Sidewalk Scoping Study South Royalton Village Alternatives - PowerPoint PPT Presentation

Sidewalk Scoping Study South Royalton Village Alternatives MeetingSeptember 5, 2018 Project Overview 5 Minutes Review of Input 10 Minutes Overview of Alternatives 20 Minutes Minutes Open House 60 Minutes South Royalton


  1. Sidewalk Scoping Study South Royalton Village

  2. Alternatives Meeting–September 5, 2018 •Project Overview 5 Minutes •Review of Input 10 Minutes •Overview of Alternatives 20 Minutes Minutes •Open House 60 Minutes South Royalton Sidewalk Scoping Study

  3. Meeting Purpose •Receive Public Input on Village Sidewalk Alternatives South Royalton Sidewalk Scoping Study

  4. Sidewalk Scoping Team • Greenman-Pedersen, Inc. • Carolyn Radisch, Project Manager • Rebecca Brown, Project Engineer • Bob White, Landscape Architect • Town of Royalton • Rose Hemond, Town Administrator South Royalton Sidewalk Scoping Study

  5. Schedule Overview • May Project Kick-Off • June Local Concerns Meeting • May-July Existing Conditions Review • June – Aug Alternatives Development • September Alternatives Presentation • October Preferred Alternative, Cost Estimate • December Final Presentation, Final Report South Royalton Sidewalk Scoping Study

  6. What is a Scoping Study? •The study will develop conceptual plans and a cost estimate for sidewalk improvements in an open and collaborative process. •There are technical and process requirements. South Royalton Sidewalk Scoping Study

  7. Project Goals 01 02 03 04 Address ADA Identify issues Identify gaps in Recommend (Americans with with traffic flow the sidewalk priority segments Disabilities Act) along the network. for future issues. business block. construction. South Royalton Sidewalk Scoping Study

  8. Study Area Poor Sidew alk Conditions South Royalton Sidewalk Scoping Study

  9. Missing Sidew alk Links South Royalton Sidewalk Scoping Study

  10. Study Area ADA Compliance: Tow n ROW South Royalton Sidewalk Scoping Study

  11. Study Area ADA Compliance ADA Compliance: Tow n ROW South Royalton Sidewalk Scoping Study

  12. ADA Compliance: Curb Ramps South Royalton Sidewalk Scoping Study

  13. ADA Compliance Pedestrian Safety: Curb Extensions South Royalton Sidewalk Scoping Study

  14. Study Area ADA Access: Business Entries South Royalton Sidewalk Scoping Study

  15. Horse 85’ Trough Loading Zone Traffic Patterns, Parking and Pedestrian Safety South Royalton Sidewalk Scoping Study

  16. Streetscape Improvements South Royalton Sidewalk Scoping Study

  17. Public Comments • Poor Condition of Sidewalks – Safety Issues • Access to Chelsea Street Shops • Parking • Sidewalk Missing Links / Crosswalk Concerns / Signage • Truck Loading / Use of Back Alley • Horse Trough • Streetscape Improvements • Out of Scope Items – Will Hold on to Thoughts for Later South Royalton Sidewalk Scoping Study

  18. Conceptual Village Center Pedestrian Improvements South Royalton Sidewalk Scoping Study

  19. Conceptual Village Center Pedestrian Improvements: Detail Areas South Royalton Sidewalk Scoping Study

  20. Downtown Alternative 1: Repair and Replace Sidewalk South Royalton Sidewalk Scoping Study

  21. Downtown Alternative 1: Repair and Replace Sidewalk South Royalton Sidewalk Scoping Study

  22. Downtown Alternative 2: Building Access and Street Loading South Royalton Sidewalk Scoping Study

  23. Downtown Alternative 2: Building Access and Street Loading South Royalton Sidewalk Scoping Study

  24. Downtown Alternative 3: Building Access and Relocated Loading South Royalton Sidewalk Scoping Study

  25. Downtown Alternative 3: Building Access and Relocated Loading South Royalton Sidewalk Scoping Study

  26. Open House • Review Conceptual Plans • Vote for your Preferred Commercial Block Option • Provide Comments • Fill out Survey • Thank You! South Royalton Sidewalk Scoping Study