SFO - Boarding Area A - A2 Bus Gate Enclosure January 22nd, 2018 Civic Design Review INTB BAA Gate Enhancements
SITE – PROJECT LOCATION A2 Bus Gate Scope Overall Project Boundary INTB BAA Gate Enhancements
OVERALL PROJECT PLAN EXISTING Overall Project Scope • Aircraft layouts • Gate house modifications • New PBB & fixed lengths Passenger Experience Point 1. Gate A2 Bus Operation 1 INTB BAA Gate Enhancements
OVERALL PROJECT PLAN PROPOSED Overall Project Scope • Aircraft layouts • Gate house modifications GATE A2 • New PBB & fixed lengths Passenger Experience Points 1. Gate A2 Bus Operation 1 GATE A5 INTB BAA Gate Enhancements
BAA – OVERALL AXON INTB BAA Gate Enhancements
GATE A2 – EXISTING PHOTOS INTB BAA Gate Enhancements
GATE A2 – EXISTING - AXON INTB BAA Gate Enhancements
GATE A2 – PROPOSED - AXON INTB BAA Gate Enhancements
GATE A2 – PROPOSED - AXON INTB BAA Gate Enhancements
GATE A2 – PROPOSED – AIRFIELD APPROACH INTB BAA Gate Enhancements
GATE A2 – AIRFIELD APPROACH INTB BAA Gate Enhancements
GATE A2 – EXISTING OVERALL GATE INTB BAA Gate Enhancements
GATE A2 – PROPOSED OVERALL GATE INTB BAA Gate Enhancements
GATE A2 – PROPOSED BUS GATE PLAN – LEVEL 1 INTB BAA Gate Enhancements
GATE A2 – PROPOSED BUS GATE PLAN – LEVEL 2 INTB BAA Gate Enhancements
GATE A2 – PROPOSED ELEVATION INTB BAA Gate Enhancements
GATE A2 – PROPOSED - SECTION INTB BAA Gate Enhancements
GATE A2 – MATERIALS CORRUGATED METAL PANEL METAL STANDING SEAM ROOFING COMPOSITE ALUMINUM PANEL PANTONE 427C CLEAR GLASS WITH LOW E - COATING CONCRETE INTB BAA Gate Enhancements
GATE A2 – EXISTING / PROPOSED INTB BAA Gate Enhancements
GATE A2 – EXISTING / PROPOSED GATE A2 – EXISTING / PROPOSED INTB BAA Gate Enhancements
GATE A2 – EXISTING / PROPOSED INTB BAA Gate Enhancements
Thank You! INTB BAA Gate Enhancements