July 26, 2011 Jerry Wray, Director Joe Rutherford, District Deputy Director
������������������ � Includes � Coshocton � Fairfield � Guernsey � Knox � Licking � Muskingum � Perry � 3,731 Lane Miles of roadway
���������������������������� ������ � Julie Gwinn, P.E. is the District Highway Management Administrator � Dave Slatzer, P.E. is the Planning and Engineering Administrator � Keith Geiger, P.E. is the District Construction Engineer
���������������������������� ������ � Michelle Croom is the Public Information Officer � Randy Comisford is the LPA Coordinator
������������������������������ D12, 1,775 D11, 3,275 D1, 3,288 4.2% 9.3% 7.7% D2, 3,271 7.7% D10, 3,940 8.6% D3 4,146 9.7% D9, 3,667 8.6% D4 4,011 9.4% D8, 3,469 8.1% D7, 4,031 D5, 3,731 9.5% D6, 4,218 8.7% 9.9%
������������������������������� ������ PER-374 mi. COS-463 mi. 10% 12.4% FAI-463 mi. Mus-675 mi. 12.4% 18.1% GUE-615 mi. Lic-726 mi. 16.5% 19.5% Kno-415 mi. 11.1%
���������������������� � FY 2010 – ODOT sold $2.093B in construction projects (ODOT and Local Let) – ARRA infusion � District 5 - $64.06M total; 3.1% of Statewide spending � 1157 projects sold Statewide � District 5 - 75 projects; 6.5% of Statewide total
���������������������� � FY 2011 – ODOT has sold, or will sell, $1.868B (ODOT and Local Let) � District 5 - $66.4M; 3.6% of Statewide totals � 940 projects sold Statewide � District 5 - 54 Projects; 5.7% of Statewide total
���������������������� � FY 2012 – ODOT is currently scheduled to sell $1.528B (ODOT and Local Let) � District 5 – Projected budget is $63.3M; 4.1% of Statewide spending � 685 projects Statewide � District 5 - 47 Projects; 6.7% of total Statewide
�������������� !! � District 5 has awarded or will award 47 projects � FRA 33 culvert replacement included � Current estimate is $77.8M � FRA 33 culvert replacement included
�������������� !! � Project breakdown by size � < $500k: 19 � $500k - $1M: 8 � $1M - $2.5M: 7 � $2.5M - $5M: 11 � >$5M: 2 � Allows for contractors of all sizes to bid on work
�������������� !! ���"�����#����"���$��%����� � Project breakdown by major work type � Roadway/resurfacing: 24 � Bridge: 12 � Safety (includes maintenance projects like guardrail, striping, etc.): 11 � Balanced to improve general pavement and bridge conditions
�������������� !! ���"����&�#����"���$��%����� � Project breakdown by major work type � Roadway/resurfacing: $50.7MM � Bridge: $7.7M � Safety: $19.4MM � Balanced to improve general pavement and bridge conditions
����������������� !! ���"�����#�������� FAI-3, 7.1% Maintenance-11 COS-1, 2.4% 26.2% GUE-5, 11.9% PER-4, KNO-4, 9.5% 9.5% LIC-9, 19% MUS-8, 19%
����������������� !! & #�������� Maintenance FAI $11.6M $4.4M COS $200k, .3% 16.1% 6.1% PER $4.9M GUE $7.5M 6.8% 10.5% KNO $4.6M 6.4% MUS $21.4M LIC $16.7M 29.7% 23.2%
� !!����"����������'������������ � SR 60 Bridge Replacement Project � Approx. 2 mi. south of Warsaw � Cost: $194,979 � Contractor: Bud’s, Inc. � Estimated start date: 6/1/11 � Estimated completion date: 9/30/11
����� !!����"������������(����� ������ � Pickerington/Violet Twp. Sidewalk Project � Cost: $279,991 � Contractor: Trucco Construction Co. � Estimated completion date: 8/31/11
����� !!����"������������(����� ������ � Fairfield & Perry County � SR 37 Resurfacing Project � From SR 664 to New Lexington � Cost: $2.571MM � Contractor: The Shelly Company � Estimated completion date: 10/15/11
