road list
play

ROAD LIST In the fa fall, , we prese sent nted d a list st of - PowerPoint PPT Presentation

ROAD LIST In the fa fall, , we prese sent nted d a list st of roads ds planne ned d for resur urfaci cing ng in FY2015. 5. The tot otal al number er of miles s for the plan wa was 82.2. 2. JEF EFFE FERS RSON ON COUNT


  1. ROAD LIST In the fa fall, , we prese sent nted d a list st of roads ds planne ned d for resur urfaci cing ng in FY2015. 5. The tot otal al number er of miles s for the plan wa was 82.2. 2.

  2. JEF EFFE FERS RSON ON COUNT UNTY OVER ERVI VIEW JEFFERSON 5 3 COUNTY IS SUBDIVIDED INTO SIX 1 2 SUPERVISOR DISTRICTS. THE END EACH SUPERVISOR’S DISTRICT SHOWN 4 6 IN MAGENTA COLOR TEXT.

  3. MAINTENANCE DISTRICT 1 Deerfoot Parkway Goodner Mountain Road Dewey Heights Road Clay Palmerdale Road CLAY Tyler Loop Road TRUSSVILLE INDEX : COUNTY FORCE ROADS CONTRACTED ROADS

  4. MAINTENANCE LIBERTY PARK DISTRICT 1 SPORTS COMPLEX (THE COTSWOLDS) INDEX CONTRACTED ROADS LAKE PURDY

  5. MAINTENANCE DISTRICT 1 (CAHABA RIVER ROAD) INDEX : COUNTY FORCE ROADS CONTRACTED ROADS

  6. MAINTENANCE DISTRICT 2 (FLAT TOP ROAD) *Within the City of GRAYSVILLE CARDIFF Graysville INDIX : COUNTY PAVED ROADS CONTRACTED ROADS

  7. MAINTENANCE DISTRICT 2 (MINOR PARKWAY) BROOKSIDE *Within the City of Adamsville INDEX : COUNTY PAVED ROADS CONTRACTED ROADS ADAMSVILLE

  8. MAINTENANCE DISTRICT 2 ADAMSVILLE (MULGA LOOP) MULGA INDEX : COUNTY PAVED ROADS CONTRACTED ROADS

  9. MAINTENANCE DISTRICT 2 Crossbow Drive Carriage Drive Greenleaf Drive Greenleaf Circle Iroquois Drive Iroquois Circle Lancelot Drive ADAMSVILLE Lodengreen Drive Merrywood Drive Miami Drive Mohave Drive Robinhood Road Shoshone Drive W. Carriage Drive W. Greenleaf Drive INDEX : COUNTY PAVED ROADS CONTRACTED ROADS

  10. MAINTENANCE DISTRICT 3 KIMBERLY Happy Top Road Jackson Road and Various “Tar and Gravel” Treated Roadways GARDENDALE PINSON INDEX : COUNTY PAVED ROADS CONTRACTED ROADS

  11. MAINTENANCE DISTRICT 4 Lock 17 Road (partial) Patton Ferry Road Dunn’s Camp Road Yellow Creek Camp Road Kirtley Drive Redstone Road Riverview Road Sheppard Drive PINSON INDIX : Tuscaloosa County COUNTY PAVED ROADS UNINCORPORATED CONTRACTED ROADS

  12. MAINTENANCE DISTRICT 4 (CAMP OLIVER ROAD) Stringfellow Hill Road UNINCORPORATED INDIX : COUNTY PAVED ROADS CONTRACTED ROADS

  13. MAINTENANCE DISTRICT 4 (15 TH ST ROAD) Patching Only – this is an PLEASANT GROVE encroachment removal project through ALDOT HUEYTOWN INDIX : COUNTY PAVED ROADS CONTRACTED ROADS

  14. MAINTENANCE DISTRICT 5 (WARRIO ARRIOR R JASPER ER ROAD) D) Central Road Beat Line Road WARRIOR SUMITON UNINCORPORATED INDIX : COUNTY PAVED ROADS CONTRACTED ROADS

  15. MAINTENANCE DISTRICT 5 (BROOKSIDE CARDIFF ROAD) CARDIFF BROOKSIDE INDIX : COUNTY PAVED ROADS CONTRACTED ROADS GRAYSVILLE

  16. MAINTENANCE DISTRICT 5 (BROOKSIDE COALBURG ROAD) CARDIFF GARDENDALE BIRMINGHAM UNINCORPORATED INDIX : COUNTY PAVED ROADS CONTRACTED ROADS

  17. MAINTENANCE DISTRICT 6 Dickey Springs Road Lindsay Loop Road Aviation Road Morgan Road (partial) BESSEMER UNINCORPORATED INDIX : COUNTY PAVED ROADS HELENA CONTRACTED ROADS

  18. MAINTENANCE DISTRICT 6 (COLUMBIANA ROAD) VESTAVIA HILLS INDIX : COUNTY PAVED ROADS CONTRACTED ROADS HOOVER

  19. MAINTENANCE DISTRICT 6 Pa Paving g to be comp mpleted d by Besse seme mer

  20. ROAD LIST (CURRENT)

  21. SO HOW DID WE DO? Of this list st, Jeffer erso son n County nty will have paved  41. 1.7 miles es of in-house house resur urfaci cing ng  53.3 miles es of contra ract ct resur urfaci cing ng 8.1 miles s of roadway y resur urfaci cing ng, , with th an additiona nal 7.3 miles es of road to be  patched hed and impr mproved d using MPO funding ding match  4.9 miles es of resur urfaci cing ng usi sing ng ATRIP funding ding match  2.4 miles es privat ately funde nded d developme pment nt impr mproveme ment nts Totaling over 100 miles of roadway…..

