  6. Expansion of the OSU Medical Center Campus University Hospital The James Cannon Garages The new James & Critical Care Building Ross Heart Hospital Cannon Drive Medical Center Drive 6 6

  7. Creating the future of medicine… 7

  8. OSU Medical Center Expansion Overview  New home for James Cancer Hospital & Solove Research Institute  New critical care center  Integration of patient care, research and teaching spaces  The new building will support the highest- quality personalized medicine, making health care more effective and affordable 8

  9. Cancer Hospital Room Draft Image 9

  10. Critical Care Patient Room Draft Image 10

  11. Concourse: View from South Cannon Garage Draft Image 11

  12. Concourse: Connection to Rhodes Draft Image 12

  13. Concourse: Looking west from Rhodes Draft Image 13

  14. Concourse: Library and Resource Draft Image 14

  15. Second Floor: Main Waiting Draft Image 15

  16. Second Floor: Infusion Draft Image 16

  17. Community Commitment  Partnering with City of Columbus  Revitalization around University Hospital East  Eighth Avenue Green Space  Community Garden  Cannon Drive Realignment  Olentangy River 17

  18. Environmental Stewardship  Certified under the LEED Green Building Rating System ™  We hope to achieve “Silver” certification  Cancer and critical care towers designed to use 20 percent less energy  Emphasis on recycled and recyclable materials 18

  19.  Means Hall demolition  Recycling demolished materials  50 percent of construction waste will be recycled. 19

  20. Green Spaces ProjectONE Ross Heart Hospital Hospitals Garage SafeAuto Atwell Hall McCampbell IBMR Dodd/Davis Hall 20

  21. Chlois G. Ingram Spirit of Women Park 21

  22. Phyllis A. Jones Legacy Park 22

  23. Terrace Gardens 23

  24. Job Growth 24

  25. Job Growth – City of Columbus  5,000 new construction jobs  5,615 new full-time jobs  2,600 indirect, full-time jobs  Will nearly double the Medical Center’s annual business volume  EDGE goal = 20% 25 25

  26. Economic Development 26

  27. Expansion Plan Finances  $925 million in bonds issued by Ohio State for the expansion  $75 million of the expansion will be funded through philanthropy  Federal, State and City support has been vital 27

  28. 2011: A Look Ahead  New Building Start Finish  Mass Excavation………………… Sept 2010 Feb 2011  Foundation Work………………… Dec 2010 May 2011  Steel Frame………………………. April 2011 Dec 2011  Chlois G. Ingram Spirit of Women Park Construction Begins-Spring  Construction of New Chiller Plant-Summer  Underground Utility Work Continues  12 th Avenue closed to thru-traffic through 2011 28

  29.  5,600 truck loads of dirt needed Building to be removed to create the Excavation basement of the new building  700 loads of concrete are needed for the basement slab 29