PRESENTATION IPS ION POLARIZATION SYSTEM THE IDEAL SOLUTION FOR COMPLICATIONS WITH LIMESCALE
EACH OF US HAS ALREADY MET WITH LIMESCALE? RESULT? • UNEXPECTED OPERATING COSTS • OUTAGES THAT COST TIME AND MONEY • COSTLY SERVICING AND MAINTENANCE OF EQUIPMENT • NECESSITY TO PURCHASE NEW EQUIPMENT
Established limescale causes a variety of functional It affects the function of disorders and reduces the In the case of hot water system components such as energy efficiency of the WHAT systems, the accumulation of pumps, valves, nozzles and device. Tests have shown that water stones causes a number the like; this affects the the 1.5 mm layer of scale of negative factors: maintenance and security of reduces the efficiency of the the entire system device, e.g. boilers, 11%, CAUSES 3mm by 20%, 6mm to 35% LIMESCALE Fixed deposits - inlay act as It reduces the rate of water Costs of downtime, service an insulator (200 -300x flow through the pipe, which lower conductivity than the interventions, cleaning, leads to increased costs of metal) delays the transfer of rinsing, premature operation of the electric heat from the heater to the replacement of parts and pump to the need for whole devices water - heating of water exchange. takes much more time.
WHAT CAUSES LIMESCALE Effect of sediment thickness on the number of hours of Loss of efficiency of the heater depending on the thickness water heating in the copper pipe (source: Portsmouth of the deposits University)
HOW TO REMOVE LIMESCALE? Most environmentally friendly and financially the least onerous solution is just physical treatment. It is secured by an IPS maintenance-free device (ion polarization system) With the effect of elimination of limescale min. 76% efficiency (IAPMO)
01 02 TECHNICAL 03 The IPS is composed of a flow-through body with inlet and outlet ports. Electrodes are located in 04 the body. Each is of other DESCRIPTI electrically conductive The electrical voltage of material. The water that this cell is sufficient for flows through the body water molecules to When water flows creates a galvanic wet cell polarize. The voltage is between electrodes, there ON OF IPS dependent on the electrical with the electrodes. is a phenomenon when conductivity of the water. calcium, magnesium and This phenomenon can be iron salts in the form of used with water with a carbonates, sulphates and conductivity of 50 - 2000 chlorides are dissociated to μ S / cm2. This is hydroxides. As a result, conventional water in which cations lose the ability to the salt content is from 50 form crystalline deposits. to 2000 mg / l. These carbonates are formed further, but only in the form of soft particles - sludge.
EVIDENCE OF ENERGY FLOWING IN IPS
BENEFITS OF IPS DEVICE • WITHOUT EXTERNAL SOURCE • WITHOUT MAINTENANCE • NO OPERATING COSTS • NO CHEMISTRY • PATENTED TGP TECHNOLOGY • CERTIFICATED EFFICIENCY • ENVIRONMENTALLY-FRIENDLY (ECOLOGICAL)
BENEFITS OF IPS DEVICES • PROTECTS EQUIPMENT, PIPES AND APPLIANCES AGAINST HARD DEPOSITS AND CORROSION • THEY ARE VERY EFFECTIVE IN CIRCULATING BRANCHES OF HOT WATER ALONG WITH A CIRCULATING PUMP. • REDUCES CHLORINE IN WATER - BENEFICIAL TO THE SKIN • ADJUSTS PH 7.5 - 9.0 (LOWEST CORROSION) ALKALINE WATER - BENEFICIAL TO THE HUMAN ORGANISM • IT IMPROVES THE QUALITY OF DRINKING WATER - (FLAVOR AROMA) AND HOT WATER • AREAS OF APPLICATION IPS DEVICE? • CAN BE USED EVERYWHERE AND DAILY, WHERE COLD WATER OR HOT WATER IS WITH A HARDNESS OF MORE THAN 1.8 MMOL / L (OR 10 ° DH)..
EFFICIENCY OF IPS • TESTING OF IPS DEVICE FOR THE PROTECTION OF HEATING BODIES, PRIOR TO LIMESCALE CLOGGING • PIC. 1 : DEMONSTRATION OF ARAGONITE DEPOSITS IN THE 1. 1. 1. BOILER . (MODIFIED BY IPS ) • PIC. 2 : A CLEAR DEMONSTRATION OF SPIRAL CLOGGING. • COIL ON THE LEFT – TRERATED BY IPS 1. 2. • SPIRAL ON THE RIGHT – WITHOUT TREATMENT
IPS PERFORMANCE CERTIFICATE • THE EFFICIENCY CERTIFICATE CONFIRMS A MINIMUM EFFICIENCY OF 76.3% FOR THE REDUCTION OF HARD SCALE ON HEATING ELEMENTS.
IPS TEST REPORT SILVER
Cerfitication TUV/SUD
EFFICIENCY OF IPS IN CIRCULATING CIRCUIT
ADVANTAGES OF S.A.T. • OWN DEVELOPMENT AND PRODUCTION • WORLD-WIDE PATENTED KNOW-HOW • CERTIFICATED EFFICIENCY ( IAPMO R&T) • ADVICE + PROPOSAL FOR SOLUTION AND DELIVERY OF EQUIPMENT • QUALITY&RELIABILITY OF OUR PRODUCTS
CONTACT US! MUS SERVICES S.R.O. ROYOVA 2890/31 831 01 BRATISLAVA - MESTSKÁ ČASŤ NOVÉ MESTO SLOVAKIA, EUROPE ING.KAROL LAURINEC TEL: +421 911 741 911 INFO.MUSSERVICES@GMAIL.COM, KLAURINEC@GMAIL.COM WWW.IPS.SYSTEMS
Recommend
More recommend