neoterm termotecnica industriale s r l epc contractor for
play

NEOTERM TERMOTECNICA INDUSTRIALE S.r.l. EPC Contractor for - PowerPoint PPT Presentation

NEOTERM TERMOTECNICA INDUSTRIALE S.r.l. EPC Contractor for Industrial & Power Plants since 1980, abroad and in Italy Viale Brodolini Z.I. - 84091 Battipaglia (SA) We operate with a turnkey approach deliverying solutions to our Customers


  1. NEOTERM

  2. TERMOTECNICA INDUSTRIALE S.r.l. EPC Contractor for Industrial & Power Plants since 1980, abroad and in Italy Viale Brodolini Z.I. - 84091 Battipaglia (SA) We operate with a turnkey approach deliverying solutions to our Customers Our Team Our facility 14000 m2 Approx 50 people: Offices • Engineers; 1600 m2 • Drafters; • SW developers; Workshop • Administration; 1500 m2 • Sales force; • Qualified welders; Outside We are committed to our Customer • Piping; Warehouse area success guaranteeing plant 12000 m2 600 m2 • Steel structure; performances and timely execution of • Electricians; the projects • I&C field personnel.

  3. Our Key Business Areas:  CHP – combined heat and power plants  Gas fired thermal stations  Industrial projects Company expertise:  Engineering  Boilers – directly fired and HRSG  Power stations  Complete Piping Systems  Plant DCS and Burner Management Systems We deliver Solutions to our  Gas Stations Customers to accomplish their specific needs

  4. E NGINEERING Termotecnica Industriale has a consolidated expertise as Engineer. We have a multidisciplinary, integrated approach, with competencies on Civil, Mechanical, Process, Electrical and I&C engineering. Softwares utilized AutoCAD  ESApro  Complete suite for integrated plant engineering: P&ID, Piping, Data sheet, Sketch, Hook up,… SPAC  Electrical schematics software TecnoMETAL  Steel structures engineering

  5. P ROCUREMENT Equipment specification, suppliers qualification, negotiations and follow up. C ONSTRUCTION Complete overview on project, from engineering to beneficial use, inclusing site management and commissioning by skilled personnel. S ERVICE To help our Customers to achieve their business targets, our specialists are always available for maintenance or emergency repairs.

  6. NEOTERM

  7. NEOTERM S.r.l. Since 1950 engineers and manufacts of Conventional, biomass Boilers and HRSG abroad and in Italy Via Renè Vanetti 21100 - Varese Our boilers have been operated for 30 Out team years deliverying our Customers top Approx 23 people: performances with oustanding • Engineers; reliability. • Drafters; • Administration; • Sales force; • Welders; • Piping assemblers; • Steel structures Our Customer Services team provides lifecycle services to our boilers fleet.

  8. Our Applications…..  Paper mills  O&G and chemical facilities  Textile facilities  Food industries  Sugar production facilities  CHP plant  Utility  Waste to Energy  Renewable energies / Biomass

  9. Key activities: NEOTERM si focused on engineering and construction of boilers. We deliver: SATURATED / SUPERHEATED STEAM BOILERS:  ON NATURAL GAS / FUEL OIL  BIOMASS  FIRED WITH INDUSTRIAL WASTES HRSG :  GAS TURBINES  RECIPROCATING ENGINES  WASTE TO ENERGY FURNACES HOT and SUPERHEATED WATER BOILERS

  10. Principali attività: FIRE TUBE BOILERS MARINE BOILERS (Water Tubes / Fire Tubes) DIATHERMIC OIL RECUPERATORS HEAT RECOVERY SYSTEMS:  Economizers  Air preheaters BURNERS:  For industrial fuels  For natural gas  For HRSG

  11. NEOTERM ’s Activities: H.R.S.G. W.H.R.B. DUCT RADIANT BURNER •Water tube – Natural circulation & Controlled • Water tube – Natural circulation boiler & •Fuel Gas & Low LHV Gas circulation Controlled Circulation •Low Emissions system •Supplementary fired & Fresh Air System • Hight fouling flue gas operated •Water Cooled & Uncooled burners • Cleaning system equipped

  12. Typical Project 1/6 P&ID e Hook-up Hook-up strumentali P&ID – Dettaglio rampa gas

  13. Typical project 2/6 Civil & Structures Vista in pianta e Vista 3D Rendering 3D

  14. Typical project 3/6 Electrical drawings Schema elettrico Lay-out quadro elettrico

  15. Typical project 4/6 Piping 3D e Sketch 3D Piping di distribuzione Sketch isometrici

  16. Typical project 5/6 Piping Stress Analysis Complete stress analysis competencies.

  17. Un progetto 6/6 Standard documentation • QCP • Engineering Schedule • Overall project schedule • P&ID • Piping 3D • Isometric sketch • Lay-out • MTO • Piping Stress Analysis • IO list, alarm list, SD Matrix • Hook up • Electrical and control schematics • Commissining and performance procedures • Technical dossier as per CE requirements • O&M manual • Plant Declaration of Conformity

  18. Revamping We have strong competencies on thermal stations and existing boilers revamping and retrofits. Thanks to our retrofits we are able to increase: + Efficiency + Production + Enviromental sustainability We are able to Re – Certify complete systems after revamping is performed

