2017 $20,040,464 Capacity/widening projects $17,921,685 St. John’s Heritage Parkway $16,283,509 Complete Streets projects $11,393,572 Intersection improvements $8,676,494 Intelligent Transportation System $3,344,793 Planning studies TMA/SU

  14. St. Johns Heritage Parkway US 192 to Ellis Road Construction partially funded (FY 2017) RS - 1

  15. US 192 and Hollywood Blvd/ Evans Intersection Improvements Design $625 K (FY 2018) Right of Way $4.7 M (FY 2020) RS - 2

  16. US 192 and Wickham / Minton Intersection Improvements Design $700 K (FY 2018) Construction (unfunded) RS - 3

  17. SR A1A Multimodal Study Pineda to Port Canaveral Feasibility Study Complete RS - 4

  18. SR A1A Multimodal Study Pineda to Port Canaveral RS - 4

  19. Babcock (SR 507) Widening Malabar Rd to Palm Bay Rd Design Complete Right of Way $27.5 M (FY 2018 – 20) Construction (unfunded) RS - 5

  20. Malabar Rd (SR 514) Widening Babcock to US 1 PD&E Study Underway Design $3.5 M (FY 2019) Right of Way and Construction (unfunded) RS - 6

  21. Clearlake Rd (SR 501) Widening Industry to Michigan PD&E Study Underway Design $2.4 M (FY 2019) Right of Way and Construction (unfunded) RS - 7

  22. SR 524 Widening I-95 to Industry Road PD&E Study Unfunded RS - 8 NEW

  23. Washingtonia Extension PD&E Study $3.5 M (FY 2020) RS -9

  24. Malabar Road Parkway to Minton PD&E Study $1 M (FY 2020) RS - 10

  25. Babcock Street Palm Bay Parkway to Malabar Road PD&E Study $3 M (FY 2020) RS - 11

  26. Transportation System Management and Operations (TSM&O) ITS Master Plan ITS Operational Support RS

  27. Corridor Planning Studies UNDERWAY SR 3 (Courtenay Parkway) SR 406 (Garden Street) US 1 (Washington Ave) SR 518 (Eau Gallie) Beachside SR 519 Fiske Blvd SR 520 (EB/WB King St) NEW PROJECTS SR 5054 (Sarno Rd) – Wickham to US 1 Banana River Dr/Pinetree – Mathers Bridge to A1A

  28. Complete Streets CONSTRUCTION North Atlantic Ave/Cape Canaveral Minutemen Causeway/Cocoa Beach Peachtree Street/Cocoa DESIGN Hopkins Ave/Titusville Florida Ave/Cocoa Hickory Street/Melbourne FEASIBILITY Pineapple Ave/Melbourne Front St/Melbourne

  29. Regional Trails IN BREVARD Coast to Coast Connector St. Johns River to Sea Loop East Coast Greenway

  30. QUESTIONS ?