Massachusetts Water Resources Authority Section 4 - Webster Avenue Pipe and Utility Bridge Replacement April 13, 2016 Northern Low Service System WEBSTER AVENUE WATER PIPE & UTILITY BRIDGE New 48-inch Pipe And Utility Bridge Pipe On Bridge


  1. Massachusetts Water Resources Authority Section 4 - Webster Avenue Pipe and Utility Bridge Replacement April 13, 2016

  2. Northern Low Service System WEBSTER AVENUE WATER PIPE & UTILITY BRIDGE

  3. New 48-inch Pipe And Utility Bridge

  4. Pipe On Bridge Crossing MBTA Commuter Rail Tracks

  5. Vertical Mechanical Joint Bends With Megalug Restraints

  6. HP LOK Pipe by U.S. Pipe

  7. Bent HP LOK Ring From Pressure Test 1

  8. Bent HP LOK Ring After Dissassembly

  9. HP LOK Joint Components

  10. Redesign Drawing