Public Meeting Wednesday, December 12, 2018 6:00 PM Jefferson Middle School 10900 Shaenfield Road
Welcome and Introductions Remarks Presentation Open House (Q & A)
Bridgewood Subdivision is located within Bexar County The existing infrastructure consists of flexible asphalt pavement roadways with standard curbs, 3-foot wide sidewalks and non-compliant ADA accessible curb ramps. Field investigations show that the roadways are in poor to moderately-poor conditions with visible signs of distress and base failures along each street.
Project proposes road and drainage improvements for approximately 15 streets (1.8 miles) Project will reconstruct the current 2-lane roadway to include 30-foot street width, curb and gutter, and 4-foot sidewalks All existing utilities will remain underground Existing waterline will remain with minor adjustments Existing sanitary sewer will remain with minor adjustments Driveways penetrations may be required
Project to advertise in January 2019. Construction to begin in 2 rd Quarter of 2019. Estimated Construction Cost: $4.3 Million (including joint utilities)
Bexar County Larry Picasso, P.E. – Capital Projects Engineer – Bexar County Public Works Contact info (210) 335-6706 Bridell Miers, EIT– Civil Engineering Assistant -Bexar County Public Works Contact info (210) 335-0822