More Energy from Hydropower Provider for entire electromechanical equipment for small hydroelectric power plants since 1896 GEPPERT GmbH, Breitweg 8-10b, 6060 Hall in Tirol, Austria 1 www.geppert.at
We realize your desire for … - Consultancy - Design and development - New development - Modernization and refurbishment - Maintenance and service - Repair and overhaul … of your Hydroelectric Power plant 2 www.geppert.at
We guarantee you … - Quality of workmanship and implementation - Head start in experience and innovation - Guaranteed efficiency (model test) and optimised fluid mechanics (simulation) - On your request – full range supplier – turn key 3 www.geppert.at
Your benefit with us as your partner is … - Guaranteed earning power and cost effectiveness with yield stability and stable value - Ease of maintenance and servicing - High grade of availability and reliance also after decades in permanent operation - Intellectual and easy operability and logic remote control - Observance of environmental protection 4 www.geppert.at
Your reliable partner High quality is the precondition for the high Guntram Geppert earning power of our hydroelectric power plants. Since 1896 the Geppert family has been standing for long range hedging and rooted to the soil management of their company, supplying innovative power station Wilfried Geppert equipment with innovative technology in sound construction 5 www.geppert.at
Efficient structure Management Guntram Geppert QM Operations scheduling Guntram Geppert Helmut Rampl Head of Engineering, Sales, Purchasing Engineer Work master Accountancy Development Florian Seelos Walter Moser Ownership: Geppert family Jelica Maros Thomas Marthe Proxy Head of Engineering Ulrich Ruggenthaler Quality Assurance Lathes Michael Pedevilla Legal form: limited liability company CNC boring machines Efficiency measurement Thomas Siller and non distructive (Gesellschaft mit beschränkter Haftung) material testing Ulrich Ruggenthaler Grinding Head of Design Hannes Stöckl Branka Jereb Electric and Automation Fitter‘s shop Engineering Wolfgang Hotter Oliver Gritscher Designers Number of employees: 56 Workshop assembling Gerhard Rampl Clemens Schmidt Project Manager Günter Schranz Ulrich Ruggenthaler Zorica Rajic Christian Moriel Number of trainees: 4 Dilber Uzun-Röttger Thomas Gruber Assembling Dietmar Flörl Hans Peter Nißl Gabriel Schöpf Annual turnover: € 18.500.000 Export rate: 60-85 % 6 www.geppert.at
Certified… EN ISO 9001:2008 7 www.geppert.at
Geppert - your international Partner We are a well established turbine supplier for private companies and utilities in Austria and its neighbouring alpine countries. In the last years new projects have been realised also in Greece, Turkey, South America, Africa and Southeast-Asia. 8 www.geppert.at
International Transportation logistics - We deliver the Turbine equipment directly to your Power house -Transportation per Truck, - in special cases per Ship or Helicopter 9 www.geppert.at
Solutions for small hydroelectric power plants from one source Also you should benefit as client from the excellent quality of our products. Highly qualified Austrian technicians and most modern machine tools facilitate a precise and first class machining of the components Efficient project management facilitates a continuous monitoring of the project implementation progress 10 www.geppert.at
Power plants solutions In line with the nature Geppert has been building small hydro power plants for more than a century, following the device: “ Traditionally more renewable energy from Hydropower” – in line with the nature. 11 www.geppert.at
Modern manufacturing - Design in 3D and 2D - FE calculation - Flow simulation - top modern CNC machines - milling freeform surface by CAM - trained specialists 12 www.geppert.at
Production Range of Turbines … - Pelton Turbines - Francis Turbines - Diagonal Turbines - Kaplan Turbines - Guaranteed • efficiencies • runaway speed • Cavitation based on model tests 13 www.geppert.at
Pelton Turbines -up to 10MW - up to 1000 m Head -vertical or horizontal shaft - 1 to 6 nozzles - inside or outside regulated nozzles -conducted with Jet deflector -hydraulically or electrically operated - special condition for drinking water solutions 14 www.geppert.at
Francis Turbines - up to 10MW - up to 200m Head - vertical or horizontal shaft - open flume or Spiral Units - Outside regulated guide vanes hydraulically or electrically operated 15 www.geppert.at
Diagonal Turbines -up to 5MW - up to 80m Head - double regulated reaction Turbine - vertical or horizontal shaft - adjustable guide vanes and runner blades - High partial-load efficiencies and increased annual production 16 www.geppert.at
Kaplan Turbines -up to 5MW - up to 30m Head - as chamber, bulb or spiral Turbine - vertical or horizontal shaft - adjustable guide vanes and runner blades - Special Type „Kaplanaggregat“ complete placed in the water 17 www.geppert.at
Ball Valves -up to 1200 mm nominal diameter - up to 120 bar nominal pressure - as ball valve or spherical valve - elastic or metallic operation seal - emergency shut-down with drop weight - Optional with revision sealing 18 www.geppert.at
Butterfly Valves -up to 1200 mm nominal diameter - up to 40 bar nominal pressure - excentric beared shaft - low pressure losses - hydraulically efficient design - short installation length 19 www.geppert.at
Turbine Governor / Automation Automation by utilisation of PLCs for new and existing plants. These automations can manage a fully automated unmanned operation with remote enquiry and SMS- message alarming according to the clients ‘ requirement 20 www.geppert.at
After – Sales - Service Our trained team of technicians combined with many spare parts in store minimise eventual periods of disruption of energy generation. By refurbishment of your older plants you can achieve increase of efficiencies and more economical operation 21 www.geppert.at
Refurbishment and upgrading - Handycraft - Experience - precision 22 www.geppert.at
Testing - Pressure Test - non destructive material testing - factory acceptance Test 23 www.geppert.at
Installation on site Our trained team of technicians have many experience in installation of our Turbine Equipment on site. Equipped with special tools, they give their best to make sure that your plant reaches a long lifetime. 24 www.geppert.at
We are at your service Geppert GmbH Breitweg 8-10b A-6060 Hall in Tirol Austria Telephone: +43(5223) 57788 Fax: +43(5223) 57788 2 Email: office@geppert.at Internet: www.geppert.at 25 www.geppert.at
Investing in the future – new production facility Production square: 6.000 m² Inside storage: 3.000 m² Office square: 700 m² Ideal access - industrial area Building can be extended Modern tool machines, welding hall, Completion: until 2014 sand blasting room, corrosion Location: Hall West protection, assembling hall with 32t-crane, testing facilities etc. 26 www.geppert.at
Thanks for your attention 27 www.geppert.at