march 23 2017 new elementary school at thomas jefferson
play

MARCH 23, 2017 NEW ELEMENTARY SCHOOL AT THOMAS JEFFERSON MIDDLE - PowerPoint PPT Presentation

MARCH 23, 2017 NEW ELEMENTARY SCHOOL AT THOMAS JEFFERSON MIDDLE SCHOOL Urban Forestry Commission Meeting 15 MARCH 1 BLPC - PFRC Overall Existing site plan Overall Final site plan 15 MARCH SITE PLAN 2 BLPC - PFRC Existing Condition


  1. MARCH 23, 2017 NEW ELEMENTARY SCHOOL AT THOMAS JEFFERSON MIDDLE SCHOOL Urban Forestry Commission Meeting 15 MARCH 1 BLPC - PFRC

  2. Overall Existing site plan Overall Final site plan 15 MARCH SITE PLAN 2 BLPC - PFRC

  3. Existing Condition Proposed Condition 38.6% pervious 34.3% pervious 3.7% semi 8.8% semi 57.7% impervious 56.9% impervious 15 MARCH Pervious v/s Semi-Pervious v/s Impervious 3 BLPC - PFRC

  4. Existing Condition Proposed Condition 38.6% pervious 34.3% pervious 3.7% semi 8.8% semi 57.7% impervious 56.9% impervious 15 MARCH Pervious v/s Semi-Pervious v/s Impervious 3 BLPC - PFRC

  5. Existing Condition Proposed Condition 38.6% pervious 34.3% pervious 3.7% semi 8.8% semi 57.7% impervious 56.9% impervious 15 MARCH Pervious v/s Semi-Pervious v/s Impervious 3 BLPC - PFRC

  6. 157: Trees scheduled for demolition 187: Replacement trees required 29: Trees required along streetscape 158: Trees throughout rest of site 187 246: Total tree replacements being installed 59 more than required 89 more than exist 15 MARCH Tree replacement calculations 4 BLPC - PFRC

  7. Along SOG North of theater Two permanent wells already drilled down to 560 feet with conductivity results as expected. 70 more wells will be drilled during construction when the site is fenced off and in full site construction mode. This is one of the largest energy saving aspects of the project. This also prevents the need for noisy exterior cooling towers, which often draw complaints in the summer Example of construction signage 15 MARCH Geothermal well drilling 6 BLPC - PFRC

  8. Aerial View: Final Design 15 MARCH 7 BLPC - PFRC

  9. Aerial View: Final Design 15 MARCH 8 BLPC - PFRC

  10. Aerial View: Final Design 15 MARCH 9 BLPC - PFRC

  11. Aerial View: Final Design 15 MARCH 10 BLPC - PFRC

  12. Aerial View: Final Design 15 MARCH 11 BLPC - PFRC

  13. Aerial View: Final Design 15 MARCH 12 BLPC - PFRC

  14. 15 MARCH Perspective view of school entry: Final Design 13 BLPC - PFRC

  15. 15 MARCH Perspective view of building from Arbors parking lot: Final Design 14 BLPC - PFRC

  16. 15 MARCH Perspective view of site entry: Final Design 15 BLPC - PFRC

  17. 15 MARCH Perspective view of playfield at gym: Final Design 16 BLPC - PFRC

  18. 15 MARCH Perspective view of gym from MS: Final Design 18 BLPC - PFRC

  19. 15 MARCH Perspective view of ES courtyard: Final Design 19 BLPC - PFRC

  20. 15 MARCH Perspective view of ES from bus loop plaza: Final Design 20 BLPC - PFRC

  21. 15 MARCH Perspective view of MS play areas: Final Design 21 BLPC - PFRC

  22. 15 MARCH Perspective view of MS play areas looking north: Final Design 22 BLPC - PFRC

  23. 15 MARCH Perspective view of ES from MS entry: Final Design 23 BLPC - PFRC

  24. 15 MARCH Perspective view of north elevation at bus drive: Final Design 24 BLPC - PFRC