  19. BMS We engineer, build and commission: • BMS (Burner Management System) for safe operation of burners • BCS (Boiler Control System) for boiler automatic control sequences UNI/TS 11325-3 Termotecnica Industriale has extended experience on • Permanently manned boiler stations 24 h • Unmanned operation up to 24 h • Unmanned operation up to 72 h 72 h

  20. Steam Boiler EPC Plant Reference 1 - Thermal power = 15,5 MWt FCA Group S.p.A - - steam flow = 25.000 kg/h Stabilimento Maserati - Rated pressure = 30 bar Grugliasco - TO - Rated temperature = + 238 °C Scope of supply: Basic and Detailed Engineering, Civil Works, Mechanical, Electrical, I&C works, Commissioning and test. Centrale Termica Centrale Termica Dettaglio caldaia Piping 3D

  21. EPC project fuel gas preheating system Reference 2 STO.G.IT. S.p.a. - Heat input = 15 MWt x 2 = 30 MWt Bordolano - CR - Rated flow = 500 m3/h - Rated pressure = 6 bar Scope of supply: basic and detailed engineering, civil, mechanical, electrical, I&C works, commissining and acceptance tests. Centrale Termica Piping 3D Centrale Termica Vista in pianta

  22. Reference 3 Matrìca S.p.a. Porto Torres - SS EPC boiler house Heat Input = 19 MWt • Diathermic oil system - Rated Flow = 410 mc/h - Rated Pressure = 12 bar - Rated Temperature = + 350 °C • Saturated steam system - Rated Flow = 13 ton/h - Rated Pressure = 10 bar - Rated Temperature = + 184 °C • Hot water system - Rated flow = 470 mc/h - Rated pressure = 5 bar - rated Temperature = + 85 °C Scopo of supply : EPC project with mechanical, electrical, civil engineering, construction, including commissioning and test. Centrale Termica Piping 3D

  23. EPC Chilled Water production and distribution plant: Reference 3 - Thermal Power = 3,2 MWt Matrìca S.p.a. - Rated Flow = 500 mc/h Porto Torres - SS - Design Pressure = 6 bar - Design Temperature = - 10 °C Scope of supply: Scopo di fornitura: Progettazione EPC project wth mechanical, process, electrical, I&C and civil, including commissining and tests. Chilled water production plant Chilled water tanks Piping 3D Rendering 3D

  24. Demi Plant: Reference 3 - Design flow = 20 mc/h Matrìca S.p.a. - Design pressure = 7 bar Porto Torres - SS - Design temperature = + 60 °C Compressed air EPC project: - Rated flow = 5000 kg/h (su due linee) - Rated Pressure = 30 bar - Rated Temperature = + 110 °C Impianto produzione EPC Project Demi Station aria compressa Vista 3D Vista 3D

  25. EPC Boiler Station Reference 4 - Boiler Thermal Power = 14,9 MWt x 2 = 29,8 MWt E.On S.p.a. - Rated flow = 34 ton/h Ostiglia - MN - Rated Pressure = 22 bar - Rated temperature = + 375 °C Scope of supply: EPC project includign mechanical, electrical, civil engineering, construction and commissioning. Camino Centrale Termica Progetto e Realizzazione Layout e P&ID

  26. Diathermic oil station Reference 5 - Heat Input = 18,6 MW Di Mauro S.p.a. - Rated temeprature = +260°C Officine Grafiche Scope of supply: Cava de’ Tirreni - SA Engineering installation and supply of: Air compression station Tank system HVAC Process lines Centrale Termica Pianta e Prospetto Linee di distribuzione Dettaglio

  27. Mechanical installation works biomass power plants Reference 6 - Rated Electrical Power = 9 MWe Ferrero S.p.a. - Piping in A106 ed Aisi316 = kg 85.000 Balvano - PZ - Steel Structures = kg 75.000 - Coibentazioni = mq 4.000 Ferrero – Stabilimento di Balvano (PZ) Impianto di cogenerazione

  28. EPC boiler and distribution station Reference 7 - Rated Thermal Power = 10,5 MWt x 2 = 21 MWt Trenitalia S.p.a. - Rated Pressure = 8 bar Foligno - PG - Rated Temperature = + 155 °C Scope of supply: EPC Project for the new thermal power station including distribution piping, rack, control system. Trenitalia – Foligno (PG) Vista 3D e dettagli realizzazione

  29. EPC Project Thermal Power Station and Distribution System Reference 8 - Heat Input = 14,9 MWt E.On S.p.a . - Rated Flow = 17,4 t/h Tavazzano - LO - Rated Pressure = 22 bar - Rated Temperature = + 425 °C Scopo of suply: EPC Project including mechanical, electrical, civil works, commissining and tests. Centrale termica – Tavazzano (LO) Steam Generator

  30. Biomass SH boiler plant Reference 9 Steam Flow = 65,00 ton/h Neoterm S.r.L . - Rated pressure = 65 bar VARESE - Rated Temperature = + 470 °C Scope of supply: EPC project for the complete system (mechanical, electrical, process, I&C) ed elettrostrumentale Finale Emilia (MO) Vista

Recommend


More recommend