ivan larsen sales manager clean shore power s er sol
play

Ivan Larsen, Sales Manager Clean Shore Power S er Sol oluti tions - PowerPoint PPT Presentation

Ivan Larsen, Sales Manager Clean Shore Power S er Sol oluti tions Proven Technology developed by FAYARD and Danfoss A Safe proven containerized solution, resulting in Comprehensive Reduction of Emission to Air , Increased Energy Efficiency and


  1. Ivan Larsen, Sales Manager

  2. Clean Shore Power S er Sol oluti tions Proven Technology developed by FAYARD and Danfoss A Safe proven containerized solution, resulting in Comprehensive Reduction of Emission to Air , Increased Energy Efficiency and No Noise from power generation

  3. Back ckgroun und f d for r Clea ean Shore re Power a at FAYARD More than 100 years in the repair service More than 120 vessels per year serviced High demand from Owners requires efficient and safe solutions Clean Shore Power is a natuaral spin off from our innovative: Stabile and reliable power supply 24/7 Correct voltage & frequency at all times Correct monitoring of consumed KWH. SAFETY - at all times.

  4. Typical FAYARD shore connection Quay Shore Shore power established > Engines are stopped connect point No noise! No ship emmision! All cable connections are made by using standard plugs for easy, fast & failsafe connecting

  5. Cost st effecti tive shore powe wer solution f for Ter erminal available today Schematic illustration of actual case in Sweden Network Site Office Self Self contained Existing Shore contained 500 volt, 50 hz. 3x11000 volt 3x500 volt 11 Kv. connection 11 / 0,5 Kv. To Transformer monitoring Transformer 450 volt, 60 hz. station station Power Converter Safe area Hasardous area Stand alone EX ZONE 1 3x450 volt El / Hydraulic Cable handling Control functions 3x450 volt crane Oil pier Sea EX Zone 1 Vessels shore Remote connection control point Vessel Flexibility for vessel: Vessel power and/or Shore grid power availablity

  6. Operati tion on s sequence ces com comply w with vesse ssel a and shore g grid safety r requireme ments Arrival Safety Departure Start Start Monitoring When the safety Switch power on Move the Vessel arrive Banksman control loops are using the remote shore cables at the quay Start the DG’s operates the cable ok power can be control and back to the side handling crane switched on Syncronize quay side Alarming Shore cables are Connect to Syncronize Disconnect Slack the Mooring plugged to vessels grid and with vessels the shore mooring and completed vessels take over load grid and power cables take it away connecting point from the DG’s connect Emergency Shutdown Banksman Vessels crew Turn of shore Take over operates the take over shore Shut down power using Vessel ready load from the cable handling cables and the the DG’s the remote for departure shore power crane remote control control Emergency release End End Benefit for vessel: Switching to clean shore power without ”black-out”

  7. Clean Shore Power S er Sol oluti tions Proven Technology developed by FAYARD and Danfoss A Safe proven containerized solution, resulting in Comprehensive Reduction of Emission to Air , Increased Energy Efficiency and No Noise from power generation

  8. Thank you for your attention www.fayard.dk

Recommend


More recommend