minotti storefront
play

Minotti Storefront 200 Stuart Street Landmarks Presentation August - PowerPoint PPT Presentation

Minotti Storefront 200 Stuart Street Landmarks Presentation August 11, 2020 Project Location - 200 Stuart St Area of Work AREAS OF E l Boylston St i o Plz t S t k r a P STOREFRONT B Arlington St r o WORK Providence St a d


  1. Minotti Storefront 200 Stuart Street Landmarks Presentation August 11, 2020

  2. Project Location - 200 Stuart St Area of Work AREAS OF E l Boylston St i o Plz t S t k r a P STOREFRONT B Arlington St r o WORK Providence St a d w a y NEW TOWER UNDER CONSTRUCTION Tremont St Stuart St 212 STUART ST v A s e m Warrenton St a J t S S t t Charles St South u m w a h S B e r k e l e y S t S t n o t m d e i P Broadway t S r e s t e h c n i W Columbus Av C h Edgerly Pl u r Eliot Norton c h Park S t Jefferson St Dingley Pl Melrose St Stanhope St Isabella St Oak St West Fayette St Shawmut Av Tremont St Cortes St B a y S t M a r g i n a l R d Massachusetts Trnpk Massachusetts Trnpk 300 Feet ´ Herald St Bay Village Historic District St Charles St Cazenove St S t r Paul Pl e d l n 0 100 200 a h C This map is intended for informational puposes only. 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 2

  3. Project Location - 200 Stuart St Area of Work - Zoomed In Arlington St roadway AREAS OF STOREFRONT WORK t S t r a u NEW TOWER UNDER t S CONSTRUCTION 212 STUART ST W a r r e n t o n S Shawmut St Charles St South t Piedmont St Broadway Winchester St Church Edger Eliot Norton 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 3

  4. Project Location - 200 Stuart St Area of Work - 2006 Addition Site Plan AREAS OF STOREFRONT WORK 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 4

  5. Proposed Design Axon View EXISTING STAIIRWELL NEW WALL MOUNTED LIGHT FIXTURE E-2 MTL-01 PANELS INSTALLED AS A RAINSCREEN SYSTEM WITH ATTACHMENT CLIPS PAINT EXISTING EGRESS DOOR, PATCH SURROUNDING CONCRETE IMMEDIATELY ADJACENT TO DOOR MTL-03 PANELS ON STEEL SUPPORT STRUCTURE NEW GLASS STOREFRONT MATCH ADJACENT EXISTING SYSTEM EXISTING CONCRET PILLAR CLAD IN MTL-01 PANELS NEW GLASS ENTRY DOOR, KAWNEER AA250, BLACK, PROVIDE CONCEALED OVERHEAD CLOSER AND FULL HEIGHT LADDER PULLS EXISTING CONCRET PILLAR TO REMAIN LED EMBEDDED ACRYLIC LETTERS, TYP. MTL-01 PANEL SEAM, TYP. MTL-01 PANELS INSTALLED AS A RAINSCREEN SYSTEM WITH ATTACHMENT CLIPS MTL-01 PANEL SEAM, TYP. EXISTING CURTAIN WALL MULLIONS, PAINT BLACK ON ALL 4 SIDES, TYP. LED EMBEDDED ACRYLIC LETTERS, TYP. MTL-01 PANELS BENT AT CORNICE AND SLOPED BACK TOWARDS EXISTING ROOF MTL-02 SLATS PROVIDE UV STABLE WEATHER BARRIER BEHIND MTL-02 SLATS AT UNDERSIDE OF CANOPY PROVIDE UV STABLE WEATHER BARRIER BEHIND NEW GLASS ENTRY DOOR KAWNEER AA250, BLACK PROVIDE CONCEALED OVERHEAD CLOSER AND CUSTOM CHROME PULL STOREFRONT AXON 4 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 5

  6. Existing Conditions Photos of Existing Retail Storefront View from Stuart Street of Exisitng Retail Storefront (Minotti Side) View from Stuart Street of Existing Retail Storefront (Future Tenant Side) a a y y Stuart St Stuart St Shawmut St Shawmut St Cha Cha S t S t n t n t o o m m d d e e P i P i Broadway Broadway Winchester St Winchester St 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 6

  7. Existing Conditions Photos of Existing Retail Storefront Elevation View from Stuart Street of Exisitng Retail Storefront (Minotti Side) Elevation View from Stuart Street of Existing Retail Storefront (Future Tenant Side) a a y y Stuart St Stuart St Shawmut St Shawmut St Cha Cha S t S t n t n t o o m m d d e e P i P i Broadway Broadway Winchester St Winchester St 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 7

