Beyond the current UF Boundaries
Self cleaning strainer + UF membrane cartridges in the same pressure vessel EPC PC ´ S END ND U USERS Decreases significantly Decreases significantly
WORKS W IT HOW HO 2 UF F WATE WA TER RAW W 1 WA WATE TER OUTSIDE-TO-INSIDE INSIDE-TO-OUTSIDE Johnson type strainer (150-300µm ) PRETREATED Filtration through membrane bundles WA WATE TER into chamber 3 Strainer is cleaned by internal brushes moved by a propeller Extractable false plate+ bundles + support grill
WORKS W IT HOW HO BOTH SYSTEMS ARE BACKWASHABLE AT THE SAME TIME OR SEPARATELY i-UF400 GRP Housing (DN400) Super Duplex strainer (150 µm) 21 cartridges 10m2 (Total surface 210 m2)
NTS NENT COMPONE CO MEMB ME MBRANES SSEL VESSE SCREEN EEN DOW ´ S HIGH PERMEABILITY XP FIBERS 50 DIFFERENT MATERIALS BACKWASHING & BRUSHING: MOST M2 (FRP/GRP – SS – CSRL) EFFECTIVE CLEANING REPLACEMENT SIMILAR TO CARTRIDGE UNLIMITED PRESSURE RATING NO MOTORS USED FOR CLEANING FILTERS BIG SIZES. UP TO Ø60” | MEETING XP FIBERS HAVE UP TO 35% MORE MARKET TRENDS PERMEABILITY THAN THE STANDARD
[i-UF] SAME WATER QUALITY ◊ LOWER POWER CONSUMPTION ◊ HIGUER RECOVERY ◊ ENHANCED CLEANING ◊
SWRO SWRO O PL PLANT NT SW TREATING RAW AW SEA EAWATER ON WATER R QU QUALITY & & PE PERFORMANCE *TMP = UF MEMBRANE + STRAINER. O NCE DP DUE TO INTERMEDIATE PIPING DOESN’T EXIST PERFORMANC Feed SDI 15 : 5.0 – 6.0 Permeate SDI 15 : < 2.0 NCING NHANC ENH 55 65 72 75 85 lmh lmh lmh lmh lmh
WWTP MUNICIP ICIPAL WAST STE WATER R REUSE SE TREATING SE SECO COND NDARY EFFL FFLUENT WATER R QU QUALITY ON FEED FEED PERME MEATE NCE PERFORMANC Parameter Feed Permeate Reduction ≥ 98.5% Max 13.2 < 0.2 (LoD) Turbidity (NTU) ≥ 96.4% Avg 5.5 < 0.2 (LoD) P NCING NG ≥ 99.9% TSS Max 6.8 0 (mg/l) ≥ 99.9% NHANC Avg 13.2 0 SAME DOW XP FIBERS COD Max 72.4 48.6 - ENH (mg/l) Avg 54.7 35.7 34.7% BOD Max 29.0 17.0 SAME WATER QUALITY TO (mg/l) Avg 19.3 11.7 39.3% CONVENTIONAL DOW UF Microbiology SYSTEM ≥ 97.7% Max 44 < 1 (LoD) (u/100ml)
WWTP MUNICIP ICIPAL WAST STE WATER R REUSE SE TREATING SE SECO COND NDARY EFFL FFLUENT OPERATI TING PARA RAMETERS RS ON NCE PERFORMANC P RECOVE VERY RY IS FOR OR SCF F + U UF. . NCING NG SCF F IS CLEANE NED USIN ING UF UF B BW # #2. 2. NHANC MINI-CI MI CIPS OR ENH HIGH HI H ENERGY CLEANINGS GS ENHA HANCIN ING PERMEABIL ILIT ITY RECOVE VERY RY