  22. STAFFING LEVEL – JUNE 2015 Departme tment nts s 5100 - 5700 0 (not ot counti nting Fleet et) There re are 153 actively emp mployed d perso sonne nnel, , and there re are 55 tot otal va vacanci cies s in the departme tment. nt. Out of this tot otal, l, there re are 101 emp mployees es bet etween the two maint ntena nanc nce camp mps, s, with h 40 va vacanci cies s just st at the camp mps. s. 9 emp mployees es are bridg dge/c /conc oncre rete/guar /guardr drail ail o 1 emp mployee is the arbori rist st o 2 staff f each office, e, and an additional onal 3 at each camp mp cover securit rity o Litt tter er crew o That t leaves 71 ava vailable for paving ng (about 35 at each camp mp).

  23. Wha hat t do does s th that at loo ook k like on on th the or organization anizational al cha hart? t?

  24. Roads s & Transpor nsporta tati tion CAMP BESSEMER Organizational Chart CHAR ART (5500) District Hwy Maint./Const. Supt. Vacant Asst. District Hwy Maint. /Const. Supt. Public Works Super. Public Works Super. Public Works Co-Ord. Admin. Clerk Tire Shop Supervisor Accounting Asst. II Landscape Crew Leader Landscape Crew Leader CEO CEO CEO CEO CEO St Paving Super Office (Security Included: 3 Herbicide Shifts weekend, 2 shift week) HEO HEO HEO HEO HEO Applicator Paving Crew (minimum) Truck Driver Truck Driver Truck Driver Truck Driver Truck Driver Truck Driver Truck Driver Truck Driver Truck Driver Truck Driver Truck Driver Additional Paving Crew (Adequate) Skilled Laborer Skilled Laborer Skilled Laborer Skilled Laborer Skilled Laborer Skilled Laborer Skilled Laborer Laborer Laborer Laborer Laborer Laborer Security Officer Security Officer Security Officer (Litter Crew) (Litter Crew) (Paving Crew) (Litter Crew) (Litter Crew) CEO CE O – Con Const struction Equipme ment Op Operator Updated: May 26, 2015 HEO HEO – He Heavy vy Equipme ment Op Operator

  25. Roads ds & Tran ansportati tation on CAMP KETONA Organizational Chart CHART RT (5600) Asst. District Hwy Maint./Const. Supt. Office (Security Included: 3 Shifts weekend, 2 shift week) Public Works Super. Public Works Super. Public Works Co-Ord. Accounting Asst. I Accounting Asst. II Paving Crew (minimum) Additional Paving Crew (Adequate) Landscape Crew Leader Landscape Crew Leader CEO CEO CEO CEO Const. Super. St. Paving Super. St. Paving Super. HEO HEO HEO HEO HEO Herbicide Aplctr Herbicide Aplctr Herbicide Aplctr Truck Driver Truck Driver Truck Driver Truck Driver Truck Driver Truck Driver Truck Driver Nicholaus Kelley Skilled Laborer Skilled Laborer Skilled Laborer Skilled Laborer Skilled Laborer Skilled Laborer Skilled Laborer Security Officer Security Officer Laborer Laborer Laborer Laborer Laborer (Litter Crew) (Paving Crew) (Litter Crew) (Litter Crew) (Litter Crew) Updated: May 26, 2015 CE CEO O – Con Const struction Equipme ment Op Operator HEO – He HEO Heavy vy Equipme ment Op Operator

  26. OVERTIME TOTALS Sinc nce e October er 1, 1, 2014  Camp mp Besse seme mer r (Maint ntena nance nce Distr stricts cts 2,4, and 6) – 5938.7 8.75 5 hours Camp mp Ket etona (Maint ntena nanc nce Distr stricts cts 1, 1, 3, and 5) – 4379. 9.00 00 hours   Highw hway y Engine gineering ering (Inspec specti tion on of Contrac ract t Pa Paving ng) – 1639.5 5 hours  Traffic c Engine gineerin ring g (Pa Pavement nt Mark rking Operati tions ns) – 315.00 00 hours That t averages s out to an extra 10 full l time e people le per month. th.

  27. PROJECTS BEING LOOKED INTO  Sicard Hollo low w Road Floyd yd Bradford Road   Shady y Grove e Road  Mont ntevall llo o Road SW  FY2016 6 Pa Paving ng List

Recommend


More recommend