Lake Placid CSD Capital Project
Why a Capital Project? • Maintain the Infrastructure of our Facilities • Improve Safety & Security for Students and Staff • Provide Modest Enhancements to improve programs & services 2015 BCS - High School | Mosaic Associates Architects
Infrastructure
Lake Placid Elementary School
Replace original 1975 windows and doors 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Reconstruct exterior masonry columns near Cafeteria 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Replace elevator cab, reuse existing shaft 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Reconstruct asphalt paving from Boiler Room to parking lot (regrade) 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Photo of Picture or existing sign drawing of a digital sign Reconstruct loading dock columns and main beam/concrete slab 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Photo of UV Add DDC control to all UVs 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Upgrade main electrical service 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Roofing – overlay existing (approx. 30,000 sf) 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Exterior lighting – building mounted, full perimeter 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Replace original air handler 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Lake Placid Middle/High School
Replace auditorium air handling units 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace remaining 1973 unit ventilators 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Convert building from steam to HW. Upgrade heating system – building wide. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Add ventilation to rooms 316, 316A, 314, 305, and Rm 211 (SED required) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace domestic HW boiler 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct existing roofing, skylights, and roof access hatch over original 1920’s portion of building 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct concrete retaining wall at School Street and adjacent to Olympic Oval 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace 1970’s wing windows/insulation 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Upgrade distribution (hallway panels 6ft AFF) and main distribution in basement 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct/overlay exterior stairs (front of building – south side) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace elevator cab (bay state), reuse existing shaft 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct stairs from Cummings Road to front of building (North Side) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct ramp at 1970 entrance, add canopy & walls to enclose 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct concrete retaining/fencing adjacent to south entrance & loading dock 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct sloping retaining wall under 1970 addition 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace original exhaust fans and roof vents 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Roofing- re seam/overlay existing (approx. 34,400 sf) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Exterior lighting – building mounted, full perimeter 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Resurface track at Horse Show Grounds. 2016 Pre-Referendum Study – Horse Show Grounds | Mosaic Associates Architects
Safety and Security
Lake Placid Elementary School
Provide security vestibule (add roof and wall at elevated walk) 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Provide impact resistant film on non-tempered doors/windows – building wide interior 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Provide bullet resistant film on first floor exterior glass 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Lake Placid Middle/High School
Provide security vestibule addition (rear) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide impact resistant film on non-tempered doors/windows – building wide interior 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide bullet resistant film on first floor exterior glass 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide aisle lighting for auditorium (SED required) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Replace railing at balcony 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide stairs at side of District Office 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Enhancements
Lake Placid Elementary School
Photo of existing sign Signage and landscaping 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Original 1975 Building – Reconstruct restrooms, both floors 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Floor Plan Glass enclosure, vestibule to loop entrance 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Main office reconstruction 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Lake Placid Middle/High School
Build storage under 1975 addition 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Add road access to front of building (part of #16) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Gym storage addition 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
L ake Plac id Middle / High S c ho o l Signage and landscaping (location to be determined) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Seating (includes ADA requirements) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Ceilings/lighting 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Wings/storage area below 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Sound system 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide (2) tennis courts at Shipman Site. 2016 Pre-Referendum Study – Shipman Youth Center | Mosaic Associates Architects
Finances 49 Separate Items ≈ $21 Million NYS Building Aid of 30% ≈ $6 Million Total Cost after Building Aid ≈ $15 Million Annual Cost of Bonded Debt ≈ $1 Million Total Change to the Annual Budget After 2001 Bond Payoff ≈ $ 0 2015 BCS - High School | Mosaic Associates Architects
2015 BCS - High School | Mosaic Associates Architects
We Want Your …. 2015 BCS - High School | Mosaic Associates Architects
Questions ? 2015 BCS - High School | Mosaic Associates Architects