  2. A. . About About SAPP SAPP 2 2 SOUTHERN AFRICAN POWER POOL SOUTHERN AFRICAN POWER POOL

  3. 1. SAPP KEY FACTS  12 SADC Member Countries  280 Million people  Average Electricity demand growth rate 3.2% p.a. • DR Congo • Tanzania  Consumption 321 TWh • Angola • Malawi  Installed Capacity 59539 MW • Zambia • Zimbabwe  Available Capacity 52589 MW • Namibia • Botswana • Mozambique  Peak Demand 46748 MW • Swaziland • South Africa • Lesotho 3 3 SOUTHERN AFRICAN POWER POOL SOUTHERN AFRICAN POWER POOL

  4. 2. SAPP DEMAND SUPPLY SITUATION 4 4 SOUTHERN AFRICAN POWER POOL SOUTHERN AFRICAN POWER POOL

  5. 3. ELECTRICITY ACCESS Electricity Access in SADC, % 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 Electrification Access,% SADC Average Electricity Acess, %  36% SADC Region Average 5 5 SOUTHERN AFRICAN POWER POOL SOUTHERN AFRICAN POWER POOL

  6. 4. SAPP GRID DRC DRC ZAMBI BIA ZIMBAB BABWE VOLTAG TAGE E LEVE VELS LS (SNEL) EL) (ZES ESCO) O) (ZES ESA) A) 700 400 110 kV 500 * 132 kV 1589 2287 1381 220 kV 40 40 90 90 50 20 20 275 kV BOTSW SWANA ANA 550 15 1500 00 330 kV (BPC) NAMIBI BIA (Nam amPow Power) er) 610 RSA 400 kV MOZAM AMBI BIQUE (Eskom om) (EDM/HCB) B) 533 kV DC 243 43 629 171 71 830 1200 765 kV 554 1258 1200 NOTE: RSA 37661 There re are re radia ial l SWAZILAN AND (Eskom om) distri stributio tion feeders s (SEC) LESOTH SOTHO among both th 100 219 ope peratin ting g and nd non on- (LEC EC) opera ratin ting 84 84 members. s. These se RSA 150 are NOT regarde rded (Eskom om) as SAPP inte terco connecto ctors. rs. • 6 * Figu gures es dep epic ict t 200 0015 15 ‘N -1-co contin tinge gency cy- criterion’ power transfer capability limits in MW. • SOUTHERN AFRICAN POWER POOL

  7. 5. SAPP COMPETITIVE MARKET Summary of Revenues on the Market for Period April 2016 to January 2017 Total USD68,988,935 2,580,381 MWh was  matched only 865,545 MWh (34%) traded due to 17% transmission constraints 2% 5% 4% Market share in MWh   FPM-M 8%, DAM 74%, 72% FPM-W 11%, IDM 7% Average prices:   Off-peak: 3-6 USc/kWh Traded Amount [USD 49,995,451]  Standard: 4-10 USc/kWh Wheeling Revenues [USD 2,699,294] Losses Revenues [USD 3,120,100]  Peak: 10-14 USc/kWh Administration Revenues [USD 1,729,980] • 7 • SOUTHERN AFRICAN POWER POOL Congestion Income [USD 11,444,109]

  8. 6. SAPP TRANSMISSION PROJECTS 8 8 SOUTHERN AFRICAN POWER POOL SOUTHERN AFRICAN POWER POOL

  9. B. . SAPP and SAPP and Standar Standardisa disation tion 9 9 SOUTHERN AFRICAN POWER POOL SOUTHERN AFRICAN POWER POOL

  10. 1. TECH COMMITTEES OF INTEREST  TC8: System Aspects of Electricity Supply  TC 57: Power System Data Management  Working Groups of Interest:  TC8 WG2 – HV Transmission Systems (Designs, PMUs)  TC8 WG6 – Smartgrid Requirements  TC8 PT 62749 - Power quality aspects  TC8 PT 62786 - Distributed Energy Resources  TC8 SC8A - Interconnection of Large Renewable Energy Generation. 10 10 SOUTHERN AFRICAN POWER POOL SOUTHERN AFRICAN POWER POOL

  11. 2. IEC Standar Standards ds of of inte interest est No No. IEC IEC St Stand andar ard Sub Subject ject 1 IEC TR Guidelines for the design of 62511:2014 interconnected power systems 2 IEC/ IEEE PAS Interconnecting distributed 63547:2011 resources with electric power systems 3 IEC 60038:2009 IEC standard voltages 4 IEC TS 62749 Assessment of power quality - Characteristics of electricity supplied by public networks 5 IEC TR Standardising the characteristics 62510:2014 of electricity 6 IEC 60059:1999 IEC standard current ratings 11 11 SOUTHERN AFRICAN POWER POOL SOUTHERN AFRICAN POWER POOL

  12. 3. Power Qua er Quality in SAPP lity in SAPP 12 12 SOUTHERN AFRICAN POWER POOL SOUTHERN AFRICAN POWER POOL

  13. 4. About Grid Codes  Almost all SAPP member countries have own grid codes  Jurisdiction of Regulators  Interconnection requires harmonisation of some codes, as was done in EAPP  SAPP Operating Guidelines  Inferior to grid codes, revised in 2014  Has penalties for non-compliance  Includes requirements for connection of IPPs 13 13 SOUTHERN AFRICAN POWER POOL SOUTHERN AFRICAN POWER POOL

  14. 5. CONNECTION OF IPPs 14 14 SOUTHERN AFRICAN POWER POOL SOUTHERN AFRICAN POWER POOL

  15. 6. EXAMPLES OF DESIGN DIVERSITY 15 15 SOUTHERN AFRICAN POWER POOL SOUTHERN AFRICAN POWER POOL

  16. 7. Standar tandardisa disation tion, har , harmonisa monisation tion  Equipment specification and procurement  Competitive bids, impact on tariffs  Equipment performance  Failure affects energy interchange  Standardisation, speedy replacement  High voltage switching  Equipment identification  Quest for single African pool  SAPP connecting to EAPP in 2019 16 16 SOUTHERN AFRICAN POWER POOL SOUTHERN AFRICAN POWER POOL

  17. 8. SAPP System Viewer 17 17 SOUTHERN AFRICAN POWER POOL SOUTHERN AFRICAN POWER POOL