����� !!����"������������(����� ������ � Fairfield & Licking County � IR 70 Resurfacing Project � From Franklin County to SR 158 � Nighttime Resurfacing � Cost: $8 MM � Start date: 7/11/11 � Estimated completion date: 10/31/11
�������"��������)�������������� � Cambridge US 22/40 � From 5 th St. to IR 77 � Cost: $3.5MM � Contractor: Shelly & Sands � Lighting and signal upgrades, decorative sidewalks, pavement resurfacing � Estimated start date: 5/1/11 � Estimated completion date: 10/31/11
�������"��������)�������������� � SR 285 Resurfacing � From Noble County to SR 265 and Old Washington to US 22 � Estimated Cost: $1.877MM � Estimated start date: 7/5/11 � Estimated completion date: 10/15/11
�������"��������)�������������� � SR 265 Resurfacing � From SR 147 in Belmont County, through Noble County to SR 285 � Estimated Cost: $1.993MM � Estimated start date: 7/5/11 � Estimated completion date: 10/15/11
����� !!����"�����������*������� � US 36 Resurfacing � From Upper Gilchrist Rd. to Coshocton County � Cost: $3.003M � Contractor: Kokosing Construction Co. � Estimated start date: June � Estimated completion date: 10/15/11
����� !!����"�����������*������� � “Heart of Ohio” Trail Phase 2 � From Updike Road to Bishop Road northeast of Centerburg � Cost: $481,786 � Contractor: Park Enterprise Construction Co. � Estimated start date: 5/1/11 � Estimated completion date: 10/15/11
����� !!����"�����������*������� � State Route 3 Bridge Repair � 2 miles north of Amity � Estimated Cost: $926k � One lane of traffic to be maintained � Estimated start date: 6/1/11 � Estimated completion date: 10/31/11
����� !!����"�����������*������� � State Route 95 Bridge Replacement � .31 miles north of Zolman Road � Cost: $985,544 � Contractor: Shelly & Sands � 70 day maximum closure � Detour via SR 97 and SR 13 � Estimated start date: 6/1/11 � Estimated completion date: 10/15/11
����� !!����"��������+��%��,������� � Village of Johnstown � SR 62/37 Intersection Improvements � Lengthen turn lanes, upgrade signals � Contractor: Complete General � Cost: $808k � Estimated start date: 6/15/11 � Estimated completion date: 10/15/11
����� !!����"��������+��%��,������� � Newark SR 16 � Improve Cedar St. interchange � Redeck 3 bridges � 10 day ramp closure � Estimated Cost: $2.195MM � Estimated start date: 6/15/11 � Estimated completion date: 9/30/12
����� !!����"��������+��%��,������� � Heath SR 79 from 30 th St. to Hopewell � Widen, resurface and install center median � Upgrade traffic signals � Estimated Cost: $4.115MM � Estimated start date: 6/15/11 � Estimated completion date: 10/31/12
�������"��������+��%��,������� � Resurface SR 13 from Waterworks Rd. to Utica � Estimated Cost: $3.847MM � Estimated start date: 8/28/11 � Estimated completion date: 10/31/11
�������"��������+��%��,-����(����� ������ � Resurface SR 37 from I-70 to Lancaster Corp. � Estimated Cost: $3.683MM � Estimated start date: 9/01/11 � Estimated completion date: 10/31/11
�������"�����������%��,��������� � Resurface SR 60 from Duncan Falls to SR 146 in Zanesville � Estimated Cost: $5.055MM � Estimated start date: 7/05/11 � Estimated completion date: 10/31/11
����� !!����"�����������%��,��� ������ � Resurface SR 60 (Maple Avenue) from Adair Ave. to Fairview Rd. � Estimated Cost: $3.926MM � Estimated start date: 8/01/11 � Estimated completion date: 10/31/11
�������"�����������%��,��������� � Resurface SR 146 from SR 586 to east corp. limit of Zanesville � Cost: $2.729MM � Contractor: The Shelly Company � Start date: 5/01/11 � Estimated completion date: 8/31/11