  1. Lake Placid CSD Capital Project

  2. Why a Capital Project? • Maintain the Infrastructure of our Facilities • Improve Safety & Security for Students and Staff • Provide Modest Enhancements to improve programs & services 2015 BCS - High School | Mosaic Associates Architects

  3. Infrastructure

  4. Lake Placid Elementary School

  5. Replace original 1975 windows and doors 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  6. Reconstruct exterior masonry columns near Cafeteria 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  7. Replace elevator cab, reuse existing shaft 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  8. Reconstruct asphalt paving from Boiler Room to parking lot (regrade) 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  9. Photo of Picture or existing sign drawing of a digital sign Reconstruct loading dock columns and main beam/concrete slab 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  10. Photo of UV Add DDC control to all UVs 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  11. Upgrade main electrical service 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  12. Roofing – overlay existing (approx. 30,000 sf) 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  13. Exterior lighting – building mounted, full perimeter 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  14. Replace original air handler 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  15. Lake Placid Middle/High School

  16. Replace auditorium air handling units 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  17. Replace remaining 1973 unit ventilators 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  18. Convert building from steam to HW. Upgrade heating system – building wide. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  19. Add ventilation to rooms 316, 316A, 314, 305, and Rm 211 (SED required) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  20. Replace domestic HW boiler 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  21. Reconstruct existing roofing, skylights, and roof access hatch over original 1920’s portion of building 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  22. Reconstruct concrete retaining wall at School Street and adjacent to Olympic Oval 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  23. Replace 1970’s wing windows/insulation 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  24. Upgrade distribution (hallway panels 6ft AFF) and main distribution in basement 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  25. Reconstruct/overlay exterior stairs (front of building – south side) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  26. Replace elevator cab (bay state), reuse existing shaft 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  27. Reconstruct stairs from Cummings Road to front of building (North Side) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  28. Reconstruct ramp at 1970 entrance, add canopy & walls to enclose 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  29. Reconstruct concrete retaining/fencing adjacent to south entrance & loading dock 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  30. Reconstruct sloping retaining wall under 1970 addition 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  31. Replace original exhaust fans and roof vents 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  32. Roofing- re seam/overlay existing (approx. 34,400 sf) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  33. Exterior lighting – building mounted, full perimeter 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  34. Resurface track at Horse Show Grounds. 2016 Pre-Referendum Study – Horse Show Grounds | Mosaic Associates Architects

  35. Safety and Security

  36. Lake Placid Elementary School

  37. Provide security vestibule (add roof and wall at elevated walk) 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  38. Provide impact resistant film on non-tempered doors/windows – building wide interior 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  39. Provide bullet resistant film on first floor exterior glass 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  40. Lake Placid Middle/High School

  41. Provide security vestibule addition (rear) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  42. Provide impact resistant film on non-tempered doors/windows – building wide interior 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  43. Provide bullet resistant film on first floor exterior glass 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  44. Provide aisle lighting for auditorium (SED required) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  45. Auditorium - Replace railing at balcony 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  46. Provide stairs at side of District Office 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  47. Enhancements

  48. Lake Placid Elementary School

  49. Photo of existing sign Signage and landscaping 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  50. Original 1975 Building – Reconstruct restrooms, both floors 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  51. Floor Plan Glass enclosure, vestibule to loop entrance 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  52. Main office reconstruction 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  53. Lake Placid Middle/High School

  54. Build storage under 1975 addition 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  55. Add road access to front of building (part of #16) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  56. Gym storage addition 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  57. L ake Plac id Middle / High S c ho o l Signage and landscaping (location to be determined) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  58. Auditorium - Seating (includes ADA requirements) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  59. Auditorium - Ceilings/lighting 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  60. Auditorium - Wings/storage area below 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  61. Auditorium - Sound system 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  62. Provide (2) tennis courts at Shipman Site. 2016 Pre-Referendum Study – Shipman Youth Center | Mosaic Associates Architects

  63. Finances 49 Separate Items ≈ $21 Million NYS Building Aid of 30% ≈ $6 Million Total Cost after Building Aid ≈ $15 Million Annual Cost of Bonded Debt ≈ $1 Million Total Change to the Annual Budget After 2001 Bond Payoff ≈ $ 0 2015 BCS - High School | Mosaic Associates Architects

  64. 2015 BCS - High School | Mosaic Associates Architects

  65. We Want Your …. 2015 BCS - High School | Mosaic Associates Architects

  66. Questions ? 2015 BCS - High School | Mosaic Associates Architects