H.W.Mountz Elementary School Board of Education Ad Hoc Beautification Committee May 22, 2017
Ad Hoc Beautification Committee Members Parent: Rick Roccesano Shade Tree Committee: Syd Whalley PTA/SLED: Kiernan Difeo BOE: Christine Valori Neighbor: Elsie Dubac BOE: Alan Ferraro Neighbor: Ann Gale Admin: Ray Boccuti SL Downtown BID: Rich Clayton Admin: Nick Mackres/Nick Puleio Garden Club: Christina Galvin Boro Council: Bob Drasheff Resident: Dana Denton (photographer)
Goal of Committee Develop a comprehensive plan for the improvement of the exterior grounds of Mountz School which will be presented to the Board of Education for review for determination of priorities and costs, and for identification of financial support.
Process (1) Mountz Strategic Plan (Dec 2016) Buildings and Grounds Sub-Committee Ad Hoc Beautification Committee
Process (2) Ad Hoc Beautification Committee Committee Established with Stakeholders Planning Sub-Committee met w/School Administration Members Toured Exterior Grounds, Local Schools Full Committee Met to Establish Consensus on Focus Areas Co-Chairs/Admin Obtained Cost Estimates for Each Focus Area Full Committee Reconvened to Review Costs and to Set Priorities Present Report to Board of Education
Grounds Assessment: Plans in Progress by School Administration Sidewalks /Curbs Driveways Other Hardscape Irrigation Lighting Signage Seating Storage
Grounds Assessment: Focus Areas for Ad Hoc Committee Perimeter Fence Sports Fields (including backstops and players’ benches Curbs and Sidewalks Landscaping
PERIMETER FENCES - Considerations Color – Black Vinyl Height – Five Foot Flexibility Durability Gates (TBD) Costs - $16,000
Sea Girt Fence
Backstops - Considerations Color – Black Vinyl Size – As Existing (Code) Both Softball and Baseball Fields Costs - $16,400
Sea Girt Backstop
Player Benches - Considerations Color – Black Vinyl Size – Extend Protective Fence Down Base Line Concrete Pad under Bench Chain Link “Overhead” (like Marucci; not solid) Costs - $12,000
Sea Girt “Dugout”
PLAYING FIELDS - Maintenance Spring and Fall Aeration and Seeding Regular Fertilizing and Weed Control Minor Top Soil Repair Estimated Costs: $5,000 - 10,000/ year
CURBS & SIDEWALKS- Considerations Many Areas in Need of Repair/Replace Safety and Liability Concerns Storm Water Management Issues Partner with the Boro Street Improvements to Reduce Costs Estimated Costs: $40,000
LANDSCAPING – Considerations Majority of Landscaping Planted in 1996 Many Plants/Trees Deteriorating or Oversized Estimated Cost: $33,000 MAINTENANCE must be included (budget about $5,000 per year) Can be done in phases, although not desirable
LANDSCAPING – Recent Improvements (2017) DPW Planting of 6 Right-of-Way Trees Garden Club Planting of 3 Maples in Front Garden Club Planting of Hostas in Front National Junior Honor Society – Zan’s Garden New School Sign to be Installed Soon
Mountz Entrance
Sea Girt School Entrance
Sea Girt Wallscape
OTHER RECOMMENDATIONS Street Signage (Parking Limits; Handicapped) Dog Care (Replace Sign Posts; Stock Bags) Storage Bins on Fields (Placement) Seasonal Clean-Up of Equipment on Fields Recycle Bins Outside Drinking Fountain Outside
THANK YOU !!!
Recommend
More recommend