  25. 15 MARCH Perspective view of west elevation: Final Design 25 BLPC - PFRC

  26. ARLINGTON PUBLIC SCHOOLS NEW ELEMENTARY SCHOOL 125 South Old Glebe Rd Arlington, VA 22204 Client Project Number 60FY16 VMDO Project Number 1152 Checked By T. Shallenberger Drawn By P. Price DRAWING NOT FOR CONSTRUCTION C:\USERS\WSS\GOOGLE DRIVE\1-PROJECTS\ARLINGTON COUNTY SCHOOL\CAD\03 SHEETS\24X36\L4.02 ARLINGTON COUNTY PLANTING DETAILS & NOTES.DWG ISSUES AND REVISIONS NO. SUBMITTAL DATE USE PERMIT RESUBMISSION 03.06.2017 PLANTING NOTES 1. CONTRACTOR SHALL VERIFY PLANT QUANTITIES SHOWN ON PLAN WITH TOTALS 5. THE LANDSCAPE ARCHITECT IS THE OWNER'S REPRESENTATIVE AND SHALL BE 10. ALL PLANTING BED AREAS SHALL BE COVERED WITH A 3" MINIMUM LAYER OF 17. PLANT SIZES, QUANTITIES, AND SPECIES WILL BE CHECKED BY MUNICIPALITY IN PLANTING SCHEDULE. NOTIFY LANDSCAPE ARCHITECT OF ANY THE APPROVING AUTHORITY FOR INFORMATION PROVIDED WITHIN THESE PLANS MEDIUM TEXTURED SHREDDED HARDWOOD MULCH UNLESS OTHERWISE NOTED. INSPECTION FOR COMPLIANCE WITH PLANT SCHEDULE AS APPROVED BY THE DISCREPANCIES PRIOR TO FINAL BIDDING. UNITS PRICES BE SUBMITTED AS PART AND SPECIFICATIONS. MUNICIPALITY. CONTRACTOR SHALL BE HELD RESPONSIBLE FOR DELAY IN OF FINAL BID. 11. ALL SUBSTITUTIONS OF PLANTS SHALL BE REQUESTED IN WRITING TO THE ISSUANCE OF CERTIFICATE OF OCCUPANCY BY THE MUNICIPALITY RESULTING 6. ALL PLANTS, TOPSOIL, MULCH, FERTILIZERS, SOIL AMENDMENTS, PLANTING LANDSCAPE ARCHITECT AND APPROVED IN WRITING BY THE OWNER OR THE FROM UNAUTHORIZED SUBSTITUTIONS OR DOWNSIZING. 2. ALL PLANTS SHALL BE GUARANTEED FOR ONE (1) FULL YEAR AND SHALL BE IN A SUPPLIES, AND METHODS SHALL BE SUBJECT TO LANDSCAPE ARCHITECTS OWNER'S REPRESENTATIVE. HEALTHY GROWING CONDITION. PLANT MATERIALS WHICH DO NOT FULFILL APPROVAL. REJECTED MATERIALS SHALL BE REMOVED FROM THE SITE WITHOUT 18. UPON COMPLETION OF LANDSCAPE INSTALLATION, THE LANDSCAPE THIS GUARANTY SHALL BE REPLACED AT NO COST TO THE OWNER. DELAY AT NO EXPENSE TO THE OWNER. 12. ALL PLANTING OPERATIONS SHALL BE UNDER THE SUPERVISION OF AN CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR WHO WILL VERIFY ARLINGTON COUNTY EXPERIENCED PLANTSMAN. REPLACEMENT SHALL BE GUARANTEED THROUGHOUT THE ORIGINAL COMPLETENESS, INCLUDING THE REPLACEMENT OF ALL DEAD PLANT MATERIAL, PLANTING DETAILS & GUARANTY PERIOD. PLANTS THAT DIE SHALL BE REPLACED IMMEDIATELY. 7. CONTRACTOR SHALL LAYOUT AND MARK LOCATION FOR ALL PLANTS, AND AND SCHEDULE A FINAL INSPECTION FOR ACCEPTANCE BY OWNER. IMPROVEMENTS SHOWN AND SHALL REQUEST IN FIELD APPROVAL FROM 13. LANDSCAPE ARCHITECT RESERVES THE RIGHT TO SELECT PLANTS IN THE NOTES 3. CONTRACTOR IS RESPONSIBLE FOR WATERING, WEEDING, PEST CONTROL, AND LANDSCAPE ARCHITECT. NURSERY. 19. CONTRACTOR SHALL REMOVE TREE STAKING AT THE END OF THE ONE YEAR FERTILIZATION OF ALL PLANTS UNTIL, a.) UPON FINAL ACCEPTANCE IS ISSUED BY WARRANTEE PERIOD. LANDSCAPE ARCHITECT AND/OR OWNER, AND b.) THE CONTRACTOR 8. ALL PLANTS AND PLANTING METHODS SHALL CONFORM TO A.A.N. 14. FOR TREES BALLED IN WIRE BASKETS, CUT AND REMOVE TOP AND SIDES OF PROVIDES OWNER WRITTEN NOTIFICATION OF ALL MAINTENANCE NEEDS OF STANDARDS. BASKET AFTER INSTALLATION. ALL SCOPE ASSOCIATED WITH THE PLANTING PLAN(S) CONTRACT DOCUMENTS. 9. BEDS TO CONTAIN SHRUBS, PERENNIALS, ORNAMENTAL GRASSES, OR 15. LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT AND PLANTS AND L4.02 PERENNIALS SHALL BE TILLED TO A DEPTH OF 12" AND THE SOIL CONDITIONED MATERIALS THAT ARE IN AN UNHEALTHY OR UNSIGHTLY CONDITION, AS WELL AS 4. CONTRACTOR IS RESPONSIBLE FOR CONTACTING MISS UTILITY PRIOR TO THE 3/7/2017 11:11:57 AM BEGINNING OF CONSTRUCTION FOR LOCATION OF ALL UTILITY LINES. TREES BY ADDING 3" OF A U.S. COMPOSTING COUNCIL APPROVED COMPOST. PLANTS AND MATERIALS THAT DO NOT CONFORM TO A.A.N. STANDARDS. SHALL BE LOCATED A MINIMUM OF FIVE (5) FEET FROM SEWER/WATER 16. SOIL SHALL BE FREE OR ALL WEEDS AND ROCKS GREATER THAN 1" IN DIAMETER. CONNECTIONS. NOTIFY LANDSCAPE ARCHITECT OF CONFLICTS.

  27. Aerial View: Final Design 15 MARCH 7 BLPC - PFRC

  28. 15 MARCH Perspective view of school entry: Final Design 13 BLPC - PFRC

  29. Aerial View: Final Design 15 MARCH 7 BLPC - PFRC

  30. 15 MARCH Perspective view of school entry: Final Design 13 BLPC - PFRC

Recommend


More recommend