push down push up landlord tenant collaboration
play

PUSH DOWN/PUSH UP: LANDLORD & TENANT COLLABORATION CHALLENGES - PowerPoint PPT Presentation

Session B2: 10:55AM PUSH DOWN/PUSH UP: LANDLORD & TENANT COLLABORATION CHALLENGES AND SUCCESSES IN ACHIEVING A SUSTAINABLE BUILDING Moderator: Max Collett , Partner, Real Estate & Environmental Law, Bull, Housser & Tupper LLP


  1. Session B2: 10:55AM PUSH DOWN/PUSH UP: LANDLORD & TENANT COLLABORATION – CHALLENGES AND SUCCESSES IN ACHIEVING A SUSTAINABLE BUILDING Moderator: Max Collett , Partner, Real Estate & Environmental Law, Bull, Housser & Tupper LLP Speakers: Jennifer Davis , Principal, TurnLeaf Consulting Inc. Sunny Ghataurah , President & CEO, AES Engineering Dan Lee , Director, Facilities Management, Vancouver Convention Centre

  2. AGENDA • Our Story • Market Conditions • Other Metrics • Roles • “Low hanging fruit”

  3. OUR STORY

  4. OUR STORY – AES ENGINEERING Electrical, Lighting, Communication, Security, • Audio Visual and other engineering technology services • Established 2001 • Offices in Calgary, Vancouver and Victoria with 90 staff

  5. OUR STORY – AES ENGINEERING Credentials include: • o Architectural lighting design, CLD, IALD & LC o Communication & security design, RCDD o A/V design, CTS; o Sustainable design, LEED AP BD+C & ID+C o ULC stds / CE Code / CSA steering committee, Elev. Code, NBCC chair liaison, BC Code adoption committee chair, NEC member representation & CoV Building Board of Appeal Vice-Chair

  6. METRO VANCOUVER MARKET CONDITIONS

  7. CURRENT RATING SYSTEMS • BOMA BEST • Leadership in Energy and Environmental Design (LEED)

  8. CURRENT RATING SYSTEMS • Green Globes • Living Building Challenge

  9. CURRENT ENERGY STANDARDS • ASHRAE 90.1 – 2010 • ASHRAE 90.1 – 2010 / 2013 / 2016 • NECB 2011 • NECB 2011 / 2015

  10. CITY OF VANCOUVER REQUIREMENTS

  11. VANCOUVER REQUIREMENTS • Current rezoning requirement – LEED Gold minimum – 22% better than baseline energy performance (ASHRAE 90.1 – 2010)

  12. VANCOUVER REQUIREMENTS • July 2016 Zero Emissions Building Plan (ZEBP) • 90% GHG reduction by 2025 • Zero GHG by 2030 • 100% renewable energy by 2050

  13. VANCOUVER REQUIREMENTS • EUI – Energy Use Intensity • GHGI – Green House Gas Intensity, kg CO2e/m2 • NRES – Neighbourhood Renewable Energy System • TEDI – Thermal Energy Demand Intensity, kWh/m2

  14. VANCOUVER REQUIREMENTS GHG and Energy Targets – Office

  15. OTHER METRICS

  16. RATING SYSTEM • WELL Building Standard

  17. WELL BUILDING STANDARD

  18. RATING SYSTEM • Passive House

  19. ROLES OF LANDLORD & TENANTS

  20. ROLES • Three rules of Real Estate 1. Location 2. Location 3. Location

  21. ROLES • Three rules for Buildings What are the systems? 1. Education… How do they work? 2. Education… When do they work? 3. Education…

  22. LOW HANGING FRUIT

  23. NEW CAR • Safety check done

  24. NEW CAR • Ran out of time so didn’t test all systems

  25. RATING SYSTEM • Commissioning

  26. ENERGY MONITORING DASHBOARD www.AESengr.com

  27. Session B2: 10:55AM PUSH DOWN/PUSH UP: LANDLORD & TENANT COLLABORATION – CHALLENGES AND SUCCESSES IN ACHIEVING A SUSTAINABLE BUILDING Moderator: Max Collett , Partner, Real Estate & Environmental Law, Bull, Housser & Tupper LLP Speakers: Jennifer Davis , Principal, TurnLeaf Consulting Inc. Sunny Ghataurah , President & CEO, AES Engineering Dan Lee , Director, Facilities Management, Vancouver Convention Centre

Recommend


More recommend