Mike Elster GA EPD
Initial Hazardous Waste Generator Hazardous Waste Transporter / Permitted TSDF Solid Waste Facility (Rejected Load) Solid Waste Facility (Accepted Load) 2
June 20 th th – Initial waste load pickup June 27 th th – Second waste load pickup July 1 st st – Transportation and rejection of the hazardous waste load July 7, 2008 – Transportation and acceptance of the hazardous waste load 3
July 8 th Phone Call Summary: ◦ Discussion with Transporter/TSD representative: Confirmation that transporter picked up from three separate generators. Internal field-testing protocols were not followed at two of the three generators. Approximately 2400 gallons of wastewater mixed w/ listed hazardous waste shipped to solid waste facility. ◦ Fate of Hazardous waste load 4
Capacity Construction Secondary Containment 5
6
7
Ge Generato ator – Order issued w/ penalties Transpo sporte ter/T r/TSD SD – Order issued w/ penalties So Soli lid Waste Facil ility ity – Order issued w/ penalties Waste dis isposa posal l costs 8
Adequate Waste Determinations are Critical Know your Generator Status Promptly Notify When Situations Arise 9
Mike Elster, Unit Coordinator Treatment and Storage Unit Georgia EPD – Land Protection Branch Michael.elster@dnr.state.ga.us 404-657-8624 10