Replacement Castlebrae High School The Site Tree from original East Neighbourhood Proposed Harewood Drive Retail Units Existing stone wall Arthur’s Seat Castlebrae Proposed Existing Library East Neighbourhood field boundary Centre and Library School site forming boundary (behind trees) Business Centre School site garden Centre and Library Have your say... Have your say... Online: www.edinburgh.gov.uk/newcastlebraehighschool Email: newcastlebrae@edinburgh.gov.uk Comments can be made until Monday 4th March
Replacement Castlebrae High School External Spaces The Wetlands The Wetlands provide a 3G Pitch sustainable drainage solution for the School which can be used as a safe A floodlit, professional learning environment for quality 3G sports pitch - this Science and other subjects will be available out of hours for community use, through Edinburgh Leisure Recreation Area An open grassed area for general recreation and active play for the School, which could also be available for community use by arrangement with the School Memorial to Craig Millar Let us know your thoughts about this important part of the site There are a number of and the history of options available for the Craigmillar Craig Millar memorial which currently sits in the centre of the site. a/ Leave the existing Memorial where it is (not always accessible to the public within the secure Town Square School grounds; b/ Mark the original location As part of the construction within the School grounds works taking place for the and move the Memorial School, we will link the The Terraces closer to Harewood Drive to paved areas outside the allow it to be accessed by East Neighbourhood Centre the public at any time. The Terraces provide a and retail units to complete comfortable outdoor dining, the Town Square which was social or teaching space part of the 2014 masterplan. with terraced seating and This area could become a views to Arthurs Seat. This focal point for the will also be one of the main community outdoor routes from lower to upper ground floors Futureproofing Castlebrae The initial proposals are designed to accommodate 700 pupils. As part of the design process, the team have been asked to 5 consider how the School could be extended to accommodate up to 1200 pupils as part of an Expansion Strategy. Phase 2 will involve an extension to the north of the School 1. Phase 1 Building building including additional teaching accommodation, along 2. Phase 2 Extension with an enlarged car park and extra Sports pitch. 3. Phase 1 Car Park 6 4. Phase 2 Car Park 5. Phase 1 Sports Pitch The team have also considered how best to extend a School with minimal disruption to the School’s day to day operation. 6. Phase 2 Sports Pitch 2 4 Have your say... Have your say... 3 1 Online: www.edinburgh.gov.uk/newcastlebraehighschool Email: newcastlebrae@edinburgh.gov.uk Comments can be made until Monday 4th March
Replacement Castlebrae High School The Building View from Niddrie Mains Road 01 Start with a Superblock form 04 Establish layers of accommodation View from Niddrie Mains Road, looking north west 02 Respond to daylighting requirements for 05 Identify the key elements adjacent buildings of the building 03 React to topography 06 Develop the “Learning Landscape” View from Niddrie Mains Road, looking east Have your say... Have your say... Online: www.edinburgh.gov.uk/newcastlebraehighschool Email: newcastlebrae@edinburgh.gov.uk Comments can be made until Monday 4th March
Replacement Castlebrae High School Internal Spaces Third Floor Learning Plaza Second Floor Dining Space Upper Ground Floor Assembly Lower Ground Floor Have your say... Have your say... Online: www.edinburgh.gov.uk/newcastlebraehighschool Email: newcastlebrae@edinburgh.gov.uk Comments can be made until Monday 4th March
Recommend
More recommend