interstate preservation impp roadside features scott
play

& Interstate preservation IMPP Roadside Features Scott Capps, - PowerPoint PPT Presentation

& Interstate preservation IMPP Roadside Features Scott Capps, PE Emily McGraw, PE IMPP Regional Meetings November, 2010 & Interstate preservation Outline Eligible Activities Contracting Requirements Scenarios &


  1. & Interstate preservation IMPP Roadside Features Scott Capps, PE Emily McGraw, PE IMPP Regional Meetings November, 2010

  2. & Interstate preservation Outline � Eligible Activities � Contracting Requirements � Scenarios

  3. & Interstatespreservation Eligible Roadside Feature Activities Drainage Replace/Repair Paved Lateral Ditches � Line/Repair Crossline Pipes � Inlet Repair/Retrofit � Shoulder Drains � Traffic Pavement Markings � Pavement Markers � Signs � Guardrail � Lighting � Attenuators �

  4. & Interstate preservation Contracting Requirements � Individual Projects – Stand-Alone projects on eligible activities � Inclusive Projects Work performed in conjunction with Bridge Preservation or Pavement Preservation activities

  5. & Interstate preservation Contracting Requirements � Condition of feature must be below the performance measure target for most recent Maintenance Condition Assessment � Division can perform assessments on proposed corridor using MCAP criteria. Assets must be below the performance measure target � Assets within the corridor do not meet current design standards in accordance with MUTCD

  6. & Interstate preservation Scenario 1 – Stand Alone Contracts � Lighting Do I need to upgrade or replace my interchange or roadway lighting? � Crossline Pipes Address a series of pipes in a corridor � Paved Ditches Address a series of ditches in a corridor � Striping Address a corridor cyclically every 3 years

  7. & Interstate preservation Scenario 2 – Inclusive with Pavement � Markings and Markers Are you treating the pavement and need to replace markings and markers? � Guardrail Are you treating the pavement and need to upgrade or replace the guardrail? � Paved Ditches Are your treating the pavement and the paved ditches need addressing?

  8. & Interstate preservation Scenario 3 – Inclusive with Bridge � Guardrail Are you doing bridge work and need to address the guardrail ends? � Crossline Pipes Are you addressing a series of bridges and it is appropriate to address crossline pipes in the corridor?

  9. & Interstate preservation Individual or Stand-Alone Contracts � Assessments base on MCAP criteria � SRMU will assist you if needed � Document your needs and thoughts in selecting treatments

  10. & Interstate preservation Inclusive or Conjunction Contracts � Pavements or Bridges will “drive” the location and roadside feature work is “effective in same corridor area” � Document your needs and thoughts when selecting treatments

  11. & Interstate preservation Questions???

Recommend


More recommend