  2. Current work in progress within GRI NW in 2012 � Commitment has been found for the following workstream Evaluation of the GRIP to ensure that it GRIP is `fit for purpose` Ensure full and consistent implementation Ensure full and consistent implementation Transparency of information provisions Exploring the feasibility of introducing Implicit implicit allocation in the gas market allocation Create early understanding of FGL/NC to Pre-com ensure efficient comitology meetings �� �� ������������������������������

  3. Evaluation of GRIP: ensure that next GRIP is most ‘fit for purpose’ for stakeholders in the region � Discussion of NRA recommendations with TSOs in the fall of 2012 Contribution to consistency Understanding Potential CB-congestions CB-congestions investment gaps investment gaps ��������� Proposed ��������������� recommendations Interaction Modelling exercise with stakeholders 3 �� �� ������������������������������

  4. Transparency project: ensure full and consistent implementation of information provisions � ACER is elaborating European conclusions paper, GRI NW project finalized Assessment of Information Stakeholder Completion of stakeholder send to ACER questionnaires consultation feedback for as input for to assess closed individual TSOs European project compliance (January 2012) finalized (2011 ) (March 2012) 4 �� �� ������������������������������

  5. Gas Target Model: exploring the feasibility of introducing implicit allocation in the gas market � RCC position paper is currently up for public consultation, workshop on 19 October Content of position paper 19 Oct 23 Nov 1 Oct Issues associated with allocation 1 of capacity in gas markets Launch of Final position public paper European measures to solve 2 issues related to allocation consultation (SG meeting) 3 Added value of Implicit Allocation Workshop Prerequisites for the introduction 4 (The Hague) of implicit allocation 5 �� �� ������������������������������

  6. Pre-comitology meetings: create early understanding of FGL/NC to ensure efficient comitology � Three meetings have taken place An open dialogue between MS, TSOs, NRAs, EC… NRAs have explained the principles in • the Framework Guidelines and GTM; …have already led to better understanding towards • TSOs have explained the design positions on FGLs/ NCs… choices in the network code for CAM … and should result in more • European Commission has explained efficiënt comitology process ratio and elements of CMP guideline 6 �� �� ������������������������������

  7. Upcoming project: coordination of the implementation of network codes � The monitoring process will be finalized in the upcoming months Regional Role of the region: operalization Regional operalization to make rules Regional operalization to make rules ”fit for purpose”(where and if required) Reporting Implementation plan Assist in timely monitoring and consistent implementation of the codes Report progress/ obstacles to ACER/ Actual Monitoring European Commission/ Member States implementation 7 �� �� ������������������������������

  8. Upcoming project: assessement of market liquidity and degree of market integration � NRAs are currently determining the approach Background in GTM Envisioned approach � Assessment of market liquidity on � � NRAs shall assess market liquidity national level, coordinated by RCC and degree of market integration � Identify best practices how liquidity � Close cooperation with each other, can be raised on national level stakeholders involved through GRIs � Lessons learned discussed � Where necessary, NRAs explore during (upcoming) SG meeting measures to improve market liquidity and the degree of market integration 8 �� �� ������������������������������

  9. CAM roadmap: current bottom up projects within GRI NW � Roadmap has been drafted by ENTSOG in cooperation with ACER CAM Roadmap Bundled product ������������� Joint Capacity at Eynatten �������� Platform Initiative (Belgium/ ���������������� Germany) 9 �� �� ������������������������������

  10. The British, Belgian and Dutch regulator have launched a call for evidence on the use of their gas interconnectors � Aim is to come to a view on what barriers exist and which are most significant Series of bilateral Invitation to ������� Public workshop meetings for submit written in London on 21 regulator(s) to analysis by 20 November interview December stakeholders 10 �� �� ������������������������������