MOBILITY35 AESTHETICS Aesthetics Working Group 3 March 29, 2016 Mobility35 Aesthetics 03/29/2016
What we heard regarding three themes Art: Nature: Connectivity: Blank canvas Authentic natural Improve east/west option with murals elements pedestrian later OR Simple walls connections Walls & periodic Terracing Safe and well art – panel (1) Creek/stream marked designed by artist themes to be repeated Local identity Nature as a buffer along the corridor defined by between roadway or several smaller concrete panels and bike/ped repeating designs Tie-in as applicable Maximize Trellis or panels with downtown landscaped areas with art on wayfinding east/west Sturdy/native crossings plantings Mobility35 Aesthetics 03/29/2016 2
What we heard regarding green infrastructure and sustainability Working Group would like to see: Use of native plantings which require minimal or no irrigation Wildflowers and no-mow areas Planting choices that support pollinators and wildlife Bio-swales Lighter colored concrete to reduce heat island effect LED lighting which minimizes energy usage Mobility35 Aesthetics 03/29/2016 3
Aesthetics Working Group schedule and goals We are here Meeting 1 Meeting 2 Meeting 3 December 1, 2015 February 2, 2016 March 29, 2016 Project overview Develop up to Develop up to • • • Corridor assets three potential three draft • Themes aesthetic themes aesthetic concepts • Public input needed! Second Take online survey online survey Dec. 3, 2015 Spring to Jan. 15, 2016 2016 Next steps Meeting 5 Meeting 4 Fall 2016 Design team develops: Summer 2016 Summer 2016 Final working group • Review final draft Determine • • summary report of refined preferred draft Final aesthetic • preferred concept concept guideline document Mobility35 Aesthetics 03/29/2016 4
Revisit elements that could have substantial impact East/west crossings Shared use path environment Landscape design (hard/soft) and performance* Bridges as viewed from the mainlanes* Wayfinding* Lighting* Vertical walls * Elements added by the working group during Meeting #2 Mobility35 Aesthetics 03/29/2016 5
Connectivity – east/west cross street under I-35 mainlanes The artist renderings shown are conceptual in nature and are for discussion purposes only. Final alignments and construction elements may vary. Actual project details will be subject to design constraints and funding availability. Mobility35 Aesthetics 03/29/2016 6
Connectivity – shared use path environment The artist renderings shown are conceptual in nature and are for discussion purposes only. Final alignments and construction elements may vary. Actual project details will be subject to design constraints and funding availability. Mobility35 Aesthetics 03/29/2016 7
Connectivity – east/west cross street over I-35 mainlanes The artist renderings shown are conceptual in nature and are for discussion purposes only. Final alignments and construction elements may vary. Actual project details will be subject to design constraints and funding availability. Mobility35 Aesthetics 03/29/2016 8
Connectivity – I-35 mainlanes under east/west cross street The artist renderings shown are conceptual in nature and are for discussion purposes only. Final alignments and construction elements may vary. Actual project details will be subject to design constraints and funding availability. Mobility35 Aesthetics 03/29/2016 9
Connectivity theme – considerations Over-signage could create a cluttered look and adjacent wayfinding such as the city of Austin’s program must be considered Location-specific items such as unique signage could be more costly to fabricate and replace over time Landscaping along corridor requires partnership with city of Austin for maintenance Mobility35 Aesthetics 03/29/2016 10
Connectivity – theme boards The artist renderings shown are conceptual in nature and are for discussion purposes only. Final alignments and construction elements may vary. Actual project details will be subject to design constraints and funding availability. Mobility35 Aesthetics 03/29/2016 11
Nature – east/west cross street under I-35 mainlanes The artist renderings shown are conceptual in nature and are for discussion purposes only. Final alignments and construction elements may vary. Actual project details will be subject to design constraints and funding availability. Mobility35 Aesthetics 03/29/2016 12