WWTP ENHANCING CLEANING EFFICI ICIENCY CY ON HIGH GH ENERY CLEANI NING NGS NCE PERFORMANC COMPRESSED V ENT NT V ENT NT AIR (~5 BAR) EXPANSION A IR IR / WATER INTERPHASE W ATER W ATER P M AX . . T URBULENCE LEVEL LEVEL NG NCING A IR IN IN NHANC IR A IR IN IN IR HIGH TURBULENCE ENH CLEANING IN INTERPHASE R INS IN IN NSE AREA R INS IN IN NSE D RA IN RAIN D RA IN RAIN
[i-UF] LOCATION & FOOTPRINT ◊ MEMBRANE REPLACEMENT ◊ NON-RESTRICTED OPERATING PRESSURE ◊
FOOTPRINT LOCA OCATI TION ON OUTDOORS RS I INSTALL LLATION ON & UNLIKE PVC, PE OR PP HOUSINGS, I-UF MEV CAN BE INSTALLED OUTDOORS. CATION FLUYTEC HAS REFERENCES OF +20 YEARS IN HARSH OUTDOOR INSTALLATION LOCA L NARIOS: SCENA SCE NEW NE
FOOTPRINT LOCA OCATI TION ON CO COMPACT CTNE NESS & CATION NO INTERCONNECTING ALL AREA IS AVAILABLE COMPARED TO THE MOST LOCA PIPEWORK OR SUPPORT FOR MEMBRANE COMPACT SKIDS IN THE MARKET L FOR MODULES CONTAINMENT ( 4 ROWS OF MODULES W/DIRECT COUPLING), NARIOS: SCENA Model nº modules Filtering Net Footprint Gross Footprint Compacity SCE area (m2) (m2) (m2) (Filt. Area/ gross Ftp) Compact skid 1 24 1.848 3,56 8,42 219,5 NEW Compact skid 2 40 3.200 4,69 10,42 307,2 NE i-UF 60 60 3.000 2,69 5,49 546,1
DES LOCA OCATI TION ON GRADE NEW W SCE SCENA NARIO UPGR PLANT NT UPGRA RADES U NT PLANT P NARIO: SCENA SCE NEW NE UPGRADE PROJECT TO SUBSTITUTE SAND FILTRATION BY UF (86,4 MLD).
DES LOCA OCATI TION ON GRADE NEW W SCE SCENA NARIO UPGR PLANT NT UPGRA RADES U NT PLANT P NARIO: SCENA SCE NEW NE ORIGINAL PLAN: 2 STORE BUILDING WITH CONVENTIONAL UF TOTAL FOOTPRINT PLANED = 738 M2
DES LOCA OCATI TION ON GRADE NEW W SCE SCENA NARIO UPGR PLANT NT UPGRA RADES U NT PLANT P I-UF OPTION AVOIDS CONSTRUCTION OF BUILDING NARIO: MINOR MODIFICATION OF PLANT LAYOUT SCENA SCE NEW NE
NT ME MEMB MBRANE REPLACEME R MENT REPLACEMENT NEW W SCE SCENA NARIO FOR O OPERATORS ORS ALTERN RNATIVES MEMBRANE M NARIO: SCENA SCE I-UF OFFERS AN OPEN FIXING OF MODULES MODULES NEW NE AREA FOR MEMBRANE OBTAINED BY CONNECTORS TO (SIZE, MATERIAL, UPGRADES…) CAN BE REPLACED BY CONTAINMENT UPPER TUBESHEET. CHANGING THE ADAPTORS OR THE TUBESHEET
SURE NON ON-RESTRICTED P PRESSURE PRESSU NEW APP PPLICATIONS FO FOR UF UF P STRICTED PVC / PP /PE MODULES MAXIMUM PRESSURE NON-REST LIMITED TO 5-6 BAR, DEPENDING ON OPERATING TEMPERATURE & SENSIBLE TO WATER-HAMMERS. NO I-UF VESSELS ARE PRESSURE VESSELS, DESIGNED AS PER INTERNATIONAL CODES NARIO: (I.E. ASME). SCENA SCE BASED ON MATERIAL SELECTION, THE PRESSURE RATING OF THE VESSEL IS NON-RESTRICTED . NEW NE