Particle Physics Roadmap(s) � – KET / German strategy – update European Strategy (2013) – Snow Mass activities – ILC status – time lines – personal remarks Particle Physics Roadmap(s) S. Bethke MPP Project Review, 17.12.2013 � 1
KET: German Strategy � – 12/2010: Perspektiven der Teilchenphysik: 1. LHC operation (14 TeV, 10 34 cm 2 s -1 ) 2. update to hl-LHC (2020-) 3. developments towards an internat. e+e- linear collider 4. contribution to a super-flavour factory 5. contributions to internat. neutrino projects 6. R&D for future accelerators and detectors 7. strong theory program � – 7/2013: input to European Strategy (same points as above) Particle Physics Roadmap(s) S. Bethke MPP Project Review, 17.12.2013 � 2
The European Strategy Group of Council chair: A. Spiro / A. Zalewska scient. secretary: T. Nakada � 3 Particle Physics Roadmap(s) S. Bethke MPP Project Review, 17.12.2013
The European Strategy Group of Council timeline: � – Mar. 16 2012: first meeting of strategy group � – Sept 2012: open community meeting (Cracow, Poland) (announcement of Japan to host the ILC) � – Nov. 2012: KET statement on ILC@Japan: enthusiastic support � – Jan 2013: closed meeting (Erice / Sicily) –> draft strategy document to Council � – May 30 2013: Strategy session of Council at Brussels –> adoption and presentation of European Strategy of Particle Physics � 4 Particle Physics Roadmap(s) S. Bethke MPP Project Review, 17.12.2013
The European Strategy Group of Council approved strategy paper: http://council.web.cern.ch/council/en/EuropeanStrategy/esc-e-106.pdf top priorities: Europe’s top priority should be the exploitation of the full potential of the LHC, including the high-luminosity upgrade of the machine and detectors with a view to collecting ten times more data than in the initial design, by around 2030. CERN should undertake design studies for accelerator projects in a global context, with emphasis on proton-proton and electron positron high-energy frontier machines. Europe looks forward to a proposal from Japan to discuss possible participation (in the ILC) . CERN should develop a neutrino programme to pave the way for a substantial European role in future long-baseline experiments. plus: theory; flavour physics; detector R&D; collab. with APPEC; EC, organ; outreach; …. � 5 Particle Physics Roadmap(s) S. Bethke MPP Project Review, 17.12.2013
Snow Mass activities Community Summer Study 2013 Snowmass on the Mississippi (July 29 - August 6, 2013) develop the community's long-term physics aspirations. • Energy Frontier ◦ Chip Brock (Michigan State), Michael Peskin (SLAC) • Intensity Frontier ◦ JoAnne Hewett (SLAC), Harry Weerts (Argonne) • Cosmic Frontier ◦ Jonathan Feng (UC Irvine), Steve Ritz (UC Santa Cruz) • Frontier Capabilities ◦ William Barletta (MIT), Murdock Gilchriese (LBNL) • Instrumentation Frontier ◦ Marcel Demarteau (ANL), Howard Nicholson (Mt. Holyoke), Ron Lipton (Fermilab) • Computing Frontier ◦ Lothar Bauerdick (Fermilab) and Steven Gottlieb (Indiana) • Education and Outreach ◦ Marge Bardeen (Fermilab), Dan Cronin-Hennessy (U of M) • Theory Panel ◦ Michael Dine (UC Santa Cruz) � 6 Particle Physics Roadmap(s) S. Bethke MPP Project Review, 17.12.2013
Snow Mass priorities: http://www-public.slac.stanford.edu/snowmass2013/SnowmassWorkingGroupReports.html • LHC! • LHC upgrade !! • ILC / Japan • accel. R&D; VLHC • long baseline; CP violation; NDBD • baryon number violation (proton decay); project X • charged lepton exp. program (mu2e, mu magn. moment,..) • quark flavour • nucleons, nuclei, atoms, WIMPs, … all reports go to P5-panel, which will do the prioritisation: P5 meeting at BNL, Dec 15-18, 2013 http://www.usparticlephysics.org/p5 � 7 Particle Physics Roadmap(s) S. Bethke MPP Project Review, 17.12.2013
LCWS13 Tokyo from: Hitoshi Yamamoto’s presentation � 8 http://agenda.linearcollider.org/conferenceTimeTable.py?confId=6000#20131111
ILC Timeline Proposed by LCC 2013 - 2016 • – Negotiations among governments – Accelerator detailed design, R&Ds for cost-effective production, site study, CFS designs etc. – Prepare for the international lab. 2016 – 2018 • – ‘Green-sign’ for the ILC construction to be given (in early 2016 ) – International agreement reached to go ahead with the ILC – Formation of the ILC lab. – Preparation for biddings etc. • 2018 – Construction start (9 yrs) 2027 • – Construction (500 GeV) complete, (and commissioning start) (250 GeV is slightly shorter) � 9
Future Accelerator Studies at CERN: Particle Physics Roadmap(s) S. Bethke MPP Project Review, 17.12.2013 � 10
Particle Physics Roadmap(s) S. Bethke MPP Project Review, 17.12.2013 � 11
Particle Physics Roadmap(s) S. Bethke MPP Project Review, 17.12.2013 � 12
LHC schedule beyond LS1 Only EYETS (19 weeks) (no Linac4 connection during Run2) LS2 starting in 2018 (July) 18 months + 3months BC (Beam Commissioning) LS3 LHC: starting in 2023 => 30 months + 3 BC injectors: in 2024 => 13 months + 3 BC 2015 2016 2017 2018 2019 2020 2021 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 LHC Run 2 LS 2 Run 3 b b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o Injectors o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o t 2022 2023 2024 2025 2026 2027 2028 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 LHC LS 3 Run 4 o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o Injectors o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o 2029 2030 2031 2032 2033 2034 2035 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 LHC LS 4 Run 5 LS 5 b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o Injectors b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o LHC schedule approved by CERN management and LHC experiments spokespersons and technical coordinators Monday 2 nd December 2013 Particle Physics Roadmap(s) S. Bethke MPP Project Review, 17.12.2013 � 13
personal (SB) timeline shown at 2012 KET JV: (HE / large projects only) R&D construction running 2010 2015 2020 2025 2030 2035 LHC hl-LHC ILC CLIC; µ C; VLHC; … Particle Physics Roadmap(s) S. Bethke MPP Project Review, 17.12.2013 � 14
personal (SB) timeline update due to actual planning (HE / large projects only) R&D construction running 2010 2015 2020 2025 2030 2035 LHC hl-LHC ILC CLIC; µ C; VLHC; FCC; … Particle Physics Roadmap(s) S. Bethke MPP Project Review, 17.12.2013 � 15 � 15
finally: timeline MPP Particle Physics Roadmap(s) S. Bethke MPP Project Review, 17.12.2013 � 16