Nature – shared use path environment The artist renderings shown are conceptual in nature and are for discussion purposes only. Final alignments and construction elements may vary. Actual project details will be subject to design constraints and funding availability. Mobility35 Aesthetics 03/29/2016 13
Nature – east/west cross street over I-35 mainlanes The artist renderings shown are conceptual in nature and are for discussion purposes only. Final alignments and construction elements may vary. Actual project details will be subject to design constraints and funding availability. Mobility35 Aesthetics 03/29/2016 14
Nature – I-35 mainlanes under east/west cross street The artist renderings shown are conceptual in nature and are for discussion purposes only. Final alignments and construction elements may vary. Actual project details will be subject to design constraints and funding availability. Mobility35 Aesthetics 03/29/2016 15
Nature theme – considerations Landscaping along corridor requires partnership with city of Austin for maintenance Constrained urban environment and space provide limited opportunities for planting and maintaining robust natural features Water usage may be a concern for city under water restrictions Mobility35 Aesthetics 03/29/2016 16
Nature – theme boards The artist renderings shown are conceptual in nature and are for discussion purposes only. Final alignments and construction elements may vary. Actual project details will be subject to design constraints and funding availability. Mobility35 Aesthetics 03/29/2016 17
Art – east/west cross street under I-35 mainlanes The artist renderings shown are conceptual in nature and are for discussion purposes only. Final alignments and construction elements may vary. Actual project details will be subject to design constraints and funding availability. Mobility35 Aesthetics 03/29/2016 18
Art – shared use path environment The artist renderings shown are conceptual in nature and are for discussion purposes only. Final alignments and construction elements may vary. Actual project details will be subject to design constraints and funding availability. Mobility35 Aesthetics 03/29/2016 19
Art – east/west cross street over I-35 mainlanes The artist renderings shown are conceptual in nature and are for discussion purposes only. Final alignments and construction elements may vary. Actual project details will be subject to design constraints and funding availability. Mobility35 Aesthetics 03/29/2016 20
Art – I-35 mainlanes under east/west cross street The artist renderings shown are conceptual in nature and are for discussion purposes only. Final alignments and construction elements may vary. Actual project details will be subject to design constraints and funding availability. Mobility35 Aesthetics 03/29/2016 21
Art theme – considerations Artists/partners need to be identified to create, install, and fund pieces Timing of art installations needs to coincide with construction to avoid providing blank pallet for graffiti Art along the corridor requires partnership with city of Austin for maintenance Graffiti/defacement of art may trigger painting over with minimal opportunity for artist to repair Artworks may only be installed where they are not a distraction to drivers Mobility35 Aesthetics 03/29/2016 22
Art – theme boards The artist renderings shown are conceptual in nature and are for discussion purposes only. Final alignments and construction elements may vary. Actual project details will be subject to design constraints and funding availability. Mobility35 Aesthetics 03/29/2016 23
Aesthetics Working Group schedule and goals We are here Meeting 1 Meeting 2 Meeting 3 December 1, 2015 February 2, 2016 March 29, 2016 Project overview Develop up to Develop up to • • • Corridor assets three potential three draft • Themes aesthetic themes aesthetic concepts • Public input needed! Second Take online survey online survey Dec. 3, 2015 Spring to Jan. 15, 2016 2016 Next steps Meeting 5 Meeting 4 Fall 2016 Design team develops: Summer 2016 Summer 2016 Final working group • Review final draft Determine • • summary report of refined preferred draft Final aesthetic • preferred concept concept guideline document Mobility35 Aesthetics 03/29/2016 24
Next steps Internal finalization and refinement of up to 3 concepts based on your input received tonight Public outreach survey will open spring 2016, includes 3 community outreach opportunities Aesthetics Working Group 4 meeting date: June 28, June 29, July 6 or July 7 Feedback on tonight (comment forms) Mobility35 Aesthetics 03/29/2016 25