  8. Existing Conditions Photos of Existing Retail Storefront Detail View of Existing Storefront (Minoti Side) Detail View of Existing Storefront Entry Door (Minoti Side) a a y y Stuart St Stuart St Shawmut St Shawmut St Cha Cha S t S t n t n t o o m m d d e e P i P i Broadway Broadway Winchester St Winchester St 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 8

  9. Existing Conditions Area of Precast to be re- moved and replaced with Photos of Existing Retail Storefront matching storefront glass Detail View of Existing Storefront (Future Tenant Side) Detail View of Existing Storefront (Future Tenant Side) a a y y Stuart St Stuart St Shawmut St Shawmut St Cha Cha S t S t n t n t o o m m d d e e P i P i Broadway Broadway Winchester St Winchester St 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 9

  10. Existing Conditions Photos of Adjacent Storefront Detail View of Adjacent Hotel Entry Detail View of Adjacent Retail Space (Restaurant) a a y y Stuart St Stuart St Shawmut St Shawmut St Cha Cha S t S t n t n t o o m m d d e e P i P i Broadway Broadway Winchester St Winchester St 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 10

  11. Existing Conditions Photos of Adjacent Project Site View of Existing Construction Site for New Residential Tower (212 Stuart View of Existing Construction Site for New Residential Tower (212 Stuart Street) Street) a a y y Stuart St Stuart St Shawmut St Shawmut St Cha Cha S t S t n t n t o o m m d d e e P i P i Broadway Broadway Winchester St Winchester St 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 11

  12. Existing Conditions Rendering of Adjacent Buildling Under Construction PROJECT SITE 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 12

  13. Existing Conditions Photos of Existing Graffjti View of Existing Graffjti on Garage Egress (To be preserved and lit) Detail View of Existing Graffjti on Garage Egress (To be preserved and lit) a a y y Stuart St Stuart St Shawmut St Shawmut St Cha Cha S t S t n t n t o o m m d d e e P i P i Broadway Broadway Winchester St Winchester St 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 13

  14. Proposed Design Rendering of Minotti Storefront ALUCOBOND BLACK METAL PANELS WOOD LOOK ALUMINUM SLATS EXISTING CURTAIN WALL MULLIONS PAINTED BLACK TO MATCH 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 14

  15. Proposed Design Rendering of Minotti Storefront ALUCOBOND BLACK METAL PANELS WOOD LOOK ALUMINUM SLATS EXISTING CURTAIN WALL MULLIONS PAINTED BLACK TO MATCH 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 15

  16. Proposed Design Rendering of Future Tenant Storefront ALUCOBOND BLACK METAL PANELS BRONZE COLORED EXPANDED METAL MESH (TO COORDINATE WITH ALUMINUM SLATS) 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 16

  17. Proposed Design Signage Types LARGE LED SIGN SMALL LED SIGN 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 17

  18. Proposed Design Axon View EXISTING STAIIRWELL NEW WALL MOUNTED LIGHT FIXTURE E-2 MTL-01 PANELS INSTALLED AS A RAINSCREEN SYSTEM WITH ATTACHMENT CLIPS PAINT EXISTING EGRESS DOOR, PATCH SURROUNDING CONCRETE IMMEDIATELY ADJACENT TO DOOR MTL-03 PANELS ON STEEL SUPPORT STRUCTURE NEW GLASS STOREFRONT MATCH ADJACENT EXISTING SYSTEM EXISTING CONCRET PILLAR CLAD IN MTL-01 PANELS NEW GLASS ENTRY DOOR, KAWNEER AA250, BLACK, PROVIDE CONCEALED OVERHEAD CLOSER AND FULL HEIGHT LADDER PULLS EXISTING CONCRET PILLAR TO REMAIN LED EMBEDDED ACRYLIC LETTERS, TYP. MTL-01 PANEL SEAM, TYP. MTL-01 PANELS INSTALLED AS A RAINSCREEN SYSTEM WITH ATTACHMENT CLIPS MTL-01 PANEL SEAM, TYP. EXISTING CURTAIN WALL MULLIONS, PAINT BLACK ON ALL 4 SIDES, TYP. LED EMBEDDED ACRYLIC LETTERS, TYP. MTL-01 PANELS BENT AT CORNICE AND SLOPED BACK TOWARDS EXISTING ROOF MTL-02 SLATS PROVIDE UV STABLE WEATHER BARRIER BEHIND MTL-02 SLATS AT UNDERSIDE OF CANOPY PROVIDE UV STABLE WEATHER BARRIER BEHIND NEW GLASS ENTRY DOOR KAWNEER AA250, BLACK PROVIDE CONCEALED OVERHEAD CLOSER AND CUSTOM CHROME PULL STOREFRONT AXON 4 200 Stuart Street — Landmarks Presentation MERGE ARCHITECTS 18

Recommend


More recommend