july 18 2018 colleen west business development asphalt is
play

July 18, 2018 Colleen West Business Development Asphalt is Made - PowerPoint PPT Presentation

July 18, 2018 Colleen West Business Development Asphalt is Made of 95% Rock & 5% Liquid Asphalt RAP & RAS Used in many States Liquid Asphalt From Suppliers (Conoco, Exon) isnt what it used to be Federal


  1. July 18, 2018 Colleen West – Business Development

  2. • Asphalt is Made of 95% Rock & 5% Liquid Asphalt • RAP & RAS Used in many States • Liquid Asphalt From Suppliers (Conoco, Exon) isn’t what it used to be • Federal Highway Administration Standards

  3. ◻ Oxidation ⬜ The drying out of the pavement ◻ Water/Weathering ⬜ Water sits on the pavement surface starting the deterioration process from the surface down.

  4. THIS IS REACTIVE NOT PREVENTATIVE

  5. Long-Term Cost Savings Avon 12:37- 13:37 Proper maintenance of pavements results in longer lasting pavements. Life extension of 5 – 7 years.

  6. ASPHALT CONSISTS OF TWO MAIN FRACTIONS: Asphaltenes: They are the bodying agent in asphalt and when an asphalt ages their content increases causing the asphalt to become brittle. Maltenes: They are the oil fractions of the asphalt. The four fractions each have a function in defining the reactivity or aging characteristics of the asphalt.

  7. Replace the Lost Maltene Fractions

  8. � In-depth Seal, seals pavement surface. � Becomes Part of the pavement. � Not A Topical Treatment � Helps Asphalt Retain Aggregate � Seals the surface of the pavement � Keeps surface flexible � Slows the aging process � Enhances Future Treatment Programs

  9. Application 3 Minutes 7 Minutes 10 Minutes 15 Minutes Sanded at 15 Minutes

  10. Untreated Older Pavement Untreated Treated After Rain Event

  11. Reclamite Test Section After Rain Event (3 Years) untreated treated

  12. UNTREATED UNTREATED TREATED TREATED TREATED UNTREATED UNTREATED TREATED Treated Untreated

  13. Reclamite– Jackson, MO (6 Years Post Treatment) • Paved 2010 • Reclamite Applied 2011 • Picture Taken September 2017 • Treated Untreated

  14. Reclamite– Lombard, IL ( 6 years vs 8 Years Post Treatment) Photo taken Photo taken in 2015 in 2015 Village of Lombard – paved in 2008, treated in 2009 Photo taken Photo taken in 2017 in 2017

  15. Untreated Treated Village of Yorkville, IL

  16. 18 Year Old Pavement TREATED UNTREATED UNTREATED TREATED Untreated UNTREATED TREATED TREATED TREATED UNTREATED TREATED Treated UNTREATED UNTREATED TREATED Village of Yorkville, IL

  17. Email: colleen@cammidwest.com Colleen Cell: 314.267.9313 www.cammidwest.com

Recommend


More recommend