oak creek low water crossing capstone
play

Oak Creek Low Water Crossing Capstone FawazAlotaibi Bruce Connolly - PowerPoint PPT Presentation

Oak Creek Low Water Crossing Capstone FawazAlotaibi Bruce Connolly Devin Kelley Hilary Sizemore Research Analysis Geomorphology Modeling AutoCAD Gantt Project Survey Hydraflow Express USGS Data Chart Bentley


  1. Oak Creek Low Water Crossing Capstone FawazAlotaibi Bruce Connolly Devin Kelley Hilary Sizemore

  2.  Research  Analysis  Geomorphology  Modeling  AutoCAD Gantt  Project Survey  Hydraflow Express  USGS Data Chart  Bentley Water Gems  Gauge Data  Culvert Master  HEC ‐ RAS Tasks  Design  Impacts  Political  Reports & Presentation  Social  50% Design Report

  3.  Finished Surveying Points  Created Cross Sections for HEC ‐ RAS  Gathered Sedona Gage Data  Not using HEC ‐ HMS Past 2 Weeks  Delineated Watershed (01/27 ‐ 02/11)  Impacts  Social  Political

  4. Finished Survey Topography Looking Up Stream ‐ Completed Looking Down Stream ‐ Incomplete

  5.  Sedona gage station is below Shangri La low water crossing  Gage data is available Sedona Gage  Removal of HEC ‐ HMS Data  Possibility of errors  More convenient  Simple Area Regression

  6. Watershed Delineation • Area = 140 sq. mi. • Area Regression from Gage Data • ~ 60% from Sedona gage

  7. Social Political  Improved dependability on the crossing  Negligence and major Impacts  Higher property values changes to Oak Creek could result in legal  Constant access actions taken by the  Potential for safe community working conditions in Oak Creek

  8.  Finish Interpreting Gage Data  Finish HEC ‐ RAS Model Next 2 Weeks  Start Analysis Rain and Snowmelt  Geomorphology (02/11 ‐ 02/24) 12000  Culvert Master 10000  AutoCAD 8000  Begin 50% Design CFS 6000 Report 4000 2000 0 1 10 Flood Return Period (years)

Recommend