Kelly Park concept plan review 11.12.2019 Process program + - PowerPoint PPT Presentation

Kelly Park concept plan review 11.12.2019 Process program + design Engagement concept documents Engagement review Stakeholders Accessible Meaningful to everyone Easy to maintain Emphasis on flexibility and safety


  1. Kelly Park concept plan review 11.12.2019

  2. Process program + design Engagement concept documents

  3. Engagement review

  4. Stakeholders ✓ Accessible ✓ Meaningful to everyone ✓ Easy to maintain ✓ Emphasis on flexibility and safety ✓ Shelter is one of the most important components

  5. Themes: Budget Priorities Other (5%) Community event Activating and gathering amenities (10.5%) spaces (27%) Amenities for adults (14%) Playground Additional equipment and sidewalks, looping amenities for paths (20.5%) youth (23%)

  6. Community Themes: Overall Shade/Shelter 69 Variety of Seating Options 58 Sensory Play 35 Site Lighting 33 Climbing elements 31 Waste Management 27 Looping Walk 26 Signage + Wayfinding 23 Water Fountain 22 Swing play 21 Gaga ball 15 0 10 20 30 40 50 60 70 80

  7. Community Themes: Play Sensory play 35 Climb 31 Swing 21 Gaga ball 15 Nature Play 12 Bounce 11 Play mounds 8 Adventure play 8 Zip lines 5 Balance 5 Spin 5 Slide 4 Tunnels 2 Platforms 2 0 5 10 15 20 25 30 35 40

  8. Review of program elements

  9. Large Shelter

  10. 5-12 Main Structure

  11. 2-5 Main Structure + Nature Play Option

  12. Swings + Spinners

  13. Gaga Ball Pit

  14. Site Furniture

  15. K A N S A S S T B Program Legend: A. Existing buildings H B. Existing parking areas K C. Existing basketball court D. Enlarged building plaza E H J F I E. Large 30’x30’ shelter and M E R I D I A N S T plaza space F. 5-12 play area G G. 2-5 play area w/ nature play option H. Flexible multi-purpose D lawn I. Ornamental fence w/ integrated park sign I L L I N O I S S T C J. Dry drainage area/open A lawn w/ gaga ball K. School flagpole (existing) L. Primary walks M. Secondary connectors N. Additional shade trees A B W I S C O N S I N S T

  16. Program Legend: B K A N S A S S T A. Existing buildings J B. Existing parking areas C. Existing basketball court N K D. Enlarged building plaza w/ F E M tables, chairs, swings M E R I D I A N S T H E. Large 30’x30’ shelter and O I L L I N O I S S T plaza space G I F. 5-12 play area G. 2-5 play area w/ nature L play option + play mounds D H. Flexible multi-purpose O lawn C I. Ornamental fence, A columns and park sign J. Dry drainage area K. School flagpole (existing) L. Gaga ball pit M. Horseshoe pits A N. Benches B O. Additional shade trees W I S C O N S I N S T

  17. V i e w f r o m N W C o r n e r

  18. V i e w f r o m N o r t h

  19. V i e w f r o m N E C o r n e r

  20. V i e w f r o m E a s t

  21. V i e w i n t o C o n c o r d C e n t e r P l a z a

  22. V i e w f r o m C o n c o r d C e n t e r P l a z a

  23. V i e w f r o m C o n c o r d C e n t e r T u r n a r o u n d

  24. V i e w o f P l a y g r o u n d + G a g a B a l l P i t

  25. V i e w o f P l a y M o u n d s

  26. V i e w o f P l a y g r o u n d a n d S h e l t e r

  27. A e r i a l V i e w f r o m N o r t h

  28. A e r i a l V i e w f r o m N o r t h e a s t

  29. A e r i a l V i e w f r o m S o u t h w e s t

  30. Next steps

  31. Next steps • Incorporate feedback • Validate budget • Update/finalize concept plan + elements • Present final plan at next subcommittee meeting • Begin contracting for documentation • Documentation in Q1 of 2020 • Bidding/construction start in Q2 of 2020

  32. Program Legend: B K A N S A S S T A. Existing buildings J B. Existing parking areas C. Existing basketball court N K D. Enlarged building plaza w/ F E M tables, chairs, swings M E R I D I A N S T H E. Large 30’x30’ shelter and O I L L I N O I S S T plaza space G I F. 5-12 play area G. 2-5 play area w/ nature L play option + play mounds D H. Flexible multi-purpose O lawn C I. Ornamental fence, A columns and park sign J. Dry drainage area K. School flagpole (existing) L. Gaga ball pit M. Horseshoe pits A N. Benches B O. Additional shade trees W I S C O N S I N S T

  33. Kelly Park concept plan review 11.12.2019