r35024a sr 9 pccp overlay discussion topics
play

R35024A SR 9 PCCP Overlay Discussion Topics Phases Traffic - PowerPoint PPT Presentation

R35024A SR 9 PCCP Overlay Discussion Topics Phases Traffic Control Mix Design Construction Method Challenges Phases Completed E1 1.1 miles 2000 cy E2 1.1 miles 2000 cy D1 1.63 miles 3000 cy D2


  1. R35024A SR 9 PCCP Overlay

  2. Discussion Topics • Phases • Traffic Control • Mix Design • Construction Method • Challenges

  3. Phases Completed • E1 1.1 miles 2000 cy • E2 1.1 miles 2000 cy • D1 1.63 miles 3000 cy • D2 1.63 miles 3000 cy • C1 2.46 miles 4400 cy • C2 2.46 miles 4400 cy • B2.1 1.4 miles 2600 cy • B2.2 1.4 miles 2600 cy

  4. Phases • B1.1 0.8 miles 1400 cy 24 Hour Traffic control • B1.2 0.8 miles 1400 cy 24 Hour Traffic control • A1 1.57 miles 2900 cy • A2 1.57 miles 2900 cy • F1 1.15 miles 2100 cy 24 Hour Traffic control • F2 1.15 miles 2100 cy 24 Hour Traffic control

  5. Traffic Control • Two types for PCCP • Road Closed to thru traffic Sections E, D, C, B2, A • 24 hour bi-directional traffic control B1, F

  6. Mix Design • Included 4# of Macro Fibers • Was designed to get breaks in 30-36 hours due to the construction timetable • Plant was located At US Aggregate Flat Rock Site

  7. Plant Site

  8. Basic Outline of Method • Shift into traffic control • Profile Mill • Shoulder Mill • Asphalt Patching • Shoulder Treatment • Install Bars • Concrete Pave 6” overlay 8” on shoulder • Install Shoulder Cap

  9. Profile Milling

  10. Shoulder Treatment

  11. Install bars

  12. Concrete Paving

  13. Concrete Paving

  14. Concrete Paving

  15. Concrete Paving

  16. Concrete Paving

  17. Concrete Paving

  18. Concrete Paving

  19. Concrete Paving

  20. Concrete Paving

  21. Concrete Paving Curing 2X

  22. Concrete paving Hand work fill-ins

  23. Finished Product

  24. Finished Product

  25. Finished Product

  26. Challenges • Phases 14 • Traffic Control: lots of thru traffic • Mix Design construction schedule • Construction Method • Bars installation • Saw-cutting 165,000 lf • Stable Trackline • Three structures with thickened transitions

  27. Thank you